Welland Canal Time Lapse - Priestly Demolition

  Рет қаралды 233

Concrete Pictures

Concrete Pictures

Күн бұрын

Welland Canal Locks 1 and 2 Upgrade: Connecting the St. Lawrence to the Great Lakes.
The Welland Canal is a crucial transportation route. PDI has been tasked to remove 2500 cubic metres of concrete down 6 sections (each 100 feet deep) of canal wall to make way for an upgraded system tie-up system that will modernize the process moving ships through the canal and increase the efficiency of this transportation hub.

Пікірлер: 1
@rickjeronimus3337
@rickjeronimus3337 3 ай бұрын
Cool👏👍
Hurdman's Bridge Demolition WOW  - Priestly Demolition
21:59
Priestly Demolition Inc.
Рет қаралды 239 М.
Why 3D Printing Buildings Leads to Problems
15:44
Stewart Hicks
Рет қаралды 803 М.
Running With Bigger And Bigger Lunchlys
00:18
MrBeast
Рет қаралды 133 МЛН
小蚂蚁会选到什么呢!#火影忍者 #佐助 #家庭
00:47
火影忍者一家
Рет қаралды 67 МЛН
How To Assemble A Bridge
6:04
Concrete Pictures
Рет қаралды 497
A day at Miggins sidings.
8:03
My Escape.
Рет қаралды 260
Raising 1,200 Metres of Train Tracks in Toronto
11:00
Concrete Pictures
Рет қаралды 74 М.
How Do You Steer a Drill Below The Earth?
14:53
Practical Engineering
Рет қаралды 4,2 МЛН
What's Below in the Welland Canal.. Winter Maintenance 2023
7:17
Niagara Scenes
Рет қаралды 14 М.
"One Of A Kind" Douglas Fir Bridge - Indigenous Partnership
16:26
Concrete Pictures
Рет қаралды 7 М.
4 Myths About Construction Debunked
14:36
Practical Engineering
Рет қаралды 2,1 МЛН
Running With Bigger And Bigger Lunchlys
00:18
MrBeast
Рет қаралды 133 МЛН