Sir what is Heat affected zone in AT welding, that to be cropped ? And After how much time Wedges to be removed
@Gokulrajpway2 жыл бұрын
HAZ-150mm for AT weld 85mm for FB weld Wedges removal -20minutes after trimming First train -30minutes after pouring
@kingpraveenkumar2872 жыл бұрын
@@Gokulrajpway Tqqq Sir 🙏
@dinesh3301 Жыл бұрын
Where is inner and outer clips
@kingpraveenkumar2872 жыл бұрын
Plzz answer these qstns Sir.. 1.Gauge obtained on a Normal PSC sleepers..? 2.what is Nominal Gauge and Normal gauge in B.G PSC
@Gokulrajpway2 жыл бұрын
For PSC sleepers gauge designed as 1673mm And nominal gauge is 1676mm for BG track
@kingpraveenkumar2872 жыл бұрын
And minimum depth of Cushion for LWR and SWR....plzzz answer sir , I have exam on tomorrow
@Gokulrajpway2 жыл бұрын
300mm for LWR track, 350mm for New, doubling , gauge conversion works... For SWR not mentioned in new IRPWM
@kingpraveenkumar2872 жыл бұрын
Plzz answer sir , 1.Periodicity of Opening and examination of level crossing 2. Periodicity of Overhauling a Level crossing
@Gokulrajpway2 жыл бұрын
Not more than 2years as per IRPWM
@kingpraveenkumar2872 жыл бұрын
Ok Tqqq Sir...
@Raj_mg2 жыл бұрын
ஏற்கனவே தங்களிடம் கூறியுள்ளேன் ஹிந்தி மற்றும் ஆங்கிலத்தில் நிறைய யூடியூப் வீடியோக்கள் உள்ளது ஆனால் தமிழில் குறைவு ஆகையால் தமிழில் பதிவிடவும் ஆங்கிலத்தில் பதிவிட்டதால் டிஸ்லைக் செய்கிறேன்