Eglinton Crosstown First Vehicle Delivery

  Рет қаралды 91,828

CrosstownTO

CrosstownTO

3 жыл бұрын

On May 25, the first vehicle was delivered from the Eglinton Crosstown Maintenance and Storage Facility to the eastern surface portion of the new transit line. Watch for vehicles as testing will be taking place over the summer along the surface.
While these are exciting times, we remind all pedestrians, motorists and cyclists that these are still active construction sites and to continue to exercise caution around these areas.

Пікірлер: 211
@Zrinski11
@Zrinski11 3 жыл бұрын
Hats off to the truck driver. He backed up that trailer perfectly...
@namey9089
@namey9089 3 жыл бұрын
Guess what, my hat is still on
@Zrinski11
@Zrinski11 3 жыл бұрын
@@namey9089 ...Good for you...
@dwaynemclaren7160
@dwaynemclaren7160 3 жыл бұрын
cute you think he did it alone!
@Zrinski11
@Zrinski11 3 жыл бұрын
@@dwaynemclaren7160 ...Have you ever tried it??
@dwaynemclaren7160
@dwaynemclaren7160 3 жыл бұрын
@@Zrinski11 20 yrs of heavy haul! bigger the load the more help you get!
@canonto2008
@canonto2008 3 жыл бұрын
Beautiful! Thank you to everyone working on the project!
@imran.kiyani7926
@imran.kiyani7926 3 жыл бұрын
kzbin.info/www/bejne/r2WaiIWffLJoidk .
@GlenMacDonald
@GlenMacDonald 3 жыл бұрын
A fantastic milestone for the Eglinton LRT! Congratulations and thank-you to every single person who worked to get us to this point.
@profileprofile
@profileprofile 3 жыл бұрын
I brother is geomatics engineer . He surveyed the land for this he and his team saved this project the land was to soft but they fixed it
@canman5060
@canman5060 3 жыл бұрын
LRT in Toronto. Amazing. Remember the time when the subway can only go as far as Eglinton and you can drag your cow further north across the road with nobody honking !
@imran.kiyani7926
@imran.kiyani7926 3 жыл бұрын
kzbin.info/www/bejne/r2WaiIWffLJoidk .
@nanaokyere7141
@nanaokyere7141 3 жыл бұрын
Glad they're finally testing the trains. This means that they're 90% done.
@Nathan-ho7vr
@Nathan-ho7vr 3 жыл бұрын
Lol 🤣
@ryuali9466
@ryuali9466 3 жыл бұрын
This place has been under construction for 10 yearz
@nanaokyere7141
@nanaokyere7141 3 жыл бұрын
@@ryuali9466 Sadly I know. It's crazy how slow projects in Toronto take. If this were in Asia, this would be done in 6 years.
@OntarioTrafficMan
@OntarioTrafficMan 3 жыл бұрын
The east and west segments are nearly ready, but there's still a lot to do on yhe the segment around Yonge unfortunately
@AllRequired
@AllRequired 3 жыл бұрын
@@nanaokyere7141 You can probably thank the placard-waving stooges for that.
@cal920c
@cal920c 3 жыл бұрын
Shoutout to the local mechanic who saved the trip!
@botswanaemperor7139
@botswanaemperor7139 3 жыл бұрын
Looking good, really excited to see this line open!
@elibanaby3018
@elibanaby3018 3 жыл бұрын
Congratulations on your test run. By watching this video, I want to say that I'm super excited to see when this project is fully finish. Big shout outs the Metrolink and the team for doing a great job. Keep up the good work.
@Schony747
@Schony747 3 жыл бұрын
That's a very high tech way to offload a tram. In Melbourne, our Flexity is pulled off by a tractor!
@imran.kiyani7926
@imran.kiyani7926 3 жыл бұрын
kzbin.info/www/bejne/r2WaiIWffLJoidk
@peterj.teminski6899
@peterj.teminski6899 3 жыл бұрын
Congratulations to everyone on this project. Loookin goood.👍
@binhma8589
@binhma8589 3 жыл бұрын
Any one remember when this project started??? It take so long to get here. People's from the Eglinton and surounding are very happy to have the normal live back.
@DwainRichardson
@DwainRichardson 3 жыл бұрын
Great job, Crosstown Team! Looking forward to catching a glimpse of a test train when I’m next in T-dots-and I look forward to hopping aboard a Line 5 light rail vehicle when the line is finally in service. (-:
@shaneanthonyhutchinson1922
@shaneanthonyhutchinson1922 2 жыл бұрын
Can't wait for the expansion west to the airport ...with connection to mississauga and brampton....sweet.
@alexnosal2277
@alexnosal2277 3 жыл бұрын
Very cool looking.
@lvalledor3440
@lvalledor3440 2 жыл бұрын
These LRTs will make me remember the ex-TTC's GM Classics now that they have the #62** series unit numbers
@Guncannon
@Guncannon 3 жыл бұрын
Unbelievable! I never thought I can see this completion in my life time!
@profileprofile
@profileprofile 3 жыл бұрын
How old are u ?
@metropolitantransit7276
@metropolitantransit7276 3 жыл бұрын
Damn it! I missed filming the LRTs!
@metropolitantransit7276
@metropolitantransit7276 3 жыл бұрын
Duh, we're transit enthusiasts.
@thehamiltonfirefighter4746
@thehamiltonfirefighter4746 3 жыл бұрын
Cant wait to see it in toronto! Hamilton is getting LRT Soon!
@frankdenardo8684
@frankdenardo8684 3 жыл бұрын
I am going to see this on my next trip to Ontario.
@imran.kiyani7926
@imran.kiyani7926 3 жыл бұрын
kzbin.info/www/bejne/r2WaiIWffLJoidk .
@dariansamuels9357
@dariansamuels9357 2 жыл бұрын
Wow it is cool looking
@michaelbrown5782
@michaelbrown5782 4 ай бұрын
I live at Rosemount where are they drop the trains off on the tracks
@stanbimi
@stanbimi 3 жыл бұрын
How many years had the Eglinton construction been going on? Don't even fantasize about high speed train in Canada.
@frankdenardo8684
@frankdenardo8684 3 жыл бұрын
My next visit to Toronto. I got to ride this.
@susanficek1245
@susanficek1245 3 жыл бұрын
Great to see ! The more public transportation the better !
@richadanderson8428
@richadanderson8428 3 жыл бұрын
You like it 🙂
@dinaumali5632
@dinaumali5632 3 жыл бұрын
Salute to all the hard work !!!
@SweatySockGaming
@SweatySockGaming 3 жыл бұрын
This is rosemount drive NOT rosemount avenue
@zestcres
@zestcres 3 жыл бұрын
This is Beautiful...great to see our neighbors doing it big time....New York needs this ASAP...but too ignorant and cheap...smh!
@bmw803
@bmw803 3 жыл бұрын
We're too busy electing bar tenders to congress.
@djm5687
@djm5687 3 жыл бұрын
New York already has a robust subway system, so there is no need for streetcars. Busses are also cheaper, more versatile and use *existing roads* without the need for extensive "testing".
@MaggiePigg
@MaggiePigg 3 жыл бұрын
Almost there.
@siliconvalleygrandma787
@siliconvalleygrandma787 3 жыл бұрын
Nice 👍 Congratulations 🥳
@CanadianTransitFan
@CanadianTransitFan 3 жыл бұрын
This reminds me of when i saw semis carrying Ottawa's lrvs about a year ago in Havelock (just east of Peterborough)
@alfromwork
@alfromwork 3 жыл бұрын
Are there plans to fill the track bed with either gravel or grass? Many cities that have rapid transit routes on the surface don't leave it bare concrete, unless it's a bridge or something.
@Jesiaah
@Jesiaah 3 жыл бұрын
They not done yet bro🤣
@Humulator
@Humulator 2 жыл бұрын
theres grassy trams now :)
@bush33
@bush33 3 жыл бұрын
Why did the vehicle need to be delivered by truck instead of being driven right on to the line? Are the tracks not completed all the way to the Eglinton Maintenance Facility?
@Humulator
@Humulator 3 жыл бұрын
the tracks are done to fairbank, but it doesn't continue to somewhere where the laird portal is.
@Leo_Chan
@Leo_Chan 3 жыл бұрын
Cedarvale and Eglinton Stations are still just “holes in the ground”.
@Nathan-ho7vr
@Nathan-ho7vr 3 жыл бұрын
The maintenance facility is at Mount Dennis, the far end. And no the tracks, specifically the sub grade portion are not done.
@InvalidUserProfile
@InvalidUserProfile 3 жыл бұрын
The rolling stock had to be tested and then shipped from Kingston, the rolling stock was not built in Toronto so truck was the only way for them to get there.
@Humulator
@Humulator 3 жыл бұрын
@@Nathan-ho7vr its called the eglinton maintenance facility. thats why he said that.
@SimoesBela
@SimoesBela 3 жыл бұрын
Okay so when will this be ready? When the construction first began; signs ALL OVER Eglinton stated Sept 2021, but I read that they’ve constantly postponed the opening, and now it’s in 2022. Is this true?
@iriskalox4126
@iriskalox4126 3 жыл бұрын
So nice!
@mikedrown2721
@mikedrown2721 3 жыл бұрын
YEEESSS!!!
@willair6278
@willair6278 2 жыл бұрын
These vehicles are simply black Flexity streetcars. Line 5 should be the 505 streetcar, and the existing 505 Dundas streetcar should be renamed 513 or 514
@kelvinxu3058
@kelvinxu3058 3 жыл бұрын
New LRT finally arrived… bombardier always give us a surprise when it comes the way of daily commute.
@thomasrobinson6073
@thomasrobinson6073 3 жыл бұрын
Very cool ty
@artiesimek8327
@artiesimek8327 3 жыл бұрын
all projects are 90% done
@sakanatsuri
@sakanatsuri Жыл бұрын
Rail train cannot run steep slope near Don Valley.
@radicalkonrad765
@radicalkonrad765 3 жыл бұрын
It's about damn time
@HAA0603
@HAA0603 3 жыл бұрын
Looks nicer than the Ottawa LRT imo (although ours is more accessible lol).
@OntarioTrafficMan
@OntarioTrafficMan 3 жыл бұрын
How is yours more accessible? The Toronto LRVs are 100% low floor, with level boarding
@Salti26
@Salti26 3 жыл бұрын
More doors I think
@OntarioTrafficMan
@OntarioTrafficMan 3 жыл бұрын
@@Salti26 yeah the Ottawa cars do have better boarding efficiency
@trevorthefoamer220
@trevorthefoamer220 3 жыл бұрын
Imagine if the coupler just came off as they were loading it on the truck
@schnuurtchke
@schnuurtchke 3 жыл бұрын
Why do they TEST TEST TEST the surface section?
@Humulator
@Humulator 3 жыл бұрын
because its done?
@metropolitantransit7276
@metropolitantransit7276 3 жыл бұрын
To see if the vehicles are fit for service.
@kiroolioneaver8532
@kiroolioneaver8532 3 жыл бұрын
Ottawa was running empty LRTs for months before the line officially opened
@nanaokyere7141
@nanaokyere7141 3 жыл бұрын
To see if the tracks and trains align properly.
@j.m7555
@j.m7555 3 жыл бұрын
Loose nails, damaged steel, the weight of trains vs. the road, bad installations, and signage + visual issues between cars and pedestrians need to be tested. On top of that, the trains need to be pushed and TTC operators + dispatch have to be in sync before opening with a required amount of hours recommended by the manufacturer.
@sophxa6282
@sophxa6282 3 жыл бұрын
They similar to the E Class trams in Melbourne
@OliversElevators
@OliversElevators 3 жыл бұрын
I thought these were supposed to be 7-module trains? These are only 5 modules long.
@drfusioncraft
@drfusioncraft 3 жыл бұрын
They're going to couple them together making a 10 module long train
@erikarroyo9272
@erikarroyo9272 3 жыл бұрын
that driver pro af
@canman5060
@canman5060 3 жыл бұрын
Once upon a time you can open your doors wide while sleeping at night along Eglinton Avenue !
@worldtraveller2711
@worldtraveller2711 3 жыл бұрын
Nice trains but not colors, black and white very basic. TTC trams nicer
@djm5687
@djm5687 3 жыл бұрын
The vehicles are grey because they are owned by Mextrolinx, not the TTC. Also, Metrolinx wants them to resemble "LRT subways", rather than what they really are: streetcars.
@capuiakidyt7572
@capuiakidyt7572 3 жыл бұрын
It’s not really a streetcar, it’s entire lane is grade separate
@bashbrannigan
@bashbrannigan 3 жыл бұрын
Do we take it for granted this is Toronto?
@MikeVeracity
@MikeVeracity 3 жыл бұрын
duh
@bashbrannigan
@bashbrannigan 3 жыл бұрын
@@MikeVeracity And how would someone who doesn’t live in Toronto know where this is?
@davidarnold7282
@davidarnold7282 Жыл бұрын
Do you know another Eglinton Crosstown? I think I know this countries big (and smaller) cities well enough to know main or important streets. There are only a handful of citiesij Canada that have LRT’s.
@rayopeongo
@rayopeongo 3 жыл бұрын
Wait, what? I toured that facility a few years ago with my family, and also toured a couple of trains parked there. So, if these are the first vehicles delivered, what trains did we tour back then?
@drfusioncraft
@drfusioncraft 3 жыл бұрын
"the first vehicle was delivered from the Eglinton Crosstown Maintenance and Storage Facility to the eastern surface portion of the new transit line"
@rayopeongo
@rayopeongo 3 жыл бұрын
@@drfusioncraft Ok, thanks, got it. We toured the facility in the west end.
@MichaelStrathmore
@MichaelStrathmore 3 жыл бұрын
Look at how small they are. Guys, am I wrong or are these the a little too similar to the current rammed-to-capacity streetcars in the city. I know that have a some increased capacity, but is this really the vehicle that is going to provide the service needs this city needs in the future? As someone that crams themselves on the to St Clair streetcar daily, I'm concerned that the more densely populated Eglinton line will overwhelm these LRT's in its first year, nevermind decades into the future.
@nanaokyere7141
@nanaokyere7141 3 жыл бұрын
The trains will be coupled (2).. and if the demand is there, the platforms have been built for future extensions to make them into 3 coupled train sets.
@Humulator
@Humulator 3 жыл бұрын
bruh you can make up to 3 car trains in it its not going to use 1 cars.
@MichaelStrathmore
@MichaelStrathmore 3 жыл бұрын
@@nanaokyere7141 Yes, and unless I've also overlooked something that means there will be a capacity of less than 500 people per vehicle. Not gonna lie but that seems very, very low to me. I think also there is the comfort level that's being lost here. Obviously I haven't been on these new vehicles, but the current streetcar vehicles are the least comfortable vehicles in the TTC fleet, somehow taking a step backwards from the older fleet they replaced. Again, I'm hopeful they these LRT's don't follow that trend, but from the few interior shots I've seen it doesn't look promising.
@MichaelStrathmore
@MichaelStrathmore 3 жыл бұрын
@@Humulator If 500 people is the capacity for a car, or 15,000 people/hour is the cap, then that's not remotely future-proofed enough for the growth of this city.
@Humulator
@Humulator 3 жыл бұрын
@@MichaelStrathmore bro if they made this knowing that there wont be enough capticy they wouldnt have made it like this
@torontocollector1966
@torontocollector1966 3 жыл бұрын
How many delays did it take for the train to arrive? It should have been kept underground, instead of half/half.
@MJ_M
@MJ_M 3 жыл бұрын
do you mean kept above ground? most of the delays were caused by foolishly putting it underground
@torontocollector1966
@torontocollector1966 3 жыл бұрын
@@MJ_M if it had been entirely underground like line 4, Eglinton wudnt be a disaster
@CallMeDrewChristian
@CallMeDrewChristian 3 жыл бұрын
@@torontocollector1966 It would still be a mess if they did it underground, especially with the bridges on Leslie and east of Wynford.
@rdgk1se3019
@rdgk1se3019 3 жыл бұрын
There looks to be 4 articulation joints........but only 3 wheelset locations...........how exactly does this work?
@sjokomelk
@sjokomelk 3 жыл бұрын
Two of the 5 parts are suspended between the outer and middle parts
@djm5687
@djm5687 3 жыл бұрын
Why is it driving on the *left?* I thought vehicles (including streetcars) drove on the right in Canada....
@MHG1023
@MHG1023 3 жыл бұрын
I suspect as the line is not yet (officially) active the other track was probably not availlable for whatever reason. So, it´s no big deal running a single unit against the regular direction. In particular if track blocks and signals are not active yet. No danger for anyone ...
@KingTrump2024
@KingTrump2024 3 жыл бұрын
Ahh looks like more business to Bombardier for more failed street cars. Funny how Toronto is still waiting for full delivery !
@djm5687
@djm5687 3 жыл бұрын
Bombardier's streetcar division has been sold off. Hopefully, this will lead to fewer delays in the future.
@gumzy3000
@gumzy3000 3 жыл бұрын
Even after this is constructed and traffic can resume as normal on Eglinton, I am scared of all the condo development that is going to happen along the LRT line. It will be another decade until things feel a bit normal and not like your on a construction site surrounded by immense traffic all the time.
@duckanimations2973
@duckanimations2973 3 жыл бұрын
condos are good
@thetorontoyeller453
@thetorontoyeller453 3 жыл бұрын
Hopefully good old friends at Bombardier don’t fuck the cars this time. And why does it say TTC when it is owned by Metrolinx?
@schnuurtchke
@schnuurtchke 3 жыл бұрын
Did any vehicles get delivered this year
@cykz2004_dwimmy_the_oof
@cykz2004_dwimmy_the_oof 3 жыл бұрын
And people driving on the streets are probably excited too about the new line!
@jamesdmack
@jamesdmack 3 ай бұрын
Video gets recommended. Awesome! It must be getting ready to open! *posted 2 years ago* Son of a b...
@MrSquareart
@MrSquareart 3 жыл бұрын
Nice video!!!!!!!
@metta2432
@metta2432 3 жыл бұрын
Imagine how precise the truck driver has to be.
@oldskool1979
@oldskool1979 3 жыл бұрын
12 years of construction and all that tax money for something I will never use...
@Matt-lz6nx
@Matt-lz6nx 3 жыл бұрын
We’ve have these tram in Blackpool, England since 2012
@philonius21
@philonius21 3 жыл бұрын
Sure looks like an E-Class tram
@sjokomelk
@sjokomelk 3 жыл бұрын
Same model. Bombardier Flexity.
@omelian
@omelian 3 жыл бұрын
I wanted to see GO trains electric as well:(
@trainenthusiast7695
@trainenthusiast7695 3 жыл бұрын
What are those blue lights on top for?
@MikeVeracity
@MikeVeracity 3 жыл бұрын
snow clearance vehicle :-)
@DonutsIceCreamAndCottenCandy
@DonutsIceCreamAndCottenCandy 2 жыл бұрын
Oh I thought that it means it's an accessible vehicle.
@chuckwagon5518
@chuckwagon5518 3 жыл бұрын
Perhaps in the furure, for the benefit of all viewers, you could put where Eglinton is located in the description!
@bluebear6570
@bluebear6570 3 жыл бұрын
Unnerving music!
@sirindag2222
@sirindag2222 3 жыл бұрын
Че за трамвай. Че за город
@franki3Ru550
@franki3Ru550 3 жыл бұрын
Why is the top of the Lrt ugly?
@sovb
@sovb 3 жыл бұрын
Adding a roof is unneeded, because it's more expensive, makes maintenance harder, and the electronics are designed to be unharmed by water or dust. It looks the same on the streetcars. I think it looks cool personally, but not many people will get to see it anyway due to how high these vehicles are.
@SohaibKhan1
@SohaibKhan1 3 жыл бұрын
It took 10 years to build what could've ben built in 1 year in China
@jaimevalencia5548
@jaimevalencia5548 3 жыл бұрын
True but ... still worth living in Canada
@djm5687
@djm5687 3 жыл бұрын
China uses slave labor and isn't delayed by "environmental assessment" regulations.
@DP-gt7sr
@DP-gt7sr 3 жыл бұрын
@@djm5687 also work 22 hours a day rotating shifts.
@kelvinxu3058
@kelvinxu3058 3 жыл бұрын
@@jaimevalencia5548 Yes quality vs efficiency
@kelvinxu3058
@kelvinxu3058 3 жыл бұрын
@@djm5687 😂
@cykz2004_dwimmy_the_oof
@cykz2004_dwimmy_the_oof 3 жыл бұрын
But some may think it’s just a streetcar with no liveries...
@djm5687
@djm5687 3 жыл бұрын
It essentially is just a streetcar. The stations are not as close as a typical streetcar line, many stations are underground, and most of the route is on a dedicated right of way. Other than that, "Line 5" is essentially just another streetcar line.
@marcdich9066
@marcdich9066 3 жыл бұрын
the phat train looks like its smiling with its cute red lights haha ,good for yall
@judyArsh
@judyArsh Жыл бұрын
And one year later your lack of attention to detail is already showing and no sign of an opening. Tracks are wrong. Platforms are wrong. It’s embarrassing. A complete ripoff of the public purse.
@1carlportl
@1carlportl 3 жыл бұрын
How Much $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ really $
@imablazeuonfiya
@imablazeuonfiya 2 жыл бұрын
I seriously hope these trains don't drive this slow otherwise it's a rip off. subways are better.
@cykz2004_dwimmy_the_oof
@cykz2004_dwimmy_the_oof 3 жыл бұрын
Guess I can ride the new train to school!
@kelanzhi7269
@kelanzhi7269 3 жыл бұрын
i hate streetcar, low efficiency while heavey investment, and sometimes make traffic even worse
@natesum5012
@natesum5012 3 жыл бұрын
Ugh Bombardier made the trains! Keep the receipts!!
@JustACowSP
@JustACowSP 3 жыл бұрын
yoooooo its happening
@hippocreation
@hippocreation 3 жыл бұрын
As long as it crawls on the ground, sharing traffic, it is NOT LRT! It’s a tram. See what real LRT is, go German or China.
@EnjoyFirefighting
@EnjoyFirefighting 3 жыл бұрын
which LRT in Germany do you think of? And actually it looks like the track is seperated from the road and not actually sharing the path
@hippocreation
@hippocreation 3 жыл бұрын
@@EnjoyFirefighting Wuppertal, Germany Schwebebahn
@EnjoyFirefighting
@EnjoyFirefighting 3 жыл бұрын
@@hippocreation well that one isn't concicered as light rail but as suspension railway. While there's quite a smooth smooth transition between trams and light rail in some areas, some are indeed concidered as light rail, like the one in Stuttgart, Hannover, Essen, Frankfurt am Main, Karlsruhe, Thuringian Forest Rail ... some of these are connected to tram networks, some are in place instead of tram networks, some of them exist parallel to tram networks ... however these aren't concidered as trams although they are on the same level like road traffic.
@thetorontoyeller453
@thetorontoyeller453 3 жыл бұрын
Took them long enough , all the ducking around they did. They could have built a subway in less time
@comics_reisebusfahrerleon
@comics_reisebusfahrerleon 3 жыл бұрын
👍🏻
@wolf3755
@wolf3755 3 жыл бұрын
Made by Canadians and used by others
@BarryObamaJunior
@BarryObamaJunior 3 жыл бұрын
Eglinton has been hell for years because of this thing which is late and over budget thanks for nothing
@BeeRich33
@BeeRich33 3 жыл бұрын
By the hour, boys. Everybody a supervisor. Union knobs hang out at The Keating Channel Pub. Screwing the people over for what...7 decades now? Hold on a second..."scaffordling has been set-up to allow for vehicle maintenance". So al that construction and there's not a garage for these trains?
@trainrover
@trainrover 3 жыл бұрын
all that $$$ for just short trams...oo la.....
@markleggett9714
@markleggett9714 3 жыл бұрын
Streetcars are the worst kind of public transport.
@capuiakidyt7572
@capuiakidyt7572 3 жыл бұрын
Not necessarily, in San Franscio, they made streetcars a necessity to mass transit
@EnjoyFirefighting
@EnjoyFirefighting 3 жыл бұрын
uhm not really, why should they? Cheaper than a subway, bure higher capacity than a bus. The shortest types of articulated trams are approx as long as the longest of buses
@christopher8116
@christopher8116 3 жыл бұрын
LRT Trains, the way of Communism.
Fall 2020 Progress Update: Mount Dennis Station - Kennedy Station
16:01
Eglinton Crosstown LRT - opening ... soon?
6:03
notsmoothsteve
Рет қаралды 45 М.
Running With Bigger And Bigger Feastables
00:17
MrBeast
Рет қаралды 63 МЛН
Look at two different videos 😁 @karina-kola
00:11
Andrey Grechka
Рет қаралды 12 МЛН
World’s Largest Jello Pool
01:00
Mark Rober
Рет қаралды 128 МЛН
The Problem With These Headlights
17:55
The Engineers Post
Рет қаралды 1 МЛН
Vehicle Ride: Laird Station to EMSF
5:35
CrosstownTO
Рет қаралды 32 М.
Calgary Transit - New CTrain design options
3:43
CalgaryTransitcom
Рет қаралды 77 М.
TT B-Roll - Light Rail Compilation
9:32
transittoronto
Рет қаралды 5 М.
The Missing Piece in Toronto's Regional Rail System
15:34
RMTransit
Рет қаралды 112 М.
Customer States Their Car Just Stopped While Driving
12:02
Mechanical Nightmare
Рет қаралды 1,5 М.
Why Moscow Is Insanely Well Designed
9:44
Versed
Рет қаралды 1,5 МЛН
Light Rail Vehicle Testing: Sunnybrook Park Stop
0:42
CrosstownTO
Рет қаралды 7 М.
самый умный
0:17
RusCaR
Рет қаралды 834 М.
throw a nut into a turbine - what happens #shorts
0:19
opelservice kyiv
Рет қаралды 2,9 МЛН
самый умный
0:17
RusCaR
Рет қаралды 834 М.
POV: решил купить машину в 2024 году
0:11
AUTOSAMKA | Купить авто под ключ из Грузии
Рет қаралды 2,4 МЛН