Doubling itself is a bottleneck on this 60km stretch... Maybe let's wait for another 10years to see double lines between Bangalore hosur.. Hosur - omalur doubling is a dream😅😅😅 bangalore suburban rail maybe another 30 40 years... Dont know who are going to be lucky to be alive to witness 😅 Your efforts are top notch bro😊 but as a Bangalore person we are always let down in railways... It is the same situation as before... SWR rocks❤❤ slow trains, slow projects...😂😂 I see me in you bro, we all expecting something to be positive of our region's railway progress... But same old slow progress😢😢 railfans of this region are positive and will be positive till we die and see something till we alive😊
@RamachandranPalaniramu12 сағат бұрын
@@vijaycool7017 100% agreed on the fan boys mindset😁
@vijaycool701711 сағат бұрын
@RamachandranPalaniramu We all have these thoughts bro waiting for the betterment of our regions railway infrastructure☺️
@sureshv-lq1ti2 күн бұрын
Excellent explanation bro 👍 well-done 🎉🎉🎉 fan and support from tamilnadu ❤
@NatarajanC12119Күн бұрын
Thank you
@pajayrao65362 күн бұрын
Thank You for the video. Keep Updating Bengaluru Suburban Rail videos 😄
@NatarajanC12119Күн бұрын
Thank you
@fayazdm88572 күн бұрын
As per my prediction Maximum by June or July 2026 from Hosur to Belandur can expect to be commissioned. Belandur Baiyappanahalli line as you explained in the video due to Level crossing at Kaggadasapura and the demolition of building near baiyappanahalli where case is pending may stretch. Coz disputes related land or building doesn't settle soon it goes on for ages.
@prashanthb6521Күн бұрын
Thanks for all your updates.
@vedarajmysore821518 сағат бұрын
Very nice🎉
@msarvi2000Күн бұрын
Fantastic work as always, Natarajan. Your technical details are simply outstanding. Perhaps the ministry of railways or whoever's posted information about the progress of doubling on this route on X can wait for one of your videos to be released and then release theirs; quite honestly the timelines that they have given for completion of this project are very, very optimistic.
@NatarajanC12119Күн бұрын
Thank you
@Roshan_BhatКүн бұрын
Nice updates. Bigger the city, slower the Infrastructure expansion works.
@NatarajanC1211910 сағат бұрын
Unfortunately, this is true.
@madhavavb39732 күн бұрын
Thanks for the update!!
@BADBOY-ew2lv2 күн бұрын
Very Nice If Hosur Station us connected to Krishnagiri Bargur Natrampalli and jolarpet it would be very Grand
@NatarajanC12119Күн бұрын
Thank you
@viswanathswamy4637Күн бұрын
Outstanding
@NatarajanC12119Күн бұрын
Thank you
@gc95915Күн бұрын
In 1960s, IR built a 500km meter gauge line in 6 months from Rangiya to Murkongselek in Assam. In six months! In America, starting on May 1st, 1886, 18,500 km of 5’ gauge was converted to standard gauge in 48 hours.
@uday.shenoyКүн бұрын
In the 60' Pandit Jawaharlal Nehru was the PM. Once Sri Rahul Gandhi becomes PM we can expect such speedy work again.
@dhruvpathak18502 күн бұрын
Yes sir, actually the rail track clearing near Doddanekundi towards to Marathalli bridge side.. it is mix match of left-right. Not sure if a Marathalli-based railway station can be easily feasible. Would love to know your thoughts :)
@NatarajanC12119Күн бұрын
Suburban alignment is finalized here. So it will happen.
@dhruvpathak1850Күн бұрын
Understood, okay. Lets hope for the best🎉@@NatarajanC12119
@mohangohar73402 күн бұрын
Nice Udate !!! Please cover Penakonda Dharmavaram
@NatarajanC12119Күн бұрын
Thank you
@Muthukumar_Ramu2 күн бұрын
Superb video. ❤❤❤
@NatarajanC12119Күн бұрын
Thank you
@meiyappanmadhiyan47615 сағат бұрын
Bro what about NH 844 Neralur to Dharmapuri Project
@syamalaraotenneti90072 күн бұрын
Very interesting informative nice video thank you.
@NatarajanC12119Күн бұрын
Thank you
@Aurotzodeep2 күн бұрын
Very good presentation
@NatarajanC12119Күн бұрын
Thank you
@rvijayraghavan96452 күн бұрын
Wonderful Information
@NatarajanC12119Күн бұрын
Thank you
@r.a.j.a.n.r.g12122 күн бұрын
Few days back our lovely RF Ramachandran Palaniramu sir of Hosur made a review of pathetically progressing doubling project from Hosur to YPR . Exceedingly slow progress irks the daily users of train in this route. This is simply okay because of our democratic setup travelling on donkey while we are travelling in time travel horse. thanks
@NatarajanC12119Күн бұрын
Yes, brother covers this section regularly
@vishalvsvlogandgaming73432 күн бұрын
Great efforts
@NatarajanC12119Күн бұрын
Thank you
@svlogs97652 күн бұрын
Super ❤
@NatarajanC12119Күн бұрын
Thank you
@RamachandranPalaniramu2 күн бұрын
Long rails shipped between M.N.Halli & Anekal road on 24 Jan
@NatarajanC12119Күн бұрын
Good to know. Which locos used ? You can also notice Blue line OWG bridge work this week on the outer ring road.
@RamachandranPalaniramuКүн бұрын
@ sure brother. G4 came for dispatching rails. Kutti vid on the same is scheduled this evening 😊
@NatarajanC12119Күн бұрын
@@RamachandranPalaniramu Just Watched your upload :)
@RamachandranPalaniramu12 сағат бұрын
@ Thanks Brother. My updates are definitely not upto your standards. Learnt lot from you
@madhur373720 сағат бұрын
In Bangalore area, Railways doing slow works like Okalipuram underpass where BBMP works done, BBMP not interested in work relating ease traffic like Yelahanka Station RUB Underpass ,Jakkur Flyover ROB where railways finished there job etc...
@hoppes979Күн бұрын
Imagine time taken for Hosur to Omalur track doubling. It would take a decade to complete.
@NatarajanC12119Күн бұрын
Yes, I have very hopes on this project
@raghavendrams701815 сағат бұрын
Yes, this project takes place at very fast speed as it connects Hosure. But Tumkur-Chitradurga or Dharwad-Kittur-Belgaum or other projects within Karnataka takes back seat as Kannadigas are interested in it. Hosure project is of lest importantance to Kannadigas .
@NatarajanC1211910 сағат бұрын
This project is also slow like other projects in Karnataka. Land Acquisition is a major problem everywhere. This project will help people ( including our Kannadigas ) who are working near Electronic City as well.
@saiprasadhbalagopal56772 күн бұрын
Very nice video ! Anekal Road should be 34km from BYPL instead of 39km as shown in the video. BLRR-CRLM and AEK-HSRA is what we can look forward to completion. HLE-AEK and BYPL-BLRR might get completed in 2026 by the looks of it! 😢
@NatarajanC12119Күн бұрын
Thanks. You are right, will correct the error in the next video.
@sashanksriram292 күн бұрын
Im sorry to bother in this video, but is it possible if you can make an assessment on the ground, if there is any space on the ground in railway land whether the parijatha line of bsrp can be built, even if it is completely elevated on piers? Also love your videos!
@NatarajanC12119Күн бұрын
Will do
@sashanksriram29Күн бұрын
@ thank you sir
@sarveshjm1460Күн бұрын
What did you mean by Kalmeleram station not having any control signals or crossovers?
@NatarajanC1211910 сағат бұрын
Karmelaram will become a Halt Station. Only trains having stops will halt for its scheduled duration and depart. Like how Belandur Road station was during single line days
@sarveshjm14607 сағат бұрын
@@NatarajanC12119 thank you
@SSgobtcКүн бұрын
Is this high density track?
@NatarajanC12119Күн бұрын
60 Kg rails will be used
@hoppes979Күн бұрын
Sir , why Katra Srinagar inauguration is delayed even after CRS inspection is over a month ago?
@supreethhn4194Күн бұрын
Delhi elections. Modi will inaugurate after the delhi elections
@hoppes979Күн бұрын
@@supreethhn4194 thanks
@sangameswariyer77122 күн бұрын
Nice Music?,, From where?
@NatarajanC12119Күн бұрын
KZbin Studio
@soundar42704 сағат бұрын
Indian Railways work on their own. No politician from the era of Nehru, Indira Gandhi to current Modi can dictate terms with Indian Railways to work within Target date. Indian Railways some times listens & some times argues.
@npvidyadarapatelnpvidyaКүн бұрын
Sir hejjala to chamarajanagara new railway line project work sir???
@NatarajanC12119Күн бұрын
Only on paper. No progress has happened on the project
@madhusudanmssonu2155Күн бұрын
Heelalige to anekal route whether they are removing any village because this project OR any goods station project, please confirm if it is possible My entire village people looking for this information please confirm ASAP
@NatarajanC1211910 сағат бұрын
Without DPR ( Detailed Project Report ) The exact location cant be known. Will share as soon as DPR is ready
@madhusudanmssonu215510 сағат бұрын
Thank you so much sir, for your response, we look forward ASAP . Is there any specific government web site
@madhusudanmssonu21558 сағат бұрын
Even if 2 to 3 trackes comes also it's wouldn't effect my village, at present is there any proposal train goods project heelige to Anekal and marnayakanahalli, please confirm (maximum people in my village only having houses no other property ) -major worry of everyone
@varmaram4431Күн бұрын
If this section was under SR work would have been completed long back
@NatarajanC1211910 сағат бұрын
I doubt. SR took very long time for Madurai Kanyakumari Doubling
@sanathmayya36382 күн бұрын
Why are ballast not used in the new Line of Kashmir, concrete are used. Why can't the concrete structure be used to place the rail line in the rest of the country.
@NatarajanC12119Күн бұрын
It will require a video to explain Would suggest you to read this for now - www.quora.com/Why-do-Indian-Railway-tracks-have-ballast-while-metro-tracks-do-not
@madhur3737Күн бұрын
Its must be completed 2035...Railways is not eager to develop newlines, doubling etc due to high cost less returns... Interested only if it is profitable to Dept using less funds...Blr-Hassan line profitable by connecting Kerala state through coastal ...
@ahsreekrishnanayalur2797Күн бұрын
Be mentally prepared to make sure this project would be fully completed by 2040. I may sound rude but this is reality.
@ArmyKetchum2 күн бұрын
First.. 🎉
@fayazdm88572 күн бұрын
I was also told by locals just before kaggadasapura railway gate while entering from Baiyappanahalli there will be kaggdasapura station coming up. I could spot some station construction there. I don't know how true it is.
@NatarajanC12119Күн бұрын
I did not notice any work. They might be saying about suburban station which will come here