That’s a very smooth transition out of the network into the cut in. Is that an automation event?
@cyledickens65 ай бұрын
Good question. What we do is take the net feed into Control A and overtake master control. The switchover is seamless. Then we have a severe weather show at the ready that leads off with the intro that we take when we’re ready.
@Robtvla4 ай бұрын
came here for same question; amazingly clean transition and love the 'Hello' themed bumper