The black fabric is called geotextile. Whichever company did the original civil engineering design should have specified the locations where it needed to be installed. Not the fault of the local contractor who was following the plans and scope of work they were given.
@michaelsuperawesomechannel2 ай бұрын
@@JAHMAREK ok thank you very much for the information and thanks for your comment
@GregoryMilesz2 ай бұрын
MSA, isn't that the same brown looking marl Chec is putting back in? What's going on?
@michaelsuperawesomechannel2 ай бұрын
@@GregoryMilesz yes it is I ask the question on I get no answer
@Dalesadventureandtravel2 ай бұрын
Chec needs to apply a second layer of asphalt from the roundabout to Seaforth.
@GregoryMilesz2 ай бұрын
Chec is the main contractor who is responsible for the work. If a second layer is required, why would Chec sign off on the initial work and waited this long to install it or have it installed?
@michaelsuperawesomechannel2 ай бұрын
@@Dalesadventureandtravel I really would love that too but I ask on they say no only were bad on need to be fix okay
@waynegrant1582 ай бұрын
So much work again
@michaelsuperawesomechannel2 ай бұрын
@@waynegrant158 yes they have to blame them safe on this thanks for your comment
@waynegrant1582 ай бұрын
@@michaelsuperawesomechannel yeah fi real bro
@ballatelli35262 ай бұрын
Thats not York, thats Seaforth elder
@michaelsuperawesomechannel2 ай бұрын
@@ballatelli3526 really the building Mark York anyway thanks for your comment
@patelcruickshank88392 ай бұрын
A lie them telling about water.The work never done properly from day one
@michaelsuperawesomechannel2 ай бұрын
@@patelcruickshank8839 yes exactly so thanks for your comment