How do SPC control charts work?

  Рет қаралды 42,639

The Engineering Toolbox Channel

The Engineering Toolbox Channel

Күн бұрын

Пікірлер: 36
@SeanMcDonnell33
@SeanMcDonnell33 2 жыл бұрын
amazing video, this should have way more views. I've been searching around for 30 minutes self teaching Statistical Process Control and this video is gold, far better than any of the related videos. Thank you so much for sharing your knowledge and especially in such clear/concise/refined form.
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel Жыл бұрын
Glad it was helpful!
@Jasminlieber
@Jasminlieber Жыл бұрын
The explanation is so clear! Thank you so much!
@criticalrationalism975
@criticalrationalism975 3 жыл бұрын
I love you my brother! I wish you were my instructor. I have said it before and I will say it again you are God sent!!!
@shalinivaz1473
@shalinivaz1473 24 күн бұрын
So well explained. Thank u
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 23 күн бұрын
You are welcome 😊
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 5 жыл бұрын
Hey everyone! Thanks for watching! What'd you think? There's a few more things I want to mention... 🙂 First of all, I do my best to reply to ALL comments so feel to ask questions. I'm happy to help. Second, If you have anything you want me to cover, let me know! This channel is for you so let me know what problems YOU are facing right now...and maybe i have a tool to solve it. Finally, If you enjoyed this video please subscribe! This is a small but growing channel and every subscription, view, like, share, is HUGE for me. Thanks! ~Evan
@conordevaney5679
@conordevaney5679 2 жыл бұрын
Thanks very much, very informative.
@elizabethlively1962
@elizabethlively1962 Жыл бұрын
Very helpful, thank you!
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel Жыл бұрын
So glad to hear it. Thank you for watching :)
@AogNubJoshh
@AogNubJoshh 8 ай бұрын
Hi, that's the difference between a signal within a process that is "in control" and an indication that the process is not in control? It looks as though an out of control process is one that has lots of signals. Is the response to signals if both "out of control" and "in control" not the same between these two states i.e. that you should react to signals and not to noise? How is 'out of control' specifically defined? Thanks
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 8 ай бұрын
This is a good question…In control vs out of control is really a moment in time characterization. So short answer is if you have a signal, the process is out of control and ideally you should take action to investigate why. A process is in control when no signals are detected in the most recent sample. A process is OC when the most recent sample shows an out of control signal. So over a long run, it’s very possible that a process has been both in control and out of control at different time periods. Knowledge of the process, the amount of risk associated with OC datapoints, and resources available to react to them will dictate how you respond to OC data points. If a process is frequently OC, it just means it’s generally a process that goes out of control and needs more attention.
@AogNubJoshh
@AogNubJoshh 8 ай бұрын
@@TheEngineeringToolboxChannel Thanks so much for your fab answer. This makes a lot of sense and makes this method feel much clearer now :) Great video (and enviable Excel skills). I've subscribed.
@rickycaron2177
@rickycaron2177 3 жыл бұрын
Your voice is beautiful!
@glendapeace2061
@glendapeace2061 5 жыл бұрын
Thanks for the video! Question, you say you don’t want to focus on Noise, but what if my intention is to reduce variation?
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 5 жыл бұрын
Great question! I say don’t focus on the noise because looking at each datapoint individually is often a waste of time when the process is in control. If the process is control, it is predictable and attempting to reduce variation on a datapoint by datapoint basis can actually lead to more overall variation. Reducing variation in the overall process requires process or system level changes. Things like new equipment, new procedures, etc. You need to ask yourself if the process is capable of meeting customer demands. If it is, then I would suggest leaving it alone. If it isn’t, then process level chances are where you need to focus.
@glendapeace2061
@glendapeace2061 5 жыл бұрын
Thanks!
@anass918
@anass918 3 жыл бұрын
hay, thanks
@JDWilliamsPD
@JDWilliamsPD 2 жыл бұрын
Bravo!
@mishrazhussaini1920
@mishrazhussaini1920 2 жыл бұрын
can a process be in control and yet not meet the specification? can you please give me an example
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 2 жыл бұрын
Yes. Example: I arrive to work consistently between 8am and 8:15 am every day, but my scheduled start time is 8am. I am in control (predicable and consistent) but I am not meeting my boss’s specification.
@chagantisainath2378
@chagantisainath2378 4 жыл бұрын
Process A has a lot of MORE variations in the data points as compared to the data points in Process B. Can this indicate that process A is not in control compared to process B.
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 4 жыл бұрын
You are correct in that process A has much more variation. That doesn’t mean it’s out of control though! Thanks for watching! Hope you made it to the end where I explain why. 😀
@chagantisainath2378
@chagantisainath2378 4 жыл бұрын
Yes I did ! Thanks for the reply
@SeanMcDonnell33
@SeanMcDonnell33 2 жыл бұрын
Questions... why do the control limits not change over time? It seems the control limits could be recalculated after each new subgroup of data is added. Furthermore, when a control chart is initially created, how do you know how many subgroups are needed to have sufficient data sets to generate a control chart?
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 2 жыл бұрын
The purpose of a control chart is to prevent the process from changing. If the control limits or mean change over time (as more data is collected) then it defeats the purpose of using the chart in the first place. The idea is to measure the process, make sure it is in control, then lock the control limits so you can detect if the process has shifted.
@SeanMcDonnell33
@SeanMcDonnell33 2 жыл бұрын
@@TheEngineeringToolboxChannel This makes sense thank you! However, this part still seems like a chicken and egg situation to me. When you say "The idea is to measure the process, make sure it is in control, then lock the control limits" ... how can you make sure it is in control, if you do not yet have a control chart with locked limits?
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 2 жыл бұрын
You would collect the data for a period of time until you have a good sample size. (usually 10-30 datapoints is enough). The goal of the initial data collection should be to capture the variation you would expect to see in the process under normal operation. Then use that data calculate control limits. If all points are within control limits, lock the limits (do continue not use new data to recalculate mean and control limits). If you have datapoints that are outside the limits, you need to investigate those events to see if you can determine what caused them. If you CAN determine what caused those out of control points, then you would remove them from the control limit calculation, then lock your control limits. If you can’t, you do not have a process that is in control and there is no value in locking limits yet. Process should be mostly in control and/or you can assign a cause to the out of control points before locking limits.
@SeanMcDonnell33
@SeanMcDonnell33 2 жыл бұрын
@@TheEngineeringToolboxChannel I see, makes complete sense! thank you so much!
@cuthwulf
@cuthwulf 5 жыл бұрын
Good video. But at ~6:30 you say there's 7 rules for control charts, but then show 8 on the screen?
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 5 жыл бұрын
Shawn Chavis Thanks for pointing this out. I said there are seven OTHER rules...so the first rule (discussed in this video) plus the other seven makes eight total. :) Be sure to find the video where I go into each rule in depth for more info on this.
@johndoe-uy4ol
@johndoe-uy4ol 2 жыл бұрын
prosses b is clearly in more control the a , reson being the increments of change are lower granted theres no time scale but still
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel Жыл бұрын
Good thinking, but actually that is not the case! The size of the increments alone don’t matter…it’s the consistency of those increments that matters! I.e. do they all vary the same amount or are there outliers that vary more than others. Hope that helps!
@samnooshin6161
@samnooshin6161 4 жыл бұрын
Volume terrible and why the background music? Fix that and it's thumbs up.
@TheEngineeringToolboxChannel
@TheEngineeringToolboxChannel 4 жыл бұрын
Thanks for the feedback! I have very basic audio and editing capabilities because I am a small channel and have no income from doing these videos. I’ve made some changes to my editing process since this video. By the way some feedback for you on how to give feedback....your tact is terrible and why are you complaining about free information? Hopefully this helps! :)
@rkachdocfb
@rkachdocfb 2 жыл бұрын
@@TheEngineeringToolboxChannel Spot on!! Some people just wont stop complaining. Thanks for the free information. All gold dust.
SPC Control Charting Rules
11:20
The Engineering Toolbox Channel
Рет қаралды 44 М.
The 7 Quality Control (QC) Tools Explained with an Example!
16:04
CQE Academy
Рет қаралды 682 М.
СКОЛЬКО ПАЛЬЦЕВ ТУТ?
00:16
Masomka
Рет қаралды 2,6 МЛН
Hoodie gets wicked makeover! 😲
00:47
Justin Flom
Рет қаралды 124 МЛН
小路飞还不知道他把路飞给擦没有了 #路飞#海贼王
00:32
路飞与唐舞桐
Рет қаралды 80 МЛН
CONTROL CHART BASICS and the X-BAR AND R CHART +++++ EXAMPLE
12:16
CQE Academy
Рет қаралды 178 М.
Why is SPC (Statistical Process Control) Important?
33:24
PMC Videos
Рет қаралды 18 М.
Introduction to Statistical Process Control Charts (Lean Six Sigma)
24:15
Statistical Process Control Basic Control Charts
21:05
Rusell Hills
Рет қаралды 30 М.
What is SPC (Statistical Process Control)?
4:08
sixsigmamoneybelt
Рет қаралды 260 М.
Sheet Metal K-Factor (What it is & How to Measure)
4:43
The Engineering Toolbox Channel
Рет қаралды 70 М.
Basics of Control Charts
6:34
Think Lean !
Рет қаралды 8 М.
Unlock the Power of ImR (XmR) Control Charts - SPC with Excel
8:59
The Engineering Toolbox Channel
Рет қаралды 25 М.
Statistical Process Control |  R-Chart (Control Chart for Ranges)
5:01
Joshua Emmanuel
Рет қаралды 317 М.
СКОЛЬКО ПАЛЬЦЕВ ТУТ?
00:16
Masomka
Рет қаралды 2,6 МЛН