Updating Progress in P6: Benefits of Retained Logic, Progress override & Actual Dates

  Рет қаралды 17,471

Plan Academy Inc.

Plan Academy Inc.

Күн бұрын

Пікірлер: 23
@PlanAcademy
@PlanAcademy 2 жыл бұрын
Need to learn P6? Check out the best Advanced P6 Training Available online: www.planacademy.com/
@troyeubank1228
@troyeubank1228 4 жыл бұрын
I think of the Actual Date option as middle ground between Progress Override and Retained Logic. It uses available actual dates rather than remaining date to perform the calculation. This will behave like retained logic for in-progress out-of-sequence tasks, but like progress override for completed out-of-sequence tasks. Stated another way, logic behind the DD is treated as if scheduling in Progress-Override and logic beyond the DD as if using Retained Logic. I typically use this option only when I need to record progress beyond the datadate and still want to show tasks progressed beyond the datadate with the driving indicator for the associated pred or successor. It makes active logic traces a little easier without completed tasks showing as driving unless there is duration after the DD. However, I agree that it's best to use Retained Logic for any "official" schedule reporting.
@project2080com
@project2080com 3 жыл бұрын
Agree, Troy
@muhamedessawy3662
@muhamedessawy3662 2 жыл бұрын
Yes agree but when it’s recommended to use it??
@ninerout399
@ninerout399 Жыл бұрын
Actual Dates runs as Retained Logic until there is an Actual Date applied after the Data Date then that one activity is treated as Progress Override. Using Actual Dates allows the illogical use of Actual Dates after the Data Date while not flagging an error in the Schedule Log.
@PriyankaVijayMohan
@PriyankaVijayMohan 3 жыл бұрын
Actual dates : as the name suggests considers actualized logic to show impact . This is helpful when you actualize and update logic prior to rolling DD. Ex : We update our schedules weekly and make sure we address every current week planned activities (current filters on),give new forecast and only then roll Data date. "Actual dates" help in such scenarios.
@br_velo
@br_velo 2 жыл бұрын
Thanks for this. Using a similar update process and wish I’d known this earlier.
@project2080com
@project2080com 3 жыл бұрын
Hi Michael, about the Actual Dates option it impacts the Late / Early dates. So some floats may change because of it
@Lifehacksflakes
@Lifehacksflakes 4 жыл бұрын
😂😂😂Actual dates , I don’t know . I like your comment on that . Thanks a lot
@ckryegrass11
@ckryegrass11 4 жыл бұрын
anybody on here ever take the course from these guys???
@berik84t
@berik84t 10 ай бұрын
Hi Michael, thanks for useful videos. I have questions there. Is it correct way if we use all 3 options (depends which we need) during the progress updates? I mean, firts month using retain logics, second month with override logics,... sixth month again with retain logics and etc. When/where we can choose them on right way? If we change it every month (for example) we may get different critical paths and also finish date can be unstable (can get back).
@PlanAcademy
@PlanAcademy 10 ай бұрын
You could do that. It's a setting in the "schedule options" screen. These options are set and saved with each project. So you would have to manually change them on each update project.
@TKV007
@TKV007 4 жыл бұрын
Progress override is not a preferred scheduling option since it ignores the network logic
@EngrFesan
@EngrFesan 9 ай бұрын
Sir, do you have a video about the total budget cost minus the expense actual cost to give me the remaining cost. something like that.
@fsuchek
@fsuchek 2 жыл бұрын
Great video and explanation! One question: What is the difference between update schedule using the button F9 "Schedule" and the button "Update Progress"? Thank you!
@brandyharding7692
@brandyharding7692 2 жыл бұрын
Exactly the same. It is simply a shortcut for us DOS shortcut users from back in the day.
@momunyokol
@momunyokol 2 жыл бұрын
When I Update the actual costs the costs in the previous period changes. Why?. How do I make p6 to maintain the previously entered values when I entre the current values
@herminiocruz6636
@herminiocruz6636 3 жыл бұрын
Regardless whether retained logic or progress over ride, the actual should be before the data date. Activity H is done, so to my understanding activity H should be before the data date?
@mahansor8295
@mahansor8295 4 жыл бұрын
Many thanks
@muhamedessawy3662
@muhamedessawy3662 2 жыл бұрын
When it’s recommended to use actual date ??
@murtazaghulam8862
@murtazaghulam8862 3 жыл бұрын
Hi sir May I course syllabus
@RR.1963
@RR.1963 Ай бұрын
Nothing understood, you are not goos teach r
How to effectively export a P6 schedule to PDF?
8:48
Plan Academy Inc.
Рет қаралды 19 М.
小丑揭穿坏人的阴谋 #小丑 #天使 #shorts
00:35
好人小丑
Рет қаралды 10 МЛН
CAN YOU DO THIS ?
00:23
STORROR
Рет қаралды 41 МЛН
How it feels when u walk through first class
00:52
Adam W
Рет қаралды 26 МЛН
Não sabe esconder Comida
00:20
DUDU e CAROL
Рет қаралды 52 МЛН
Why Half-Step Progressing is so Important!
6:55
Plan Academy Inc.
Рет қаралды 3,4 М.
Primavera P6 Layout for EASY Earned Value Analysis
8:52
Plan Academy Inc.
Рет қаралды 13 М.
Are YOU Using this Primavera P6 Float Paths Feature?
10:06
Plan Academy Inc.
Рет қаралды 17 М.
Resource Loading in Primavera P6 - 5 Tips to make it EASIER
8:11
Plan Academy Inc.
Рет қаралды 31 М.
How to Update a Schedule in Primavera P6
9:45
PJM Scheduling Services
Рет қаралды 27 М.
import progress updates with actual dates to primavera p6
10:32
Planning Engineer FZE.
Рет қаралды 26 М.
This Project Schedule Was SQUEEZED! How to tell.
8:46
Plan Academy Inc.
Рет қаралды 2,7 М.
小丑揭穿坏人的阴谋 #小丑 #天使 #shorts
00:35
好人小丑
Рет қаралды 10 МЛН