The basics of kerb laying

  Рет қаралды 451,098

Tony McCormack

Tony McCormack

Күн бұрын

Пікірлер: 108
@johntate5050
@johntate5050 5 ай бұрын
Respect to the workers out of camera shot playing the fiddles, drums and accordion to motivate their colleagues.
@FiscalWoofer
@FiscalWoofer 4 жыл бұрын
I love the clarity and brevity of language enlisted by the author of these videos! Wonderful gift thank you Tony.
@elstevoyeseooo6472
@elstevoyeseooo6472 5 жыл бұрын
Blagged into a kerb laying job ... this video saved my life lol
@partybwoy8521
@partybwoy8521 4 жыл бұрын
Same here pal start tomorrow
@bodyblow
@bodyblow 4 жыл бұрын
@@partybwoy8521 you been found out yet? 😂
@user-gd4xc2sl5o
@user-gd4xc2sl5o 4 жыл бұрын
Blagged civil job been on internet for last few days learning the lot lol
@luboo4034
@luboo4034 4 жыл бұрын
A think the boy on the bed blagged himself into the job asweel the guy got to knock f@ck out of the kerb to get them down
@anthonykilgannon3443
@anthonykilgannon3443 4 жыл бұрын
I tell you what if you lay the kerbs shown on this video you will be laughed off the job then sacked lol.
@amyfrankie100
@amyfrankie100 5 жыл бұрын
Nice clean work. I would be happy to work with these guys because nowdays there is to many knowalls around who in fact don't have a clue
@bigfootlittefoot5698
@bigfootlittefoot5698 3 жыл бұрын
Thanks you have a kerb laying job tmoro and no experience. Now I will have a good idea of what im doing .
@kananirembert5734
@kananirembert5734 4 жыл бұрын
That guy driving the machine is really good . Great job everyone.
@troyprince9191
@troyprince9191 3 жыл бұрын
We just lay the concrete from a grab lorry then use a cut down shovel depending on what size kerb were laying to level the crete for the bed.
@Mulsilver
@Mulsilver Жыл бұрын
If you have got the eye you dont need a cut down shovel fella😉
@keithwebb658
@keithwebb658 3 жыл бұрын
Nice work lads. Done a bit of this over the years. Can be back breaking but with the digger and scissor lift it takes away some of the hard work. Still a hard days graft though.
@jjm3376
@jjm3376 2 жыл бұрын
Just got my cscs card, would I be able to get onto ground working before labouring
@remotaurog
@remotaurog 5 жыл бұрын
Lot of material used although it's easier to hammer down into deep mix ,always used back face for a line ,very odd time a batch will be different sizes ,checking every 5th kerb for level ,never need to pinch .
@MrManningata
@MrManningata Жыл бұрын
Not really because then you don't have an established race and when it comes to adoption and you fixing all the damaged kerbs, it's gonna be much harder.
@mustafaakadhim
@mustafaakadhim 4 жыл бұрын
we are about to start with this activity so it's nice to watch this video, thanks for sharing
@jeffsoal5715
@jeffsoal5715 2 жыл бұрын
Here in the UK we have to install concrete kerb brace first then the kerb is layed on a max of 30mm bed of sharp sand and cement then backed up with concrete..
@TonyMcCormack
@TonyMcCormack 2 жыл бұрын
Laying on a race is an option. It is not always mandatory. It depends on the client's spec. many local authorities in the north of England as well as in Scotland, Wales and NI prefer laying directly onto a windrow of fresh concrete....that would always be my preference, too.... but I know laying on a race is more popular south of Birmingham and on certain developments. This is something we are covering in the new British Standard (BS 7533:102) - the pros and cons of windrows and races.
@jeffsoal5715
@jeffsoal5715 2 жыл бұрын
@@TonyMcCormack I've always layed on a race most housing association's and council insist on because its easier to replace the kerb if its damaged..
@chickendippers8135
@chickendippers8135 Жыл бұрын
I'm from the southeast and have always laid on a fresh bed
@jeffsoal5715
@jeffsoal5715 Жыл бұрын
@@chickendippers8135 if its on a road it should be on a race, its an adoption requirement it just makes them easier to replace when 1 is damaged, but other areas like carparks ect its usually just on concrete...
@chickendippers8135
@chickendippers8135 Жыл бұрын
@jeffsoal5715 maybe on housing site. On 278 hyway works for KCC I have alway laid directly onto a 150mm fresh bed of concrete
@stuarthillyear7884
@stuarthillyear7884 4 жыл бұрын
If you use a string line on the front of the kerb for the finished height you can use a torpedo level to check plumb to the line and height at the same time .
@jackrambo1999
@jackrambo1999 2 жыл бұрын
Wat is the dry mix used ere ?
@TonyMcCormack
@TonyMcCormack 2 жыл бұрын
It's a standard Gen 3 kerb mix -
@kickboxs77
@kickboxs77 2 жыл бұрын
This is so foreign to me. Here in California if we can’t slip it, we form it in place. I have literally never seen a precast curb (kerb) in person in my life.
@paulmclaughlin1315
@paulmclaughlin1315 Жыл бұрын
Can u send me some info on the set in place style
@radoslavtomov9121
@radoslavtomov9121 Жыл бұрын
Here in Europe it is all precast. I have never seen a curb(kerb) formed in place in Bulgaria.
@johnedwards4410
@johnedwards4410 5 жыл бұрын
I was wondering why if the line was on to the front, the layer was then pushing kerbs over with a pin to that line ? What's the difference then to having the line on the back and doing the same ? Great gang by the way....got to be up there with the best in the UK imho
@TonyMcCormack
@TonyMcCormack 5 жыл бұрын
Even when taking extreme care and trying to lay precisely to a friont-face line, there will always be some error, which is why we do the compliance alignment once the whole line (or a sizable section of it) is in place. This is particularly true when working with curves, arcs and tangent points which, although accurately set-out prior to work starting, can require a bit of tweaking once the kerbs are out on the bed and look not quite as intended. Generally speaking, there is far less re-alignment needed when laying to a front face line than is required if a back edge line has been used.
@markhallford3246
@markhallford3246 Жыл бұрын
There is always a difference in sizes from the kerb mould as well. The front is more accurate to lay to plus the back will be hidden with black....Engineers seem to love to set out to the back though😢
@jakethepro4335
@jakethepro4335 6 ай бұрын
i always wondered how they put kurbs in!
@SUL-KSA
@SUL-KSA 3 жыл бұрын
Could the concrete bed under the curb stone have a rebar reinforcement?
@TonyMcCormack
@TonyMcCormack 3 жыл бұрын
It could, but why? Unless there was an over-riding reason to ensure no cracking,settlement or movement of the kerb line, we wouldn't bother. I *have* laid kerbs onto a reinforced race, designed by an inexperiencd and over-anxious engineer who wouldn't accept that rebar was completely unnecessary. It ramped-up the job cost, and though I can't prove it, I don't think it made for a better kerb line in any way, shape or form!
@parkerjamieson7920
@parkerjamieson7920 5 ай бұрын
Who made this music?
@mohghtil1705
@mohghtil1705 Жыл бұрын
I am building du experience. Is it possible to work with you?
@garethwigmore9352
@garethwigmore9352 4 жыл бұрын
I absolutely hate those massive mauls. Gimme a soft faced thor every day of the week!
@gogadev
@gogadev 3 жыл бұрын
Hi Tony. Is this UK? If so, do use pre-cast Kerbs like this always on the streets? Cos I was of the impressions UK might be also be using kerbing Machines. Lemme know.
@TonyMcCormack
@TonyMcCormack 3 жыл бұрын
There is some slip-forming of kerbs in Britain, but I'd estimate over 95% of work is with pre-cast kerbs. Slip-forming is more common in Ireland, but there's not a lot, to be honest.
@stevew406
@stevew406 2 жыл бұрын
We use a Kerb Race Machine now on newbuild domestic developments, it is getting more common, were are a groundworks company of mid to large size in the South West UK
@Kieranshields89
@Kieranshields89 3 жыл бұрын
Have you any tips on a kerb race with 20mm bed.
@TonyMcCormack
@TonyMcCormack 3 жыл бұрын
That's a whole other video in its own right, but the best tip I can recommend is to *thoroughly* check the levels of the race before you start laying. All too often, the kerb race instalkled by others is a bit up-and-down, making accurate kerb laying a damned nightmare. Check it for level and get it put right, if necessary, before you start lining out kerbs or preparing the mortar.
@Kieranshields89
@Kieranshields89 3 жыл бұрын
@@TonyMcCormack how wet do you have your mortar, (sharp sand or building sand) I’m finding it’s difficult to get an accurate bed, too high or too low and very little tolerance to tweak kerb especially on a radius without kerb sinking
@TonyMcCormack
@TonyMcCormack 3 жыл бұрын
@@Kieranshields89 Always a mortar based on sharp sand. NEVER building sand - too soft. Slump or wetness needs to be reasonably stiff, otherwise the kerb will just sink into it. With practice, you find a mix and slump that works well for you - some like it slightly wetter or drier, but a slong as the kerb ends up at the right level and line, then that's all that matters. I *always* hated laying on a race - give me a windrow of fresh concrete every time, please. SO much easier!
@Kieranshields89
@Kieranshields89 3 жыл бұрын
@@TonyMcCormack was councils request for adoptable road. Doesn’t seem cost effective with the time it takes setting road forms and then pouring concrete and waiting to cure. Your answer matched what we’ve been doing so thankyou 👍🏻
@joniboulware1436
@joniboulware1436 2 жыл бұрын
Pretty old school. Seems like they make a machine that can do miles a day with extrusion. But I can appreciate the techniques for small areas.
@kevinrogalski3524
@kevinrogalski3524 Жыл бұрын
100 m a day gimme good machine man in duck and a labourer with half a 🧠 . Fucking hideous work lol
@fatzz5800
@fatzz5800 2 жыл бұрын
Thanks for the video guys, will help me be prepared for ground working jobs
@mattcartwright8272
@mattcartwright8272 5 жыл бұрын
very informative as always. I knew most of it but not that you pinch them in with a bar to their final position. Thanks!
@CMacEfc
@CMacEfc 5 жыл бұрын
See That I’ve never done get the string line in the right place it makes no sense at all to lay of the line then mess about kicking them all over
@marino846
@marino846 3 жыл бұрын
Altering is only used to make a bend or curve better normally on straight forward runs follow your line
@shuvadey4294
@shuvadey4294 3 жыл бұрын
Ignorant question from a DIYer, the gaps left between kerbstones...are they filled with mortar? Otherwise weeds etc start habitats. Also it may look incomplete.
@TonyMcCormack
@TonyMcCormack 3 жыл бұрын
usually, a 2-5mm gap is left between adjacent kerbs so that there is no direct contact between them which can cause spalling or chipping. Very occasionally, weeds will set up home in there when it fills with wind-blown detritus, but it's rarely a problem. In some situations, the kerbs will be laid with a 10-12mm mortar joint but this slows down the installation rate, which ramps up the costs, and there's no real structural benefit. It's nearly always done solely for aesthetic reasons.
@shuvadey4294
@shuvadey4294 3 жыл бұрын
@@TonyMcCormack Thanks very much Tony for your reply and explanation!!
@johnsomerset1510
@johnsomerset1510 2 жыл бұрын
I thought it was an expansion gap, so it has to be empty.
@sathishkumar-fw4hn
@sathishkumar-fw4hn 3 жыл бұрын
Thanx for the video sir...it was very helpful
@projectxtechnologies9440
@projectxtechnologies9440 Жыл бұрын
I don't let my teams haunch the full length so that I can save on material.
@staceyismine
@staceyismine 3 жыл бұрын
What is the cement ratio
@TonyMcCormack
@TonyMcCormack 3 жыл бұрын
As explained on the accompanying webpage, it's an ST1 concrete
@simonpenney3845
@simonpenney3845 4 жыл бұрын
Whats the concrete mix you used here? Looks pretty dry.
@TonyMcCormack
@TonyMcCormack 4 жыл бұрын
It's a C7.5P kerb mix at 25mm slump - ideal for laying kerbs.
@nahbro5520
@nahbro5520 5 жыл бұрын
Where did you get the rubber hammer? I need!
@TonyMcCormack
@TonyMcCormack 5 жыл бұрын
They are readily available at most contractors' tool suppliers: Greenham; Parkers; Rollins, etc....
@nahbro5520
@nahbro5520 5 жыл бұрын
Thanks! I’m in the US have never seen one, I’ll keep an eye out.
@kevyarham
@kevyarham 3 жыл бұрын
If you get the bed right you don't need a massive maul like that! If your knocking down 30mil that's too much.
@TonyMcCormack
@TonyMcCormack 3 жыл бұрын
It's up to each tradesman to choose the tools used. Many of us were originally trained using wooden mauls or the large rubber/fibre combination mauls. If the result is right, it doesn't really matter whether a large rubber maul is used or a small plastic mallet.
@Patrick.Sanchez
@Patrick.Sanchez 2 жыл бұрын
0:29 That is so moronic. The banksman still has his feet today?
@andrejgarinic2003
@andrejgarinic2003 Жыл бұрын
Good job!
@GKCTPP
@GKCTPP 4 жыл бұрын
great video. thanks
@geraldocoura2079
@geraldocoura2079 3 жыл бұрын
Aí sim parabéns a máquina já
@mortenknielsen2058
@mortenknielsen2058 Жыл бұрын
The line must be on the backside of the kerb👍🏻
@hundui
@hundui 4 ай бұрын
You see I thought that as well but to be fair when we lay them either end of the kerb sometimes the kerbs have a 2-3mm bit on it from where they were cast. It sometimes throws the line out
@ibrahamg299
@ibrahamg299 4 жыл бұрын
God job
@CMacEfc
@CMacEfc 5 жыл бұрын
My old boss would hit the roof about the excess conny in front of kerbs but if it’s a council job like I’m on now No one gives a fck as we say we’re not paying for it , hmm maybe indirectly
@wazamanikurudi9649
@wazamanikurudi9649 9 ай бұрын
Quality video
@PARVIZPARINAGHIPOOR
@PARVIZPARINAGHIPOOR 6 ай бұрын
❤❤❤❤❤
@kimgaxha814
@kimgaxha814 2 жыл бұрын
👏 👏.👌 💯 🙋, very good job s, pls. Same jobs me England, thanks youuuu 👍, Kompany MDS and TRD, 😃 thanks England and your, 👍
@ramandeepdeep5860
@ramandeepdeep5860 4 жыл бұрын
Tnx
@mtb71
@mtb71 2 жыл бұрын
Tidy work
@ac818ajeossi
@ac818ajeossi 4 жыл бұрын
Thanks!Thanks!Thanks!
@CRyan71
@CRyan71 5 жыл бұрын
Remove the level before beating down the kerb or you will need a new level. Bad practice.
@eladiorojasgonzalez7412
@eladiorojasgonzalez7412 4 жыл бұрын
Guena ese chipote chillon
@kevinrogalski3524
@kevinrogalski3524 Жыл бұрын
Hahahahaahahahahahhahahhaha on site using wheel barrow clearly not on the grip. Day rate special . Thought it was RJ McLeods guys
@darkdeivis7
@darkdeivis7 5 жыл бұрын
First of all, too much concrete. Second, string should be in other side for easer job and faster.
@TonyMcCormack
@TonyMcCormack 5 жыл бұрын
There is variation in the width of pressed concrete kerbs, as allowed within the tolerances of BS EN 1340. Consequently, aligning along the rear arris can result in a mis-aligned front face, which is the critical alignment. This kerbing team, in common with the vast majority of other kerb layers, prefer to use a front-aligned line when laying.
@garethwigmore9352
@garethwigmore9352 4 жыл бұрын
@@TonyMcCormack I've been laying kerbs for over 15 years and always used a line at the back of the kerb then prior to backing them up quickly run a line down the face and tap any out to suit. Its also fairly easy to judge the gap when a kerb is a differenr width. In all the years I've done my job I've only come across somebody laying with a line at the face of kerb once. They were laying with the line at the lower water line. Was very strange to see and they were incredibly slow. For me the line has to be at the back and i always lay with a size 5 thor soft faced hammer (Nylon faces) really can't get on well with mauls or a pickaxe.....
@TonyMcCormack
@TonyMcCormack 4 жыл бұрын
@@garethwigmore9352 Horses for courses. I've been involved in kerb laying for over 50 years and this is my preferred method. The lads in the video have served an apprenticeship under a fellow professional kerb-layer with 40+ years of experience. This method works for us. You can choose to work differently if you wish. IMO a tiny "Thor" hammer hasn't the wallop necessary to ensure adequate compaction of the concrete bed. It would be ok for small unit kerbs, possibly for edgings, but not for road kerbs. However, you do it your way - make your own video if you wish - but I'll continue to teach this method and promore it via my website and my training courses.
@garethwigmore9352
@garethwigmore9352 4 жыл бұрын
@@TonyMcCormack my hammer weighs 3.5 kilos. The Nylon faces hit the kerb down far better than a Maul or a pickaxe. I started with Mauls but as soon as i came across the LARGE thor hammers i never looked back. Thor make many different hammers in different sizes. I use a size 2 for edgings and a size 3 for 6x5s. Im from the south west and increasingly over the last 5 or so years kerb layers around here have moved away from mauls and turned to soft faced/split head hammers. Some use leather heads or super plastic. I prefer the nylon faces. They give more bang for their buck and are IMO unrivaled.
@garethwigmore9352
@garethwigmore9352 4 жыл бұрын
@@TonyMcCormack there's also a big difference in compaction when you compare hitting concrete with dull rubber and a relatively hard nylon face. Buy one. You'll be pleasantly surprised....
@grzegorzswierczewski1904
@grzegorzswierczewski1904 2 жыл бұрын
Za mały mlotek🤣🤣🤣
@Sameoldfitup
@Sameoldfitup 3 жыл бұрын
🇳🇺🇬🇧
@cream8701
@cream8701 4 жыл бұрын
That's not how you haunch kerbs
@projectxtechnologies9440
@projectxtechnologies9440 Жыл бұрын
I think its optional. The other method you referring to I think is the one where you don't haunch the full length of the kerb. I prefer that one to save on material
@belhadjfarid2650
@belhadjfarid2650 Жыл бұрын
Manifik
@portuguesehustle5087
@portuguesehustle5087 4 жыл бұрын
what a waste of time....
@mmichael3702
@mmichael3702 4 жыл бұрын
Probably the worst pair of clowns I’ve seen 40 years + experience your having a laugh ain’t you. It’s not cost effective to be laying 40 metres a day a good Kerby will lay atleast 150m a day minimum. Also who uses a huge maul like that for a HB2 kerb
@TonyMcCormack
@TonyMcCormack 4 жыл бұрын
Very unfair to criticise two young apprentices, doing their best, despite being inconvenienced by being filmed whilst installing. Please feel free to create a video showing off your own undoubted skills and open yourself to unnecessary, unhelpful, negative criticism.
@albertdesalvo7273
@albertdesalvo7273 4 жыл бұрын
@@TonyMcCormack Well said, Sir. I thought your video was both very clear and informative. Kudos to the Kerbers in your video. Thank you.
@mdmconstruction
@mdmconstruction 4 жыл бұрын
@@TonyMcCormack i guess don't upload if you don't want to be criticised it is the internet afterall. Or are you scared that possibly other people may have better ideas. nothing wrong in allowing a fresh idea that may improve efficiency to be tested at least. Just because something has been done the same way for 50 years doesn't always mean it is the best method and the only correct way. Innovation is not too scary complacency is your enemy
@beinghuman6799
@beinghuman6799 Жыл бұрын
No one is better than me in the world to laying kerb and slab I m fucking really good and I m just 27 years old started working in construction when I was 19
Randsteine setzen, Schritt für Schritt
3:34
Tipps & Tricks rund ums Haus
Рет қаралды 1,6 МЛН
Quando eu quero Sushi (sem desperdiçar) 🍣
00:26
Los Wagners
Рет қаралды 14 МЛН
小丑教训坏蛋 #小丑 #天使 #shorts
00:49
好人小丑
Рет қаралды 47 МЛН
When you have a very capricious child 😂😘👍
00:16
Like Asiya
Рет қаралды 6 МЛН
Poser efficacement des bordures T1
3:55
tpdemain - La chaine
Рет қаралды 70 М.
Elis Pavaje - How To: montare pavele
3:30
Diana M
Рет қаралды 1,5 МЛН
ОТКАЖИСЬ от этих ФУНДАМЕНТОВ❗️Рейтинг, ХУДШИЕ и ЛУЧШИЕ фундаменты для загородного дома
28:31
Дом Групп - строительство тёплых каменных домов
Рет қаралды 366 М.
Jak osadzić obrzeża pod podjazd?
18:10
Co dziś robimy
Рет қаралды 55 М.
Screeding a paving laying course
4:44
Tony McCormack
Рет қаралды 1,8 МЛН
Gartenweg pflastern
21:37
Florians Gartenwelt
Рет қаралды 1 МЛН
como poner bordillos de hormigón
3:39
Jose maestro albañilería
Рет қаралды 38 М.
How to Pour a Concrete Curb. Step by Step
7:30
Take And Make
Рет қаралды 212 М.
Using String Like A Pro
18:48
Essential Craftsman
Рет қаралды 6 МЛН