Рет қаралды 5,431
1984 Boston Whaler Outrage 22 Project
Made this video with a 103 degree fever, so my narration at times seems a bit confused.
Electronics / Electrical
* 100% all new wiring (with the exception of the Yamaha rigging)
* New fuse panel, busses and circuit breaker
* New switches
* New under gunwale lighting
* New fore and aft spreader lights
* New electric horn mounted on T-Top
* New Garmin chartplotter / fish finder
* New dual USB outlet in console
* Moved batteries to console (remained within Yamaha’s spec for cable length extension)
* Battery switches in console are accessible via the slidings doors under the helm
Center Console
* All new console interior (custom shelf, drawer on slides, battery box) fabricated with marrante marine grade plywood and starboard.
* Slide out drawer is now on a stainless steel drawer slide. It is held closed by dual 10 lb latches.
* Custom starboard switch and gauge panel
* Fabricated new teak frames and sealed with Semco. I fastened the frames from the inside of the console so as not to have exposed fasteners.
* Original and varnished teak doors were stripped and sealed with Semco
* New aluminum door slides with felt runner liners
* Removable rubber matting was added to the floor of console
* New door latches make the doors easier to open and close, and hold tighter than the previous ones.
* Moved VHF and ignition, and added starboard trim plate to console face. Ignition is now better situated for attaching lanyard to captain (new law requires this).
* Removed audio system (head unit and speakers) in favor of a portable bluetooth device
* Turned bottom tilt-out bin unit into a tilt-out door. Inside the console I added a separator for this space. This will be used for house tools, spare parts and fuel additives.
* Rigging tunnel pass through fabricated with rubber sheeting
Mechanical
* New lower unit bearings and seals
* New water pumps
* Engine oil and lower unit oil change
* Intakes cleaned
* Injectors cleaned
* New spark plugs
* New oil filters
* New fuel water separators
Miscellaneous
* New T-Top canvas
* New fuel lines
* Swim platform (backordered)
* Gunwales had hardware and rub rail removed. Teak was cleaned and sealed with Semco
* New bilge pump in the bow compartment (drains into rope locker)
* Fuel filter and rigging tunnel fabricated with starboard
* Ring buoy and ring buoy mount
* Bottom Paint