Рет қаралды 394
1. Remove roofing material, AC, vents, skylight and antenna(s) and other components on roof top.
Note: crank up style antennas can NOT BE RE-INSTALLED
2. Remove decking.
3. Inspect underside of roof for structural damage, unprotected wires and breached ac ducts.
4. Advise of repairs that may effect work order price.
5. Adhere new decking and mechanically fasten said decking.
6. Adhere TPO roof membrane.
7. Adhere edge banding buffer strips to both right and left edges of coach. Add buffer strips to all roof deck joints that may compromise, if needed, or that may chafe the main roofing.
8. Adhere TPO membrane to roof deck.
9. Fabricate and install custom made curbs to roof for AC unit(s), vent(s) and heat weld to main roof membrane. Weld in custom boots for plumbing and radio antenna(s)
10. Re-install; existing AC [with new gasket(s)], roof vents, skylights, plumbing vents, radio antenna(s).
11. Clean, Paint and Re-install termination bars from front, sides and rear.
12. Caulk where necessary and appropriate to seal roof terminations, vents, skylights and plumbing.