Рет қаралды 8,329
This tutorial video will guide the viewer on how to design a combined footing that supports tied columns. It starts from calculating preliminary size in order to achieve soil pressure, then followed by analyzing critical shear and bending moment.
Finally, once critical stresses Vmax and Mmax are calculated, next step are sizing of footing thickness plus the required rebars along main axis.
Have fun watching and learn!