Рет қаралды 497
LEARN BEFORE YOU SPEND
Thank You For Coming To Our Shop In Georgia From Alabama
36Ft. 2011 Forest River Georgetown
New 60 Mil. TPO Roof
1 Remove roof and ceiling assembly completely.
2 Frame new roof trusses from 2x wood stock 2ft. on center.
3 Add wood nailer strip on ceiling side of truss for intended bead board ceiling to be installed at another shop. Nailers will be 2ft. on center.
4 Secure 5mm luan sheathing to bottom side of truss for ceiling panel.
5 Insulate with "blown in" insulation.
6 Deck roof with 1/2 inch BC grade plywood.
7 Install roofing
8 Rebuild Dashboard
9 3 Solar Panels
10 Recaulked entire coach