almost done this is also how the airport itself was built but back then they did dredge, fill, cap, and pile drive. Today they can skip dredging since the soil is contaminated silt from construction of the airport itself all they have to do is place a mat on top of the silt cover it with sand and then drill the pilings. It should be done by July 2020. While this is going on construction of Terminal 2 and Concourse 4 are complete all they have to do is connect them to the system and the new runways.
@JensenRaphael7 жыл бұрын
Good
@reanult4575 жыл бұрын
On schedule and within budget, you must be kidding.