Transformer Turns Ratio Test - Protec Equipment Resources

  Рет қаралды 33,009

Protec Equipment Resources

Protec Equipment Resources

Күн бұрын

Пікірлер: 16
@soe2152
@soe2152 Жыл бұрын
Thank you for sharing. learn a lot.
@ProtecEquipmentResources
@ProtecEquipmentResources Жыл бұрын
Glad it was helpful!
@ukown3839
@ukown3839 Жыл бұрын
Very informative! Where can I find more?? 😁
@ProtecEquipmentResources
@ProtecEquipmentResources Жыл бұрын
Thanks! You can try this video from Tom Sandri from our April 2022 webinar Transformer Testing: Sweep Frequency Response Analysis: kzbin.info/www/bejne/p2eTg5x9hNOhr8k
@abdullahdawdy7084
@abdullahdawdy7084 Жыл бұрын
It was a good video Practically & Theoretically Thanks a lot!!
@ProtecEquipmentResources
@ProtecEquipmentResources Жыл бұрын
Glad you liked it!
@BretHammonds
@BretHammonds Жыл бұрын
@@ProtecEquipmentResources I’m not sure that I understand your question. However, let me see if I can respond in a meaningful way. Are you talking about the voltage drop across the primary winding as a result of its resistive and inductive characteristics? The test equipment measures both the primary and secondary voltages associated with performing a transformer turns ratio test. If there is some reason for a reduced voltage on the primary winding, the secondary voltage should be impacted proportionally. So, if for some reason the output voltage of the test set is less than the expected value, and if a required level of magnetic flux can be maintained in the core of the transformer, then the ratio will be the same even at a lower voltage. The specified error of the test equipment should be far less than what the industry requires in terms of acceptable ratio errors.
@Vision267
@Vision267 21 күн бұрын
How to select the test VOLATGE AND test current
@onesmushangula3116
@onesmushangula3116 6 ай бұрын
Thank you so much!
@mortezakarimi7538
@mortezakarimi7538 Жыл бұрын
The video was decent. I wonder how this device reduces voltage drop error on the primary winding
@ProtecEquipmentResources
@ProtecEquipmentResources 10 ай бұрын
I’m not completely sure of the context of this question, but I am suspecting that it may have been related to the difference in how measurements may at one time have been made as opposed to the way they are currently made from a concern for safety. If we were to apply a voltage to the secondary and measure the voltage across the primary of a transformer, the potential at the primary could be lethal and perhaps more difficult to meter. However, if we were to apply a voltage to the primary and compare it to the secondary, then the voltage is much lower and less difficult to meter on the output of the instrument, perhaps making it more accurate and safer than if we applied a voltage to the secondary.
@greatibekwe1779
@greatibekwe1779 8 ай бұрын
Thanks for the insight. Can this be done with only an AC voltage and a voltmeter
@ProtecEquipmentResources
@ProtecEquipmentResources 8 ай бұрын
You might be able to do this with only an AC voltage source and (2) precision voltmeters. One for the voltage source on the primary and one for the secondary voltage. This might work great for a single-phase transformer. However, when you get into a 3-phase transformer testing, your meters and your source are going to have to become a bit more complex. You will now have to monitor both phase-to-phase and phase-to-neutral voltages and their phase relationships to one another. This is dealt with by having the test equipment (TTR) apply the appropriate vector math for the configuration of the transformer being tested. You will find that most of these pieces of test equipment will calculate accuracies or % error based on having entered in nameplate information. Probably the most significant response to this question is that commercially available test equipment will by necessity have certain safety and convenience features built into them. Automatic Discharge Single Equipment Grounding Point Demagnetizing Feature Easy Access to transformer configuration selections and connection Diagrams Pass/Fail indications based on imbedded industry standards and programed nameplate data. Finally, with a piece of test equipment designed for performing TTR tests, you can have an electronically generated report available for your customer within minutes.
@zmjpower
@zmjpower 11 ай бұрын
Thank you for sharing
@ProtecEquipmentResources
@ProtecEquipmentResources 10 ай бұрын
Thanks for watching!
@QuantumHoghead
@QuantumHoghead 6 ай бұрын
Awesome
Fundamentals of Transformer Commissioning and Maintenance Testing
1:45:27
Performing a Transformer Turns Ratio (TTR) Test with the Raytech TR-Mark III
6:41
Protec Equipment Resources
Рет қаралды 9 М.
"Идеальное" преступление
0:39
Кик Брейнс
Рет қаралды 1,4 МЛН
УЛИЧНЫЕ МУЗЫКАНТЫ В СОЧИ 🤘🏻
0:33
РОК ЗАВОД
Рет қаралды 7 МЛН
Their Boat Engine Fell Off
0:13
Newsflare
Рет қаралды 15 МЛН
ВЛОГ ДИАНА В ТУРЦИИ
1:31:22
Lady Diana VLOG
Рет қаралды 1,2 МЛН
Understanding Insulation Resistance Testing
1:07:28
Protec Equipment Resources
Рет қаралды 3,3 М.
Exploring Power Factor / Dissipation Factor Testing
46:36
Protec Equipment Resources
Рет қаралды 4,1 М.
Turns Ratio Test (TTR ) of Transformer
6:31
The Engineering Power
Рет қаралды 60 М.
How Do Substations Work?
12:38
Practical Engineering
Рет қаралды 3,3 МЛН
Dissolved Gas Analysis DGA Interpretation
18:20
Oil Analysis
Рет қаралды 4,9 М.
Transformer Inspection Walkthrough
17:17
Southwest Electric Co.
Рет қаралды 39 М.
Delta and Wye - Volts, Amps, & VA
13:21
Dave Gordon
Рет қаралды 564 М.
How Buchholz Relays Work
10:56
saVRee
Рет қаралды 180 М.
Current Transformers (CT)
14:31
Eaton
Рет қаралды 514 М.
"Идеальное" преступление
0:39
Кик Брейнс
Рет қаралды 1,4 МЛН