I don't know how you'd present it, but It would be cool to see how class ones and short lines go about soliciting new shippers. What are some of the data points that shippers are looking for from Railroads? What are numbers and statistics that peak railroads interests? Do they just cold call every business in a region close to home rails and ask if they'd like to ship by train? What does that conversation sound like?
@rdcambell4242Күн бұрын
I grew up on Melvin Ave from 1981-87. And one of the few memories I have from living there is watching the go by through the mail slot of the front door, also waving to the guys in the caboose.
@SapienzBuchse2 күн бұрын
Thank you this was interesting and gave me a good view of how dispatchers keep track of their trains. After watching your video, I was wondering what happens at midnight when a new train sheet for the new day is started. The train sheet is security critical as it the dispatcher must use it to identify all opposing Extras and arrange protection before issuing a clearance to a new Extra. There is exists a similar sheet the "Zugmeldebuch für Zugleitbetrieb" in Germany for the German form of track warrant control. Whenever the dispatcher runs out of space on a page, he or she has to transfer the current status of the railway to the new page before using it. I wondered if there was a similar transfer at midnight between train sheets. After a bit of searching I found out that this is not the case for train sheets. Trains originating after midnight are put on the new day's train sheet while trains still running are continued to be tracked on the old train sheet. This means that during the wee hours of the night, the dispatcher is juggling two of these giant sheets. How did I learn this? One unfortunate rookie dispatcher forgot to check the old train sheet properly when creating the first new Extra of the new day. This happened on the BN in 1984 and let to a fatal cornfield meet. The NSTB wrote a report with an explanation how train sheets were supposed to be handled at midnight. If you want to read the report too, search for "NTSB RAR 85/06"
@tedfisk12112 күн бұрын
Interesting information that clearly showed the financial situation of the CNW. It would be interesting to understand how the employees reacted.
@killerbee63102 күн бұрын
They didn't seem to hide the fact very well they were posturing themselves for the fight over crew reduction. So I assume a lot of people saw it for what it was.
@shmoop24812 күн бұрын
Wow does that train sheet from the Valley Sub bring back a ton of memories. Lots of familiar names on there from when I started hanging around the yard at Appleton in the mid 70's. Jerry Reader, Earl Bond, Pat Molitor, JF Schindlholz, and even what looks like Wally Koehn over on the left side of the sheet on WD53. 52 and 53 were the jobs that worked out of Jefferson Jct, I believe. Yes, more often than not, 299 did meet 296 at Appleton. Since both worked there, 299 would basically come up whatever yard track was open and not necessarily the siding. I vividly remember, after getting my first scanner in the late 70's, that as they passed each other in the yard, each train would call out "299" and "296" over the radio to identify themselves. 296 would almost always have to wait a spell for their pickup since Job 03 would be switching out the cars from Job 02, as well as the 1st Appleton and 2nd Appleton switch runs plus whatever other traffic came from Appleton or the Soo Line interchange and make up the pickups for 296 and 299. Thats when I would have a chance to talk to the crew on 296, and more often than not, get invited into the cab by the regular crew while they waited. Wally Koehn, who was on 297 and 290 by the time I was hanging around there, I believe was the last steam qualified engineer and he ran the 1385 when it went through the Valley in 1984. With all of the paper business generated around Appleton and off the Kimberly Sub, I was rather surprised to see that 296 only picked up 8 cars that evening. As for 299 and their "Shannon" work, Shannon's was a food distribution center on the NE side of Appleton and 299 worked it almost every night during the week. When they would leave Appleton, The engineer or fireman (Earl Bond and Tom Conroy for the longest time) would call the operator and ask him to "Call Shannon and have them open the door." Pat Molitor I met while he was working one of the Kimberly Sub Switch runs. He was quite the character. When the Alcos showed up from MN in the early 80's the RS3/11 became the regular switch engine at Appleton. Pat lovingly wrote "Sputnik" on the side of it because it was such an odd looking beast. I am a little curious about the comment of 281/282 running to Adams. I'm not sure that's true. 281 and 282 were old Ashland Div trains that ran from Ashland down to Fond Du Lac, although I do remember seeing an old train sheet or something somewhere from years before (60s or 50s?) where 282 did run from NFDL down to Clyman Jct, where the train then took a LEFT and went to Butler. There were two trains that did run from NFDL to Adams via Clyman Jct, but those were trains 471 and 472 to Altoona or Minneapolis. Those trains used to run (as 71 and 72 I think based on old timetables and such) to Green Bay via Merrillan and Marshfield and Eland, but CNW stopped using that line as a through route in the mid 70's I believe. I remember hearing the FDL operator on my scanner calling 471 and 472 on the radio at times. So many more names from NFDL that I dont see on the train sheet but still remember vividly. Not to mention the old "Antigo guys" I got to know around Appleton at that time, since the Appleton yard jobs, switch runs and the Kaukauna yard job were all old Ashland Division jobs. Excellent video and commentary by both of you. It brought back a ton of memories, and I kind of wish railroading was still like that. I am eligible to retire this year after 31yrs with CNW/UP.
@killerbee63102 күн бұрын
Good gosh - thank you for your recollections. So cool. I didn't expect this video to draw a large viewership due to its narrow focus but figured those that did watch it would enjoy it. Plus I wanted to do something on train sheets for my own edification. I might do another one, taking another train sheet and going over each sub and what ran that day. I was with CNW 1981-1987 but down at 165 N Canal.
@25mfd2 күн бұрын
you hired on the same year i did... where do you work out of? i hired on out of butler yard
@tedfisk12113 күн бұрын
One aspect that maybe you cover in a different KZbin is Force Majeure. What is an example of a force majeure event? Typical force majeure events include natural disasters (fire, storms, floods), governmental or societal actions (war, invasion, civil unrest, labor strikes), and infrastructure failures (transportation, energy). Railroads have used this legal term in more recent years and it does cover a lot.
@RockerSteve733 күн бұрын
The Ridge Runner line.
@killerbee63102 күн бұрын
Yep - I always think of the TRAINS magazine article on it way way back when
@jimg64763 күн бұрын
Great explanation of train sheets. I was an engineer for 50 years and had friends in the dispatchers office. Would go visit the ds office and the dispatchers would come ride in the field with myself and others.
@killerbee63102 күн бұрын
Thank you. I wanted to expand my knowledge of them so when I met Rod recently it was the golden opportunity.
@foosqust3 күн бұрын
Great stuff. A couple of notes based on the video- Cut off is the Jct on the north side of Sheb on the passenger line mp 54. The passing siding though town was also a helper district and the yard crew would get an extra days pay every time a shove was needed. Lastly, there is still a hot box detector at Belgium today.
@bobozo3893 күн бұрын
I have some of the old train sheets from BO Tower in Kalamazoo (Conrail), from the late 1970's into the 1980's. Penn Central did not use Morris code since the NYC days (pre 1960's). My cousin has the train sheet showing the Freedom Train in 1976. Thanks for sharing this!
@killerbee63102 күн бұрын
Yes, video format is great, allowing the dissemination of information like this.
@stanpatterson50333 күн бұрын
There's a ton of information on those sheets, IF you know how to read them. It's more interesting after Mr. Ewart helped interpret the information, and I could picture the progress unfolding as he read and spoke about it. Also enjoyed his comments about the ''rail busters'', the big road locomotives. While I am not directly involved in Rwy operations, as a truck driver, I have been to places in many of the towns mentioned in today's episode, so it became even more interesting trying to picture operations happening in those towns some 45 to 50 years ago. Thanks for this episode, and thanks to Rod also, for his time and expertise.
@killerbee63102 күн бұрын
And thank you for taking the time to comment. I was lucky to run into Rod awhile back and have him readily agree to go over the sheet and provide his comments. This is something I have been wanting to do for awhile...just never had the right person until now.
@denmarkwispurtrains353 күн бұрын
Great job Killer Bee
@killerbee63102 күн бұрын
Thanks. It was darn cold that day - my hat off to the conductor. I had it easy....
@25mfd3 күн бұрын
cool vid... i worked as a switchman for CNW... hired on in sept 1993... i worked the shoreline sub for a bit on that sheboygan coal train... that was a fun assignment but the working hours were beyond *BRUTAL* that assignment always had the big AC six axle units for coal service... also, the overtime was unlimited... the trainmaster never harassed that job about the heavy overtime it got... reason why was the compensation for that job came from a different budget and not from the trainmasters terminal budget... that coal train was always good for $100K/PLUS per year easy
@killerbee63102 күн бұрын
Interesting memories...thank you. As a former Trainmaster, you are just happy the work gets done with one crew and you don't have to dredge up a recrew.
@FOXYhogger3 күн бұрын
Junction City on the Superior sub still uses its morse code station call; JO. I’m not sure, but EZ further up on the Superior sub, near South Itasca, may be another one. Are there more?
@killerbee63102 күн бұрын
Ya, all thru the WC, the former Soo Line dispatchers kept the JO symbol alive and it seems to have stuck for good.
@bestfriendhank14243 күн бұрын
There’s a lot of old school terms still used like “OS”. The day of the old timers passing down that info of what things mean or meant is quickly passing. I had to laugh when he was mentioned that only 4 axle units could do industry work. Same applies today, but worse! That’s what I liked about operating on the CN. They didn’t seem to be afraid to spend money on upgrades to be efficient.
@killerbee63102 күн бұрын
Rats - I forgot to ask him whether they used the "OS" term. I once watched a CNW Escanaba to Green Bay train switch Oconto with a GP9 they had to cut off from their SD45 consist to go on some lighter rail to pick up a loaded refrigerator. It also helped when switches faced the wrong way.
@bestfriendhank14242 күн бұрын
@ I know on the UP out west we would inter-changeably use the term “OS” to refer to an action/movement in or around a control point. I have heard “OS” to mean: 1) On Sheet. 2) Operator Station. We had a local manager once that wanted to switch an industry that only could be accessed with four axle units. None were available, so he wanted us to shove in with 30 or so cars to pull and then spot the customer. A lot can go wrong by doing that while being see-sawed through multiple track switches and such. With an experienced crew and while not being close to “a quit”, it could be done. 🤣 I found it interesting him talking about the trains to Adams that made the turn at Clyman Jct. That must have been after the lines that went to the Wis Rapids and Wausau way were torn up.
@bestfriendhank14243 күн бұрын
There’s a lot of old school terms still used like “OS”. The day of the old timers passing down that info of what things mean or meant is quickly passing.
@johnwinter82733 күн бұрын
Living along the Shoreline Div in Sheboygan, this was interesting.
@killerbee63102 күн бұрын
Glad to hear. I figured this video would find a narrow but enthusiastic audience.
@denniscoleman88023 күн бұрын
Wow wow wow!!! Such great memories!! Road the CNW Twin Cities 400 and the Milwaukee Road Hiawatha countless times as a kid! Last time on 400 I was 16. Hiawatha last trip I was 17. So many sites I remember….Milwaukee is my home town…CNW’s Lake Front station, Milwaukee road depot..so many great shots !! After a 4 year stint in USAF I hired out in February 1974 on the CNW locomotive shop at Butler Wis. After a 36 year career I retired from UPRR. So glad I found this channel 👍👍😎
@killerbee63102 күн бұрын
Thanks - you made my day !! I am always churning out more.
@DogRedful3 күн бұрын
Thanks Bee! Another great nuts and bolts railroad operations video.
@killerbee63102 күн бұрын
It was fun to make, although the filming and editing was a little bit of a challenge. But it still came together.
@ironmule5 күн бұрын
Could you tell us the brakemans activities? Hooked up air lines at this point...set brakes on this car etc. on future videos. Thanks
@killerbee63102 күн бұрын
OK, thanks for the idea. Basically they did all the ground work. Depending on the assignment, the railroad, local practices, etc., the amount of work the conductor also did would vary. When I was a kid and watched the GTW local freight that switched my home town, most conductors would be on the ground along with the brakemen helping with the work. But there was one who couldn't walk very well so he exercised his prerogative as the boss and stayed in the caboose and left all the work to the two brakemen. On GTW at least, the brakeman in the caboose was technically the flagman. Oh boy, now we are going down a rabbit hole....
@ironmule2 күн бұрын
@killerbee6310 maybe not exactly what these guys are doing but like "at this point the brakeman would set the brakes etc." Just for us dummies. Thanks
@bernardmueller56765 күн бұрын
Wow. Amazing. Thanks a lot.
@killerbee63102 күн бұрын
Absolutely. Thank you for commenting.
@dmcry6006 күн бұрын
Thanks for this VERY informative video. I have always wanted to run my own Short Line RR, but it wasn't meant to be. With all the changes over the years, I m now glad I didn't. I still am interested in Short Line Railroading, but have lost the desire to run one. Merry Christmas and Happy New Year!!!!
@killerbee63102 күн бұрын
A belated Merry Christmas and a Happy New Year to you too. Starting up a short line is not for the faint of heart, plus it helps to have a lot of money you can burn through. Seeing everything you had to go thru, I never had an interest myself to do so, but have a few friends that successfully did. So I guess I am in the faint of heart category-LOL.
@AGWPresident6 күн бұрын
Another great video with drawings. Thanks.
@killerbee63102 күн бұрын
Glad you liked it. Yes, I realized I don't have to actually be there to film the moves - the drawings suffice. In fact, I received a comment a little while ago on the Denmark video that I illustrated with pictures that he wanted the animation!!
@hippleshappenings67007 күн бұрын
Can trains run engineer only anymore?
@TheNorthwestWind7 күн бұрын
very informative!!!!
@killerbee63102 күн бұрын
Thank you. This covers about 1% of what someone has to know, but it is a start-LOL.
@tedfisk12117 күн бұрын
great information
@tedfisk12117 күн бұрын
always interesting
@Jleed9897 күн бұрын
I’d like to ask a question but the comments gestapo won’t let me
@stevenconnolly79077 күн бұрын
Awesome materials. Please do videos on Reciprocal Switching Fees and Haulage. Lots of these issues before the STB right now. I actually just found out Haulage over trackage rights isn't a permitted use. 🛤️
@bestfriendhank14248 күн бұрын
A lot of work would have been saved in that last exercise if the freight just stayed on the main for all the moves. I’m sure there are operational rules that outlaw the move or other reasons.
@thomasboese37938 күн бұрын
I love these videos, they remind me of the switching problems in MR decades ago. The double saw-by is always fun.
@thomasmackowiak8 күн бұрын
Thank you for another interesting video of potential switching problems< KillerBee! Your solutions to these switching problems turned out to be simple moves that did not take much time to perform. (Posted on 23 December 2024 at 1443 CST.)
@TheGrover19688 күн бұрын
These are very interesting videos.
@desertrat518 күн бұрын
A refresher course is always appreciated
@coxsj8 күн бұрын
Always a treat KB. Thanks mate! Happy holidays to you and yours. Hope 2025 is a great one for you too!
@bobozo3898 күн бұрын
These three I was aware of. Non the less, I like the way you explain all the moves. Happy Holidays to you and yours!
@donaldfoltz46498 күн бұрын
Wow, what a special video. Some great shots of battling winter in the UP. So sad so much of the railroading has died.
@killerbee63108 күн бұрын
Well, you need something to haul and most of that dried up unfortunately. But we have the memories...
@johnwinter82738 күн бұрын
Like those switching puzzles. I think I may have told you that in the past. My HO layout is a switching layout with 16 customers to switch. Most take only 1-2 cars. The largest is a co-op that takes 8 cars. Keeps it interesting.
@joshuabessire91699 күн бұрын
Just as I thought! Same as a long distance telephone call! The wizards did it!
@btraindavidlemke31210 күн бұрын
I remember the FRV owned this line. It was still connected,until WCL cut it off south. FRV ran a night train I remember.
@markiewodi337110 күн бұрын
Killer Bee, I dunno how I missed this but fantastic. That’s the first time I think I’ve seen an actual train behind the plow, pretty cool stuff from up Nort! Keep em comin!
@killerbee63108 күн бұрын
Thank you. I was lucky to stumble into access to the video.
@markiewodi337110 күн бұрын
Thanks KillerBee! Love your informative videos! Keep em comin!
@killerbee63108 күн бұрын
That is the plan !!
@Nderak10 күн бұрын
what type of car is a JBS car?
@killerbee631010 күн бұрын
JBS Packerland is a slaughterhouse (opps - I mean meat processing facility) that FOXY serves on their way back from Denmark to Green Bay. The facility receives both covered hoppers and tank cars for loading rendering. Some of the tank cars have the JBS emblem on them.
@rrgak403111 күн бұрын
I would like to see an all animated version of these switching moves. The photos don't help the process.
@bestfriendhank142411 күн бұрын
It’s 2024 Mr. Killer Bee. Fresh meat facility not slaughterhouse. 😂
@killerbee631010 күн бұрын
LOL - guess I am non-PC. Still live in the past.
@bestfriendhank142410 күн бұрын
@ Boomer 😜
@bestfriendhank142410 күн бұрын
@ what do think is eventually going to happen with the Medford Sub, save or scrap?
@JohnS-jj9by11 күн бұрын
Great video! Good detail of the switching process. How long did this take?
@killerbee631010 күн бұрын
The switching or making the video? The conductor said this was the first time he had worked this job by himself on a Sunday plus he had double the cars - took him maybe two hours?? But as said, he took the time prior to them arriving to line up the train so everything was all blocked up. I do not know how much time that consumed.
@JohnS-jj9by10 күн бұрын
@@killerbee6310 Thanks! Yes, I was curious as to how long the actual work took on the road. Great video.
@Milwroad4ever11 күн бұрын
Nice video. I always wondered how they did there run around in Denmark
@killerbee631010 күн бұрын
Actually me too....
@jimg647611 күн бұрын
As a veteran railroader.. the moves were planned out well. Its always nice to have sluff tracks. Good explanation!
@killerbee631010 күн бұрын
Thanks !! As you know, in a lot of places you don't have the luxury of ample infrastructure.