No video

Uncovering A LOT of electrical BODGERY!

  Рет қаралды 112,455

Artisan Electrics

Artisan Electrics

Күн бұрын

Пікірлер: 156
@matthewseymour8972
@matthewseymour8972 Жыл бұрын
Absolutely loved the light labelled "does not work"
@paulmatthews5470
@paulmatthews5470 Жыл бұрын
If you're on the lookout for DB screws and install MK 3 comp dado often, the end cap screws fit nicely in some metal DBs as long as they aren't tapped.
@williammartinculleton5875
@williammartinculleton5875 Жыл бұрын
Wrong, DB4 Top board, that bare copper link is a factory fitted link correctly rated. Th other one is as you stated. Massive thank you or sharing
@jamieblatantsparky
@jamieblatantsparky Жыл бұрын
I thought that’s too
@williammartinculleton5875
@williammartinculleton5875 Жыл бұрын
@William Tell Yes even Jordan can make school boy errors, no doubt we all have at some point
@JohnSmith-ws7fq
@JohnSmith-ws7fq Жыл бұрын
Neither N9-10 link on DB4B (2:48) nor N5-6 on DB5B (3:42) appears factory fitted or correct.
@trevorstevenson4038
@trevorstevenson4038 Жыл бұрын
I have always found it unusually funny, when you continue to feed the cable despite the other person yelling that they have enough cable haha
@chapman9230
@chapman9230 Жыл бұрын
I live in a modern four bed house with one consumer unit. I planned on moving on retirement to something much bigger. Watching this, I think I will stay put. What gets me is that this stuff looks pretty new and yet has all these issues. The other thing that gets me, is who wants to live with this level of complication in their life.
@andrewtitcombe8378
@andrewtitcombe8378 Жыл бұрын
Love it when a pro likes to climb on another persons work to make them selves look better than the last guy. 2.13 stand all over customers furniture to access panel . like to see that one in the risk assessment .
@Dont-Evan-Bother
@Dont-Evan-Bother Жыл бұрын
Makes you wonder how on earth the guys behind the original work ever managed to become fully qualified electricians.
@Lenny-kt2th
@Lenny-kt2th Жыл бұрын
Same as with drivers and driver's licenses...
@1990themule
@1990themule Жыл бұрын
Who’s to say they were
@aussiegruber86
@aussiegruber86 Жыл бұрын
Most likely not qualified
@moodyga40
@moodyga40 Жыл бұрын
most likely back yard sparks
@BerkeleyTowers
@BerkeleyTowers Жыл бұрын
For us non-pro's, what was the issue with the extension lead off a breaker? Apart from looking amateurish, from a regs/theoretical pov, what are the issues? If the cable is glanded into the box properly and of an appropriate size with the correct size MCB/RCD etc for the cable, isn't it just another radial circuit?
@BerkeleyTowers
@BerkeleyTowers Жыл бұрын
Anybody? Nobody?
@TheAviation101
@TheAviation101 Жыл бұрын
The only issue really is that the cable is not secure, a clip would sort that out. If you tug on the cable, you risk the connection becoming loose as it is currently
@user2C47
@user2C47 Жыл бұрын
Once you cut the plug off that cord, you instantly void the product's certification. It was also never certified in the first place to be connected directly to a breaker. While I'm not familiar with building codes in the UK, but I imagine using a non-certified product is very illegal.
@TheAviation101
@TheAviation101 Жыл бұрын
@@user2C47 not at all. You can do modifications but now you take responsibility for it. Usually the cable has its own certification/ specification such as h05 and is perfectly rated for terminating to a breaker. You might just want to ferrule the end
@BerkeleyTowers
@BerkeleyTowers Жыл бұрын
@@user2C47 You might have a point, but I'm not sure what's valid in your State/Country necessarily applies here. I think if the cable is to a BS or harmonised European standard, it would be ok. You can easily get the component parts of an extension lead which would comply if those parts are built to the relevant standard. Fixed installations of flexible cables are allowed with caveats. This is where UK regs can get "woolly".... Various trade bodies would regard such an installation as "not advisable", but it's not illegal. As always, if it all goes horribly wrong, a Judge might well ask you to justify going against such guidelines.
@Shaggy-8392
@Shaggy-8392 Жыл бұрын
Every electrician comes along and says the last one was shit.
@steve11211
@steve11211 Жыл бұрын
Unfortunately its part of the industry, complaining it should be a C2 instead of a C1 but then saying cover missing on busbar that would be behind the front cover so completely within regulations is a C2... I personally dont think you should bitch too much about others EICR's as they are an engineering judgement so is open to interpretation, it should be based on regulations but the regs are so woolly that it can lead to differences of opinions.
@lewis94uk
@lewis94uk Жыл бұрын
Every tradesman
@tocboatman
@tocboatman Жыл бұрын
Not sure every electrician, certainly some. I had an electrician in a rental property we own recently telling me an installation was bad, he'd forgotten he'd done the installation I do have electrical qualifications and was able to show it was OK (distance of ceiling light from shower cabinet), he was just trying to create some work. Was utterly shameless when I called him out on it.
@steve11211
@steve11211 Жыл бұрын
@@tocboatman yep, im a fully qualified spark but needed someone in London to do an EICR for my partners rental, he came back with FI because he didnt check the light switches had a fly lead from switch and back box because he didnt want to damage decoration.. The light switches tested good as having an earth and had at least one fixed lug so didnt even need a fly lead but when he went back and checked they had them anyway.. So and FI which means it fails and needs investigating so you would have to potentially damage the decoration anyway, like you say just trying to get more work..
@Lenny-kt2th
@Lenny-kt2th Жыл бұрын
The shoddy work you keep finding never ceases ta amaze me.
@bsmith2053
@bsmith2053 Жыл бұрын
I always laugh at the comments about "dodgy" DIY'ers" etc. But if you have a think a fair amount of the issues you appear to find are actually done by qualified trade staff.
@artisanelectrics
@artisanelectrics Жыл бұрын
Worrying isn't it?
@msutton3147
@msutton3147 Жыл бұрын
I agree with this, I am also disappointed when I hear "Bodge jobs from Electronic Engineers who think they know what they are doing" my father was an electronics engineer and spent 10 years training before being qualified. To quantify them as some type of idiot compared to an Electrician is simply not very fair.
@davideyres955
@davideyres955 Жыл бұрын
@@msutton3147 I have to say it does get a bit tiresome to hear “DIY Bodge” as the comment when he’s already listed a hell of a lot of installation failure by clearly a qualified or pretending to be qualified electrician. It would be far more productive to say why this was so bad rather than rant about the DIYer who did it when you don’t even know if it was one who did it. I can’t think why someone would consider wiring a multi plug extension lead directly in to MCB, but then again as an IT geek what would I know 🤬
@jons6125
@jons6125 Жыл бұрын
@@msutton3147 I think he meant different areas of specific knowledge not idiots. Obviously someone could do something that works without hurting themselves but it still not be correct under electrical installation standards.
@5pr1nk57
@5pr1nk57 Жыл бұрын
​@@msutton3147 Some of us are qualified electricians, electronics engineers and IT techs! 🙋‍♂️
@guy4469
@guy4469 Жыл бұрын
When i was growing up as a kid we had a semi detached house house, when we went on holiday our neighbour went under his floor boards knocked through the wall in too our house and wired his house too ours . our bills were huge .
@electrician247
@electrician247 Жыл бұрын
I think we need to see the duck impression again. Just to make sure it's close enough to perfection 😂
@artisanelectrics
@artisanelectrics Жыл бұрын
🤣🤣🤣
@TheRoybeasley
@TheRoybeasley Жыл бұрын
I have little or no understanding of what you are doing, beyond first principles. Yet I still find it really interesting to watch.
@Spark101.
@Spark101. Жыл бұрын
The busbar cover being absent doesn’t warrant a code providing the CU cover is only removable with use of a tool. (It isn’t a code 2 as you suggested)
@Mainly_Electrical
@Mainly_Electrical Жыл бұрын
That what he said a 2 ?
@GenZbaby2000
@GenZbaby2000 Жыл бұрын
I died with Jordan and the duck at the start 🤣🤣💀
@MagicianMan
@MagicianMan Жыл бұрын
Jordan..... time 8:40 "Eddi should be wired of a 20A Double Pole Switch....." - That's not correct. "The Eddi device should be connected to a single-phase 230V or 240V nominal AC supply. The supply should be from a dedicated 16A circuit breaker, or it can be from a hard-wired 13A fused spur outlet if the heater load is less than 3kW."
@robertburrows6612
@robertburrows6612 Жыл бұрын
A very big bug barer of mine is SWA not terminated properly. I carry a set of taps and dyes to repair dbs , because of damage screw and cross threaded screws
@CoastalElectricalGowr
@CoastalElectricalGowr Жыл бұрын
Guys can you please collect all of your cable trimmings into a box or a bucket as you go. It's not acceptable to just flick them on the floor, essentially outside. Why did Lee refit the Zappy back on the cobweb/ dust covered wall without giving it a brush off first? Apart from that, good work.
@KenJustice_uk
@KenJustice_uk Жыл бұрын
haha I'm 100% one of the bodgery committing "IT nerds and electronics engineers who think they know what they are doing"
@chrisfox8125
@chrisfox8125 Жыл бұрын
Great content as always! Where did you get those rubber inserts for the stuffing glands? Need something just like that!
@UCCLdIk6R5ECGtaGm7oqO-TQ
@UCCLdIk6R5ECGtaGm7oqO-TQ Жыл бұрын
Possibly from a Wiska Winsert Kit.
@mienmoeke
@mienmoeke Жыл бұрын
I'm just happy if something is tagged at all. Even if it is just with a sharpie. The tagging has to be correct,though.
@vjaceslavprants6258
@vjaceslavprants6258 Жыл бұрын
no busbar cover is c3. most of the faults found are just not neat installs, doesn't mean its unsafe.
@matty-hu6yf
@matty-hu6yf Жыл бұрын
No code
@s.kxx1956
@s.kxx1956 Жыл бұрын
The irony of the last electrician/inspectors company name on the stickers on the db’s ! 😂
@gorillaau
@gorillaau Жыл бұрын
Must have been proud enough of the work to put their mark on it. Trouble is who is able to tell what they did and what was legacy back jobs.
@tomlowe4156
@tomlowe4156 Жыл бұрын
I think any unused cables in a distribution board should have all conductors connected to earth. Otherwise, whilst being extremely unlikely they could become live and not necessarily from touching a live conductor inside the DB. There’s a potential for it to happen somewhere on the cable run or in the back of an accessory etc. Just good practice in my opinion
@matiis1368
@matiis1368 Жыл бұрын
Agree, have always C2’d floating cables in DB’s for that reason.
@OkenWS
@OkenWS Жыл бұрын
Have to agree - as a meter fitter we were expected to isolate and instruct the customer to call an electrician whenever we saw hanging cables. If I had done that, I probably would've isolated hundreds of customers in three years and created a lot of nothing-work for electricians - and trashed the reputation of meter fitters even more. I just don't understand why people leave hanging cables everywhere - it simply introduces doubt in the minds of the next duty holder to turn up to do work.
@andrew7440
@andrew7440 Жыл бұрын
However you then run the risk of that unused cable becoming live in the event of a fault. I agree with terminating to earth unused cores on a multi core wire, but not spare cables. Especially if you don't know where the other end is.
@danimayb
@danimayb 11 ай бұрын
No no no, Not spare cables at least! They could become live during a fault... And You know the outcome of that if connected to earth.
@litz13
@litz13 Жыл бұрын
These fascinate me. Rules there are so different than here in the US. The ceiling of my basement, as found when I bought my house, would have given you guys a collective stroke. 😅
@jamieblatantsparky
@jamieblatantsparky Жыл бұрын
Jordan , please stop pointing, electricians don’t point , your finger was an inch from that busbar while your doing a piece to camara , also cat 5 cable is for data not for CT,s it’s videos like tho s that make everyone thinks it’s ok and it should be a belden cable twisted pair , it’s easy to tell this as it’s what ever single act is supplied with
@artisanelectrics
@artisanelectrics Жыл бұрын
Sorry 👉
@jamieblatantsparky
@jamieblatantsparky Жыл бұрын
@@artisanelectrics hey don’t be sorry to me it’s the EAWR that you need to say sorry too
@jonnyw4724
@jonnyw4724 Жыл бұрын
Aren’t you supposed to fix C1’s at the time, as they’re immediately dangerous?
@iwayini
@iwayini Жыл бұрын
Cheers for the video guys!
@Sean-fj9pn
@Sean-fj9pn 4 ай бұрын
I'm not a professional electrician but not even I would make some of these "mistakes" or be happy with the quality of some of the work shown.
@andrew7440
@andrew7440 Жыл бұрын
If you want spare threaded screws, get a case of assorted threaded screws from screwfix or similar. You can generally find a match. But those Eaton boards are a pain, I can't believe they never made the screws captive!
@2391Sparks
@2391Sparks Жыл бұрын
I don’t think that much of the previous testers to be honest let alone the installers. Good video 👍
@mr2gti
@mr2gti Жыл бұрын
Never letting you see how I got power to my shed! You'd rip me to shreds lol. Great content gents.
@user2C47
@user2C47 Жыл бұрын
Mine is fed by a 16 gauge extension cord into a very overfilled J box. It was meant to be replaced with proper SE cable and a breaker panel, but as we all know, there's nothing more permanent than a temporary solution.
@rorygrice5758
@rorygrice5758 Жыл бұрын
The multibox lead wired directly into the board at 5:00 doesn't violate code that I know of where I live(New Zealand). Dont get me wrong, it is Jank with a capital J. But sometimes Jank is a pretty good solution. Sure, running the multibox off a single plug socket would be better, but if you have a multibox with a damaged lead, why not reduce reuse and recyle by curing off at the damaged part of the lead and putting it to good use instead of the landfill? So long as the customer is happy that it works, costs them a little bit less to implement, and complies with your electrical code, why not embrace the Jank every once in a while when you have the opportunity to do so. Don't tell me you don't love that shit. We all saw the look on your face at 5:21.
@user2C47
@user2C47 Жыл бұрын
Once you cut the plug off (or damage the cord), that product is no longer compliant and can't be used. Not only that, but it was never listed in the first place to be connected directly to a breaker. Even knowing that, I still would have probably connected it exactly like that if it didn't have to be inspected.
@alerighi
@alerighi Жыл бұрын
@@user2C47 What are you saying? What is the difference of buying a powerstrip without the cable and one with the cable fitted and cut off the plug? That thing is probably not elegant, but either not dangerous, assuming the breaker is properly sized for the extension lead and the cable (10A or less with 1.5mm2 cable), there are a bunch of power supply attached anyway. I see this done a lot where I live and it's perfectly fine, usually this is done in a similar situation (where it's just lazy, just fit sockets come on) but to power strips that are attached to desks or in racks of equipment. If you need a lot of sockets in a location using a power strip is cheaper (for example where I live a schuko socket of a basic like like Gewiss is no less than 10 euros, plus you need the box and the faceplate, while a 6 places power strip costs like 6 euros), it's faster to wrire (you connect one cable, and done), and doesn't present any code issue. Of course you have to use appropriate cable up to code (that is in my country no less than 1.5mm2) and double insulated even for the short run that comes into the power strip.
@Rabarebane
@Rabarebane 11 ай бұрын
@@alerighi two things: 1) didn't show whether the flex cable leads were ferruled - possible bad connection, specially if the breaker had solid lead also connected and 2) the breaker is probably oversized for the usual .75 mm^2 extension cord cable, both creating possible fire hazard inside CU. It is true, that it would not be much safer if there was a single outlet and THEN overloaded extension cord, but the line has to be drawn somewhere and at least in my country it is between fixed installation and user-connectable stuff.
@jennyli7749
@jennyli7749 Жыл бұрын
In uk to be reassured that the solar installer is going to do a good job is to find one that’s MCS registered which is an industry led quality assurance. Scottish government loans make it mandatory to use a MCS registered company. It’s not a legal requirement to register as MCS though and that’s where your problems come from.
@Spark101.
@Spark101. Жыл бұрын
The loose T&E in the CU is a code 2. It’s a bare ended cable, not adequately terminated or capped off to prevent the copper ends touching live parts inside the CU and subsequently making the other end live. It is no different to free floating cores inside a switch for instance that hasn’t had a choc block or wago popped on the end.
@dasy2k1
@dasy2k1 Жыл бұрын
Unterminated ends bother me too.... But then again I'm a railway signalling engineer.... And Clapham Junction shows why they aren't a good idea
@RB-lt8kt
@RB-lt8kt Жыл бұрын
A Faraday cage is not just a metal box as its used to block electromagnetic fields, electrician taking nonsense as the metal box can reduce or interfere with the sensors signal but its not a Faraday cage (a brick wall can reduce signals transmitted through the air). Some Electronics engineers know a lot more than you do so don't put them all in the same pot. There are many sparky's who cut corners like the ones who installed bathroom down lights using terminal block and wrapping the connections in insulation tape and stuffing them under loft insulation (halogen bulbs in down lights). They also used bits of plastic pipe to try and prevent insulation covering the down lights that just fall over and this was found in a 15 year old house by an electronics engineer.
@eliotmansfield
@eliotmansfield Жыл бұрын
Be careful about throwing rocks about IT Nerd diy work - because it many cases its substantially better than so called professional work. Your video of you trying to wire in that ecoflow changeover unit and making a complete mess being a good example.
@user2C47
@user2C47 Жыл бұрын
While I'm well aware that it's not up to code and voids the product's listing, my first response to that extension lead at 5:00 was "There ain't _nothin'_ wrong with that!"
@paulf3353
@paulf3353 Жыл бұрын
Yeah, this is pure ignorance, I've seen as many bad jobs done by "professionals" as bad jobs done by "DIYers". The only difference professionals do charge you a lot for work.
@bigshoe9130
@bigshoe9130 Жыл бұрын
Nah man DIYers and techy guys are the bane of any electrical installation. It’s just embarrassing whenever you turn up-to a job and see what they done. The best part is is that they are so proud of themselves for making it ‘work’…. You don’t know what you don’t know. Your right though - there are bad electricians out there.
@zerobatsu
@zerobatsu Жыл бұрын
Let me know when you’re in California and you can come fix my house 🤣
@peternutt5646
@peternutt5646 Жыл бұрын
Nice work boys
@pah9844
@pah9844 Жыл бұрын
Do you think this is the same for a 23 plate?. Took mine to the local garage to fit and they couldn’t work it out as said no holes.
@stephenhamlin5996
@stephenhamlin5996 Жыл бұрын
That loose cable in the board should be coded. They should of terminated all cores down to earth. Potentially the cable could touch the busbar or the like and become live
@pljones75
@pljones75 11 ай бұрын
Cut out fusses DO NOT protect the incoming supply cable.
@paulf3353
@paulf3353 Жыл бұрын
I mean really, what's wrong with properly wired extension directly from a consumer unit? Assuming fuse and wire gauge is correct? Is it not safe?
@seanfindlay9887
@seanfindlay9887 Жыл бұрын
Lee looking scruffy give him a disciplinary
@BillsCountrysideAdventures
@BillsCountrysideAdventures Жыл бұрын
Proper job lads ❤❤
@reargiro5102
@reargiro5102 Жыл бұрын
What do you mean when you mean C2 C3 or C1??
@artisanelectrics
@artisanelectrics Жыл бұрын
C1 - immediately dangerous C2 - potentially dangerous C3 - improvement recommended
@reargiro5102
@reargiro5102 Жыл бұрын
Good to know
@crundwell1
@crundwell1 11 ай бұрын
Using Wago’s on data causing issues with high resistance over time. Much better to use IDC crimps.
@delrey-p
@delrey-p Жыл бұрын
These videos make me think I'm in the wrong trade lol
@moodyga40
@moodyga40 Жыл бұрын
looks like a whole heap of fun must me a big humpy
@roystevenson1375
@roystevenson1375 Жыл бұрын
What's a harvey?
@Sixta16
@Sixta16 Жыл бұрын
5:05 Whats wrong with terminating an extension cord directly like this? If it is terminated correctly, fused properly, I see nothing wrong.
@danieljadorie829
@danieljadorie829 Жыл бұрын
What are these C1s 2s and so on? Is that the severity of the violation? I'm a US industrial electrician so I'm not familiar.
@user2C47
@user2C47 Жыл бұрын
C1 - Imminently dangerous. C2 - Potentially dangerous. C3 - Improvement recommended. Copied from the uploader's reply to another comment.
@Mallyhubz
@Mallyhubz Жыл бұрын
LOL I tape my LAN cables to my drill bits to route them at home, and of course I don't wire my extension leads right into the board 😅
@artisanelectrics
@artisanelectrics Жыл бұрын
😂
@Kackspack0815
@Kackspack0815 Жыл бұрын
What does CT clamps do?
@UCCLdIk6R5ECGtaGm7oqO-TQ
@UCCLdIk6R5ECGtaGm7oqO-TQ Жыл бұрын
They provide a contact-less means to measure current flow in a conductor.
@JensenPGATourDriven
@JensenPGATourDriven Жыл бұрын
The thumbnail picture look like you got new Premises, Great video interesting guys ⚡️👊
@artisanelectrics
@artisanelectrics Жыл бұрын
Thanks 👍
@philware1546
@philware1546 Жыл бұрын
Why have optimisers on those solar panels. Looks like there's no shading?
@davidjones6779
@davidjones6779 Жыл бұрын
EICR is a formal inspection and therefore should be of a universal standard. BUT it's not. It doesn't seem any electrician sings off the same song sheet. They all have their own opinions, this I feel is wrong.
@MarkUKInsects
@MarkUKInsects Жыл бұрын
This weeks two mystery words are befuddled harvi. Or is this the wrong channel? Do I still get a goody bag for spotting them?
@gorillaau
@gorillaau Жыл бұрын
I want listening properly as its early morning at time of writing. I was thinking "Harvey? Who is Harvey? "
@Daleeather1975
@Daleeather1975 Жыл бұрын
What’s some of the scariest single and three phase installation you have seen ??
@bryan8686
@bryan8686 Жыл бұрын
How much would a full re wire be think it would be easer
@steve11211
@steve11211 Жыл бұрын
Artisan prices thats got to be a left arm and a right leg at the very least... For the profit of that rewire Jordan would be able to afford another electric VW van..
@2036scott
@2036scott Жыл бұрын
@@steve11211 It may be expensive, but at least it is a job well done, if you pay peanuts you get monkeys as you can see from the prior workmanship.
@michaellowery1559
@michaellowery1559 Жыл бұрын
Thank God! They got you guys to do Job Right!😃
@Kackspack0815
@Kackspack0815 Жыл бұрын
What does C2 and C3 mean?
@andrew7440
@andrew7440 Жыл бұрын
It is a measure of the severity of the observation noted. C2 potentiality dangerous, C3 improvement recommended.
@zjzozn
@zjzozn Жыл бұрын
Nice 🐸
@pow1983
@pow1983 Жыл бұрын
By the sounds of it they've paid twice and then some for their solar panels... wonder if they will get a return of their investment during their lifetime
@marymadigan9707
@marymadigan9707 Жыл бұрын
Nice one guys 😎🇮🇪👏
@artisanelectrics
@artisanelectrics Жыл бұрын
Thanks!
@Allegedly2right
@Allegedly2right Жыл бұрын
My Heat Pump uses 50kWh a day when it goes minus 2 a 4 bedroom 125m floor space how bad is that no one wants to know.
@kevxsi16v
@kevxsi16v Жыл бұрын
The MEM 3 boards are good so at least someone cared. I have been to farms much worse than this like the one I was in last week that still has black rubber from when electric was brought in in 1947.
@andrew7440
@andrew7440 Жыл бұрын
And the farmer says, "nothing wrong with that, been working since the 1950s...."😂
@andybarron6572
@andybarron6572 Жыл бұрын
I'm an IT nerd AND an electronics engineer and I would NEVER have connected an extensioon lead into the CU. 😜😜
@oninbridders
@oninbridders Жыл бұрын
2:20 should you ever hide a consumer unit? That should be a C3 in itself. Power goes out and Mrs Jones trips in the darkness because she can’t find it.
@user2C47
@user2C47 Жыл бұрын
In the US, that would be a code violation due to minimum requirements for open space.
@andrew7440
@andrew7440 Жыл бұрын
Same as the height, wouldn't comply with building regs Part M on s new build, but they can't be applied retrospectively.
@backacheache
@backacheache Жыл бұрын
Don't see why it was necessary to use derogatory language about computer and electronic technicians, we are all at the sharp end of dealing with customers so let's have some cameradery
@henkondemand
@henkondemand Жыл бұрын
I knew that line was going to blow some fuses with the IT and engineering crowd. Engineers and IT guys to tent to be tinkerers and that can lead to questionable experiments sometimes, he's not wrong on that in my view. Maybe it could have been worded more sensibly for the more sensitive IT/engineering folks.
@Rabarebane
@Rabarebane 11 ай бұрын
@@henkondemand well, tbh, most IT infra (including cabling) techs look at electricians the way electricians look at plumbers.
@petraspetraitis3355
@petraspetraitis3355 Жыл бұрын
under the picture.
@mattde
@mattde Жыл бұрын
Still struggling to get on-board with the voice overs!
@rossthompson1635
@rossthompson1635 Жыл бұрын
I like this presentation style, has a lot better flow.
@jackreid7
@jackreid7 Жыл бұрын
“C2 no busbar cover” C3 at most
@andrew7440
@andrew7440 Жыл бұрын
Yes, considering it needs a tool to remove the CU cover, and the CU should be off when cover is removed, it is technically not really an issue.
@tomorichard
@tomorichard Жыл бұрын
That second neutral link is factory fitted isn’t it??
@SuperWayneyb
@SuperWayneyb Жыл бұрын
🤘😎🤘
@intherealworld7705
@intherealworld7705 Жыл бұрын
Fair play to him snagging his own jobs on KZbin
@Cmdad
@Cmdad Жыл бұрын
Another farmer scrimping for pennies I see
@oliverpapps7840
@oliverpapps7840 Жыл бұрын
Do you subtract the time you spend presenting to the camera from the hourly work cost you charge the customer, and do you seek permission from the customer to show the interiors of their property? Does any of the money you make from KZbin lead to reduced costs to the customer?
@juliebtech200
@juliebtech200 Жыл бұрын
😂😂😂
@Jimbobb12
@Jimbobb12 Жыл бұрын
First comment
@havoctrousers
@havoctrousers Жыл бұрын
Why a C1 or C2 for a missing busbar cover? The homeowner is never going to take the cover off the CU and skilled and instructed people like ourselves know not to touch a live busbar!
@bulletbullet7902
@bulletbullet7902 Жыл бұрын
One day content creators like you will not inject music into your videos. I so look forward to that day. I couldn't finish watching it as the music in the background was doing my head in.
@therealzman6177
@therealzman6177 11 ай бұрын
I feel like this guy is arrogant and lets off a bad aroma....
@neilmick6778
@neilmick6778 Жыл бұрын
Electrical nerds should stop fitting smart devices and leave it up to the IT guys.
@gorillaau
@gorillaau Жыл бұрын
The communication cabling guys would argue that they are best for that job.
A MAJOR ELECTRICAL TRANSFORMATION! - Consumer Unit Upgrade
17:39
Artisan Electrics
Рет қаралды 62 М.
The Greenwich Meridian is in the wrong place
25:07
Stand-up Maths
Рет қаралды 834 М.
ISSEI & yellow girl 💛
00:33
ISSEI / いっせい
Рет қаралды 24 МЛН
Schoolboy Runaway в реальной жизни🤣@onLI_gAmeS
00:31
МишАня
Рет қаралды 3,7 МЛН
The WORST Socket Wiring I Have EVER Seen!
32:18
Artisan Electrics
Рет қаралды 124 М.
Heat Geek Gives His Verdict on John’s Nightmare Heat Pump
35:46
Skill Builder
Рет қаралды 607 М.
Smart Meter Disaster!!
16:33
Rygol Electrical and Renewables Bristol
Рет қаралды 60 М.
How to Wire an Electrical Panel - Good Workmanship
27:38
Electrician U
Рет қаралды 251 М.
WORST DIY ELECTRICS I'VE EVER SEEN! 🤯
22:52
Artisan Electrics
Рет қаралды 662 М.
10 Common Mistakes DIYers Make In Circuit Breaker Boxes
13:55
LRN2DIY
Рет қаралды 2,4 МЛН
DIY Off Grid Three Phase Power - Part 1/2 | ØY22
28:42
Cory Mac - ØY Electrical
Рет қаралды 80 М.
Customer wanted to go off grid! So we did this...
30:14
Artisan Electrics
Рет қаралды 147 М.
I DON'T EVEN KNOW WHERE TO START! 😳
19:42
Artisan Electrics
Рет қаралды 74 М.
Horrific LED tester that can literally kill you - (with scary schematic)
15:48