As a Gippsland line commuter every day I always check the progress of East Pakenham on my morning commute. It’s coming together nicely, platforms are basically finished with some track works still to go. Glad the bypass tracks are being built, we’ve needed them for years and there’s a reason we’re called the slow boat.
@hazptmedia8 ай бұрын
6:20 I know that Seddon, Riversdale, East Richmond, Moonee Ponds, and Macleod have these PIDs too.
@kclassproductions8 ай бұрын
So does Croydon! Well not anymore I guess.
@JTRAIN8 ай бұрын
These pids are ugly. They don’t show the stations that the train are stopping and not stopping. And it also doesn’t show the next trains arriving
@levonandonian76138 ай бұрын
The new one is too busy, the old one is nice simple!
@hazptmedia8 ай бұрын
@@JTRAIN Well, it’s a bit of nostalgia, I guess.
@hazptmedia8 ай бұрын
@@kclassproductions yep sadly
@ComengProductions8 ай бұрын
Great video mate! I'm exited for the next one.
@pierreinthavong1817 ай бұрын
Very nice video!😁
@thex-wing8 ай бұрын
Yeah did some filming up their a while ago as well as the new East Pakenham Station
@SpotterCrazyperson8 ай бұрын
Nice video
@ianmontgomery75347 ай бұрын
I expect that they will open the stations before they are 100% finished like they did with Noble Park and others.
@kclassproductions8 ай бұрын
I can’t wait for East Pakenham to open, I’m assuming that you will make a video covering it! Are you planning on doing one of these videos for Ringwood East as well? Great video mate.
@ThebusofdoomFSX8 ай бұрын
Thanks! I do intend to visit the new stations once they open.
@knight.Skye.047 ай бұрын
They even changed the LCD screen time table colour to white around Noble Park, to Clayton station
@EOL765528 ай бұрын
wow very nice
@VO5-Vida8 ай бұрын
A skyrail and a bottom rails is Pakenham East also Pakenham
@southeastaviation.8 ай бұрын
Interesting to see how it ends up. I'm basically In Pakenham so I can check what's going on a lot of the time. Its a massive project and with the line being shut soon (I know for v/line unsure about metro) it'll a interesting time without it why they finish it.
@JackStavris8 ай бұрын
Yeah the V/Line shutdown is for about a month. I believe they’re also finally finishing the duplication works at Longwarry & Bunyip during this time too.
@southeastaviation.8 ай бұрын
@@JackStavris Yea Most Likely. Do you know if the coach timetable is the same as the trains. I mean like do they come every hour?
@JackStavris8 ай бұрын
@@southeastaviation. it should be similar to the train timetable. I’ve checked the times I need to get the train and there’s ab equivalent bus.
@southeastaviation.8 ай бұрын
@@JackStavris yeah cheers for that. Wonder what bus lines will run it
@ianmontgomery75347 ай бұрын
@@southeastaviation.I have noticed a couple of buses around Dandenong that are painted in the V/line purple colours but I don't know who is running them.
@Adam-yz5xd7 ай бұрын
Since when were passengers from Melbourne allowed to use Vline to get to Pakenham?
@Comeng_8 ай бұрын
Nice
@VO5-Vida8 ай бұрын
I visit to Pakenham station lol
@biscuitinthesea8 ай бұрын
This is what they should of done on the Armadale Line in Perth instead of shutting it down for 18 months.
@robertbruce21828 ай бұрын
The problem is that areas Like vic park don’t allow for much space to construct next to existing stations, though it does seem smart
@JTRAIN8 ай бұрын
East Pakenham station will be a ground leveled station.
@ianmontgomery75347 ай бұрын
I think I might go and jump on a train to Pak and have a squiz as i have nothing better on the cards this afternoon and it doesn't cost me anything!
@ianmontgomery75347 ай бұрын
Just got back from my trip. The station certainly is taking shape and I think they will open it before they do cladding that they presently can't do because of the existing service. Not much was happening in Pakenham shopping centre though. It appears that the buses might be Dysons judging by what the guys controlling the stops were wearing.
@OfficialRyanx8 ай бұрын
Unrelated note - why do the HCMTs run with 4 pantographs in service?
@ianmontgomery75347 ай бұрын
I would expect that each carriage with a pantograph has a motor that needs power/
@OfficialRyanx7 ай бұрын
@@ianmontgomery7534 But we manage to power a 9 car high speed train with a single paragraph…
@ianmontgomery75347 ай бұрын
@@OfficialRyanxmaybe it is the motor layout that dictates it.
@ianmontgomery75347 ай бұрын
Just got back from my trip. The station certainly is taking shape and I think they will open it before they do cladding that they presntly can't do because of the existing service. Not much was happening in Pakenham shopping centre though.
@JTRAIN8 ай бұрын
Vlocities proceed through this station to Traralgon and Bairnsdale, and back to Melbourne.
@JTRAIN8 ай бұрын
6:21 I hate these pids. It doesn’t show the next 3 trains.
@brisbanepublictransportvlogs188 ай бұрын
They need a cafe car for these long distance trains.
@matthewnorman98038 ай бұрын
I hope the old station gets heritage listed
@TamasKiss-bv9hz8 ай бұрын
👍👍👍❤🤍💚
@andysmetrotrainvlogs81637 ай бұрын
I Know What Comes Next if You’re Confident Construction The New 🆕 train Station
@peterfromgw46157 ай бұрын
When will the level crossings be removed on the Glen Waverley line? It has one of two tram squares left in metro Melbourne but our tax $ are continue to be wasted on works “out the back of nowhere” like Pakenham. Absolute disgrace with the crooked Labour government being run by “Teflon Dan” Andrews’s useless understudy while pandering to the dross who vote for them.