Рет қаралды 6,877
Last week, I struggled with a troublesome grade and flyover that took me three attempts to get right. This week, I get back into the easier stuff and make a lot of progress; building and installing eight more frames to complete the lower peninsula.
If you are in the market for a custom model railroad design and/or build, please contact me at: www.superiormo...