No video

Does Your Project Schedule Have Too Much Detail?

  Рет қаралды 9,814

Plan Academy Inc.

Plan Academy Inc.

Күн бұрын

Пікірлер: 18
@bobnimorwicz48
@bobnimorwicz48 4 жыл бұрын
Great tips Michael and Dr. Saleh Mubarak!! It's about the ability to manage.
@engrkamranullahkhan1083
@engrkamranullahkhan1083 6 жыл бұрын
very informative videos , thanks to Plan academy team, specially to sir saleh mubarak . wainting for more videos like this
@mustafaali-dz1yx
@mustafaali-dz1yx 4 жыл бұрын
XXXXXXXXXXXXXXXXXXXXXXXXx One Tip to add to your amazing presentation which is using an excel spreadsheet to backup the level of detail if required which is what the construction team really bother about which can update the planning team. as an Example when i do a schedule for electrical cable pulling, glanding and termination i do a No. of cables from point A to point B but i face a lot of trouble updating it, and the construction team disagree as the need further details which is cable size and tag No. so i backup their work with an excel sheet, which they would fill that daily, weekly and i got what i need from there. Thanks Dr.Saleh
@akporta
@akporta 3 жыл бұрын
In P6 one could use steps to track individual items (such as each column in a floor) within and activity, which would still be detailed to MAINTAIN, but would reduce the number of activities displayed/printed.
@HaythamSAtia
@HaythamSAtia 5 жыл бұрын
Thank you! very good tips.
@UjangSonjaya
@UjangSonjaya 4 жыл бұрын
amazing for your sharing, very useful for me, Syukron, Masya Allah, Tabarakallh
@PlanAcademy
@PlanAcademy 4 жыл бұрын
Glad to hear that
@nohandlebarmtb
@nohandlebarmtb Жыл бұрын
My project has 40k activities, 100k relationships and 1 MM work hours, I wonder if I will be able to manage that alone in the field.
@AhmedAli-dj9jo
@AhmedAli-dj9jo 6 жыл бұрын
Thank you so much
@PlanAcademy
@PlanAcademy 6 жыл бұрын
You're very welcome!
@quevengalang4874
@quevengalang4874 5 жыл бұрын
Very helpful
@roadrunnerpro_d
@roadrunnerpro_d 4 жыл бұрын
Very good video
@PlanAcademy
@PlanAcademy 4 жыл бұрын
enjoy!
@ramie9855
@ramie9855 6 жыл бұрын
Thanks, it was really awesome! What about decomposing activity based on its duration? for example no activity's duration should be more than two or three weeks, if we have weekly progress meeting. In other word activities are decomposed to the level allow for better control?
@PlanAcademy
@PlanAcademy 6 жыл бұрын
Saleh and I advocate not for breaking down an activity based on duration, but rather based on your confidence to manage the activity. If the activity is large, how confident are you that it's accurate? That if you have to stop the work, there isn't a component bundled-in that could be broken out for work to continue on. etc.
@akporta
@akporta 3 жыл бұрын
@@PlanAcademy That's ideal in theory, reaching a manageable level of detail is important. However, there are client agencies (particularly in government) that will specify an activity must not have more than a certain duration (typically equal to one reporting period). In those cases one has no choice but to break activities to comply with the spec, which unfortunately could end up creating a very detailed schedule and nothing can be done about it.
@heshamabdelhak8289
@heshamabdelhak8289 5 жыл бұрын
I have a project 500 residential villa , I will devide it to 10 zones. How can I deal with each 50 villa for activities ? For example for 1st floor r c slab I suggest to be activities (1 st floor r c slab for 1 to 50 villa ) Am I all right? Or there is another way ?
@PlanAcademy
@PlanAcademy 5 жыл бұрын
There is no right or wrong way - you have to decide how much detail you are willing to track AND how you group activities to track them.
How To Do Takt Planning
18:47
Jason Schroeder
Рет қаралды 7 М.
Construction Scheduling Training: An Introduction
18:05
Plan Academy Inc.
Рет қаралды 59 М.
طردت النملة من المنزل😡 ماذا فعل؟🥲
00:25
Cool Tool SHORTS Arabic
Рет қаралды 5 МЛН
Дай лучше сестре 🤗 #aminkavitaminka #aminokka #сестра
00:15
Аминка Витаминка
Рет қаралды 646 М.
Full P6 Tutorial: Cost Loading with Expenses
19:37
PJM Scheduling Services
Рет қаралды 4,5 М.
Why Half-Step Progressing is so Important!
6:54
Plan Academy Inc.
Рет қаралды 3,1 М.
How to perform Resource Loading in Primavera
10:57
Nine to Five Engineers
Рет қаралды 3,4 М.
Project Scheduling
13:08
Dartmouth Engineering
Рет қаралды 249 М.
How to Get HIRED in Project Controls - ADVICE from a Recruiter
8:48
Plan Academy Inc.
Рет қаралды 1,7 М.
Test for THIS - When Hiring P6 Schedulers
6:30
Plan Academy Inc.
Рет қаралды 2,3 М.
[Updated] Scrum Framework - How Scrum Works in Construction
5:24
Felipe Engineer
Рет қаралды 4,1 М.
Are YOU Using this Primavera P6 Float Paths Feature?
10:06
Plan Academy Inc.
Рет қаралды 15 М.
How To Make A Construction Project Schedule
11:32
Jason Schroeder
Рет қаралды 10 М.
طردت النملة من المنزل😡 ماذا فعل؟🥲
00:25
Cool Tool SHORTS Arabic
Рет қаралды 5 МЛН