Work Breakdown Structure

  Рет қаралды 166,833

vacasanto

vacasanto

13 жыл бұрын

The work breakdown structure is a fundamental part of defining project scope. Used to identify the project deliverables, the WBS starts at a high level and decomposes the project deliverables to a work package level. At a work package level it is possible to determine which activities are necessary to produce the deliverable and achieve the project objectives.

Пікірлер: 31
@quickmake3d22
@quickmake3d22 7 ай бұрын
This is one of the best examples of WBS I've seen.
@valariegriep3843
@valariegriep3843 8 жыл бұрын
I love the clarity and accuracy of this explanation! I've assigned it to my University of Minnesota students to help them understand this important concept. Thanks for posting this!
@jimcrawford8835
@jimcrawford8835 7 жыл бұрын
My pleasure.
@jimcrawford8835
@jimcrawford8835 4 жыл бұрын
Pleased I could help.
@umerk2305
@umerk2305 7 жыл бұрын
I am a current student of "project Management" class and only a minute and half into this amazing easy to understand and very detailed tutorial video. I cannot thank you enough for this master piece of invaluable tutorial. Thank you so very much Sir.
@jimcrawford8835
@jimcrawford8835 7 жыл бұрын
Thank you for your kind words. I'm glad I could be of service.
@robertjennings5558
@robertjennings5558 8 жыл бұрын
This is the best explanation of the WBS. Thank you for commitment and this awesome video.
@jimcrawford8835
@jimcrawford8835 4 жыл бұрын
My pleasure.
@anesastevenson7822
@anesastevenson7822 10 ай бұрын
This is Awesome. Simple and effective
@RJuddCelisversatility
@RJuddCelisversatility 8 жыл бұрын
You really explained it very well. Thank you very much! ~Greetings from the Philippines~
@jimcrawford8835
@jimcrawford8835 7 жыл бұрын
I'm glad I could help.
@jimcrawford8835
@jimcrawford8835 10 жыл бұрын
@Dizzzais - I would reply but bluefoxicy's answer nailed it. This thing is a tool to help you prevent having parts of your project falling into the cracks. Level of detail has everything to do with where your role is in the program. The older I get the more important things like this become (to help think it through and then later to help me remember)
@bluefoxicy
@bluefoxicy 11 жыл бұрын
It depends, really. You will need enough levels to manage the work. A project manager may define a 4 level WBS on some legs and a 2 level on other legs; and then a Team Member may approach a Work Package by decomposing it into its own WBS. The PM may only need to manage, say, "Pour foundation"; while the team member may need to examine the footprint, prepare the plot, determine material needs, obtain the materials, mix the cement, place rebar, tie rebar, pour cement, cover, etc.
@NevaehBeatez
@NevaehBeatez 3 жыл бұрын
A WBS is really just a shopping list of things you need for your project
@liyulong1632
@liyulong1632 11 жыл бұрын
very well explained
@wajay2006
@wajay2006 8 жыл бұрын
Excellent. I understood WBS now.
@mkj2300
@mkj2300 11 жыл бұрын
Great lesson on preparing a WBS!!! I wish I had known about this much sooner. Do you have any other PM lessons beyond the Requirements and Scope ones?
@jimcrawford8835
@jimcrawford8835 7 жыл бұрын
I used to teach (and do) project and program management. I've since retired and stopped doing the videos but lately I've been thinking I might do some more. They seem popular.
@akashahridzuan9023
@akashahridzuan9023 6 жыл бұрын
How to build that wbs chart? any software u used?
@kat_inspired913
@kat_inspired913 Жыл бұрын
What app do you use to construct the wbs?
@hiepnguyen220
@hiepnguyen220 3 жыл бұрын
Thank you very much for video. I am searching tips how to incooperate UniFormat | MasterFormat in Mw. Project. Please advise me if you have somthing in mind.
@jimcrawford8835
@jimcrawford8835 3 жыл бұрын
Your request went right over my head. The interweb tells me that UniFormat MasterFormat are standards used in American building design and construction. It also suggests that Mw. Project is, perhaps, a Malawi water project in Africa. Unfortunately I have a computer background (enterprise architect and program manager for a Fortune 100 company) and don't know much of anything about building standards. (Sorry).
@king0vdarkness
@king0vdarkness 2 жыл бұрын
6:06 how is the restaurant design already known?
@SurvivalEmporium
@SurvivalEmporium 10 жыл бұрын
A whole huge airport project and you managed to start talking about the burger restaurant aspect hahahahahaha! Americans really do love burgers
@jimcrawford8835
@jimcrawford8835 7 жыл бұрын
Well...we definitely relate to them.
@AlergicToSnow
@AlergicToSnow 10 жыл бұрын
@dizzzais. You clearly have never tackled a large project
@Dizzzais
@Dizzzais 11 жыл бұрын
this is too detailed. to many levels
@jimcrawford8835
@jimcrawford8835 7 жыл бұрын
My last big project before retiring was an intranet infrastructure for the US Navy and Marine Corps. 790,000 desktop workstations world wide. It had MANY more levels than this simple airport example. As you move on to bigger and bigger programs the extra detail becomes essential. That said, if your work requires less detail and a simpler hierarchy then feel free to use a diagram that is more simple. The approach can scale to match what you are trying to do.
@randyranderson1621
@randyranderson1621 4 жыл бұрын
Could just say break down or break up, decomposing sounds weird and morbid.
@jimcrawford8835
@jimcrawford8835 4 жыл бұрын
Thanks for the observation. After 30 years in the IT industry I find nothing weird or morbid about process decomposition. Like in nature, decomposition is breaking big complex things down into smaller elements that are simple and much easier to understand.
Develop Work Breakdown Structure (WBS)
9:40
DCOptima
Рет қаралды 79 М.
3.2 Work Breakdown Structures
15:26
Andrew Bell - Project Management
Рет қаралды 57 М.
Heartwarming: Stranger Saves Puppy from Hot Car #shorts
00:22
Fabiosa Best Lifehacks
Рет қаралды 21 МЛН
Самое Романтичное Видео ❤️
00:16
Глеб Рандалайнен
Рет қаралды 6 МЛН
Who has won ?? 😀 #shortvideo #lizzyisaeva
00:24
Lizzy Isaeva
Рет қаралды 41 МЛН
5.4 Create WBS (Work Breakdown Structure) | PMBOK Video Course
11:23
David McLachlan
Рет қаралды 15 М.
Difference between Work Breakdown Structure(WBS), PBS,  RBS and OBS
5:24
Pieter Rademeyer
Рет қаралды 1,7 М.
Work Breakdown Structure (WBS) in Project Management Explainer Video
16:06
Five-Level Work Breakdown Structure
8:03
Dartmouth Engineering
Рет қаралды 118 М.
Top Tips for Developing a Work Breakdown Structure (WBS)
33:46
Stephen Golding
Рет қаралды 471 М.
Work Breakdown Structure demonstration
8:58
Andy Kaufman
Рет қаралды 120 М.
PMP Exam:  Earned Value Management  - Part 1, Basic Concepts
9:27
SirGanttalot
Рет қаралды 357 М.
Collecting Requirments
11:04
vacasanto
Рет қаралды 8 М.
Creating a Work Breakdown Structure (WBS) in Project Management
10:39
Work Breakdown Structure Best Practices
6:45
Adriana Girdler
Рет қаралды 16 М.
Heartwarming: Stranger Saves Puppy from Hot Car #shorts
00:22
Fabiosa Best Lifehacks
Рет қаралды 21 МЛН