Bob's 25x55 HO layout details tour

  Рет қаралды 4,304

MRBenchwork

MRBenchwork

Күн бұрын

Пікірлер: 23
@tedzing8766
@tedzing8766 Жыл бұрын
Thanks for the update I really like those touch toggle switches.
@MRBenchwork
@MRBenchwork Жыл бұрын
Me too but TouchToggle also just released a physical push button switch for this system and I'm eager to try them as I like the tactile of physical buttons but the simplicity of the touch toggle control board installation. Either way the Tech Toggle system makes switch panels so much faster and easier to make that it's worth the couple extra bucks for the hours and sometimes days of labor it saves.
@SPSteve
@SPSteve Жыл бұрын
Impressive! And the shop still has room for the hot rods.
@MRBenchwork
@MRBenchwork Жыл бұрын
Mercedes, not hot rods I'm afraid.
@jenniferwhite6089
@jenniferwhite6089 Жыл бұрын
like the suitcase wire connection is out there with the new connection you have i can run my switch from my iPad or from my phone or have the dispatch room switch them for me they do have to when entering onto a mainline
@MojaveModelRailroad
@MojaveModelRailroad Жыл бұрын
Great work guys. That layout looks awesome.
@michaeldeckert6023
@michaeldeckert6023 Жыл бұрын
You do an incredible job. Thank you for sharing. I love the Southern Pacific, my dad was an executive officer in San Francisco. He ran the Communications Department for the whole railroad. Is that somewhat a copy of the Tehachapi loop?
@MRBenchwork
@MRBenchwork Жыл бұрын
Not really. The loop is just a fictional feature the layout owner requested when he had Byron design the layout.
@MRBenchwork
@MRBenchwork Жыл бұрын
Due to ongoing spam issues all comments are manually approved. Products in video and supply resources can be found here: (links below) www.amazon.com/shop/mrbenchwork Products in video (none of these are affiliate links) Atlas Flex track shop.atlasrr.com/c-495-h52.aspx Peco switches peco-uk.com/collections/3-5mm... NCE PH-PRO-R www.ncedcc.com NCE EB1 circuit breaker www.ncedcc.com/online-store/C... NCE AR10 (auto reverser) www.ncedcc.com/online-store/C... Touch Toggles www.berretthillshop.com Tortoise switch machines www.circuitron.com/index_files... SNAPS acculites.com/index.php?main_... Posi-taps www.posi-products.com/index.html (if you order these please tell them you heard about these from MRBenchwork in the order notes) Walthers 130’ turntables www.walthers.com/motorized-13... Affiliate links: gkeemars connectors amzn.to/3SDIG5W 14awg buss wires amzn.to/3MGGLKc 20awg Feeder wires amzn.to/40F5OTu
@thomasboese3793
@thomasboese3793 Жыл бұрын
Thanks for the links. This solves several problems I've been thinking about.
@MRBenchwork
@MRBenchwork Жыл бұрын
@@thomasboese3793 happy to help. If there's anything missing from the list let me know and I'll get you (or anyone else) the info needed.
@mpeterll
@mpeterll Жыл бұрын
I can't claim credit for the posi-tap connectors either. I was told about them by another professional builder; James Adams of "Affordable Model Railroads".
@MRBenchwork
@MRBenchwork Жыл бұрын
Good to know! In any event, I'm a huge fan of the connectors.
@tonyordaziii7250
@tonyordaziii7250 Жыл бұрын
I planning on building the Union Pacific Wyoming Division, Sidney Sub, Kearney Sub, Salt Lake Sub, Lakeside Sub, Nevada Sub, Roseville Sub in Ho Scale of a 75x57 basement would that fit.
@MRBenchwork
@MRBenchwork Жыл бұрын
Sounds like a fun project. If you want help, feel free to reach out.
@bobgolfs4432
@bobgolfs4432 Жыл бұрын
Do you have any extended videos of trains running on this layout?
@MRBenchwork
@MRBenchwork Жыл бұрын
Not yet. I should soon
@anthonyborden2513
@anthonyborden2513 Жыл бұрын
Great layout excellent just sent you guys a email thanks
@tonyordaziii7250
@tonyordaziii7250 Жыл бұрын
I planning on building a 75x65 basement of the Union Pacific Wyoming Division, Sidney Sub, Kearney Sub, Salt Lake Sub, Lakeside Sub, Nevada Sub, Roseville Sub in Ho Scale would that fit.
@MRBenchwork
@MRBenchwork Жыл бұрын
I honestly don't know that everything would fit but even if things are compressed and the unneeded sections omitted, I think it would be entirely possible to create a layout that stays true to the subdivisions look, feel and operations. I'd have to see the subdivision maps and know which timeframe you want to model to know for sure however as railroads in 1920 are very different from 2020 railroads.
@tonyordaziii7250
@tonyordaziii7250 Жыл бұрын
@@MRBenchwork I would say 1950's to present timeframe. What city and state are you located in!
@MRBenchwork
@MRBenchwork Жыл бұрын
@@tonyordaziii7250 A lot changes in 70 years but then again, some things don't. In situations like this I build with modern clearances but pretend the industries along the route never died. Anyway, I'm happy to discuss your potential project further but I'd ask that you email me. info@modelrailroadbenchwork.com with the following: - A drawing of the room with measurements in inches. I will need details such as door and window placement, any columns or immovable objects that need to be worked around as well as any walkways that must remain passable. - Do you have a track plan or would you need one? - Type of track to be used - Minimum track radius for main lines and sidings. - The type of running you intend to do - watch trains run, operable accessories, realistic running, switching or something in between. - Will this be single deck (flat) or will it have grades and or a second deck? - Timeline - when would you be ok with this being completed? - Projects of this complexity take time to do right and the materials take time to acquire in the quantities needed.
@tonyordaziii7250
@tonyordaziii7250 Жыл бұрын
@@MRBenchwork I also like to model the Moffatt Tunnel route, Soldier Summit route, Donner Pass route with D&RGW & Southern Pacific steam locomotives other than the Union Pacific divisions that I mentioned above.
reflecting on 13 years
13:01
MRBenchwork
Рет қаралды 2,3 М.
Jaidarman TOP / Жоғары лига-2023 / Жекпе-жек 1-ТУР / 1-топ
1:30:54
The Secrets of Walking Sticks and Hurdle Making - Jack Hargreaves
25:08
Dave Knowles - filmmaker
Рет қаралды 36 М.
Follow up O Scale Layout update May 2024 going over a couple questions
15:32
Marc's O Scale Trains
Рет қаралды 7 М.
Nolix Part 7  -  Building an HO model railroad IT"S DONE!!
19:51
MRBenchwork
Рет қаралды 4,6 М.
Installing Crossovers and Turnouts (342)
26:47
Model Railroading
Рет қаралды 19 М.
s2022e05 Model Train Layout Built for Operations & Realism. L-Girder benchwork for peninsula.
14:09
The HO Scale Union Pacific Railroad - Evanston Sub
Рет қаралды 12 М.
New O Scale Layout update May 21 2024. The start of a final journey.
12:38
Marc's O Scale Trains
Рет қаралды 8 М.
Laying Track, Don't Make These Mistakes (358)
18:06
Model Railroading
Рет қаралды 55 М.
How-to  Set Model railroad grades
10:00
MRBenchwork
Рет қаралды 24 М.
7 GREAT TIPS for RAILWAY MODELLERS at Chadwick Model Railway | 209.
30:47
Chadwick Model Railway
Рет қаралды 54 М.
Jaidarman TOP / Жоғары лига-2023 / Жекпе-жек 1-ТУР / 1-топ
1:30:54