Full P6 Tutorial: Cost Loading with Expenses

  Рет қаралды 5,048

PJM Scheduling Services

PJM Scheduling Services

Күн бұрын

Пікірлер: 16
@PJMScheduling
@PJMScheduling 2 жыл бұрын
Adding an Expense to an Activity: 2:11 Exporting Expense from P6 to Excel: 3:09 Preparing Excel File for Import to P6: 3:53 Importing Expenses from Excel to P6: 7:13 Create Cost Accounts: 8:13 Assigning Cost Accounts: 9:44 Adding Costs to Activities: 12:10 Cost Distribution Curve: 13:52 Applying Actuals: 16:09
@olse89
@olse89 Күн бұрын
this is useful for most of lumpsump construction project, another way cost loading without single resource load
@Hagosea75
@Hagosea75 5 ай бұрын
That’s the best tutorial video ever. Thanks.
@henryoris2601
@henryoris2601 2 жыл бұрын
You are such a knowledgeable person that knows how to solve the most challenging problem in a simple format, thanks so much for making my life easy haha, Could you please do another video of cost loading using resources instead of expenses, using EVM to generate CPI and SPI please including all the necessary colum and progress the activity Thanks.
@PJMScheduling
@PJMScheduling 2 жыл бұрын
That's a great idea for another video. I'd be happy to and will post it when I have a chance to run through it. I have made another video about cost loading using resources which is linked below: kzbin.info/www/bejne/fGrVi4Buh8eikJo
@RizwanAhmed-w8p
@RizwanAhmed-w8p Жыл бұрын
Excellent Stuff!
@ehsanvafamanesh5019
@ehsanvafamanesh5019 2 жыл бұрын
Thank you so much man . Great Job .
@phemmy2008
@phemmy2008 2 жыл бұрын
Great lecture. Keep it up
@yvettemag-bake8303
@yvettemag-bake8303 2 жыл бұрын
Thank you so much
@Planner007
@Planner007 Жыл бұрын
Hey Mate, thanks for the Video. just wondering if you have come across a way to import the expense distribution spread for a task (ie values for each Day/Week/Month) from excel. (Bucket planning using excel? The available Curve is not suitable for Cashflow (Topdown distribution). Note : There are fields in the P6 Database table for importing the value to specific time period. since I lack the programming skills, just asking around:)
@PJMScheduling
@PJMScheduling Жыл бұрын
I don't think there is a way to import the cost into a specific period. It's an interesting question. I'm curious as to why you want to have the cost projection different from when the activity is occurring. But, the resource assignment has its own unique dates that are separate from the activity, so you could probably change the dates of the resource assignment to match when you want that activity to spend. Also, you can change the "Curve" on the resource assignment so it distributes the money differently depending on the curve you choose.
@Planner007
@Planner007 Жыл бұрын
What I meant is 'resource assignment spread for long duration tasks. They are driven from early dates of the task and spread is either Uniform spread or from resource Curve (front loaded, back loaded etc. In addition, by doing the Bucket planning in P6 you can alter the spread manually for a Month/Week/day in the resource assignment window. Instead of manually editing the resource spread, I want to use the excel and load the spread to P6. The use case for this feature is to produce a Leveled Resource profile or for Cash flow/budget projection in P6. Using API's this can be achieved. I found that In the Latest p6 V21, Oracle has introduced new field to upload this particular feature. " LoadWithLiveSpreadActivityOrAssignment" search the manual for more info... I have found one tool so far that has this particular capability, Leagare , please watch this video which i came across. kzbin.info/www/bejne/d3PTe2OLatunl68 - Asked for a Demo and pricing , if it's affordable for me I will be able to check it out. Otherwise, i need to Learn Java and API configuration to figure this out (too easy:
@PJMScheduling
@PJMScheduling Жыл бұрын
@@Planner007 Ahh, I see. I do not know of a way to accomplish that in P6. Other than creating separate activities based on the period you want to bill. I'll think more on it and let you know if anything comes to mind.
@ColbeyStrange
@ColbeyStrange Жыл бұрын
Struggling here. Why would I not have a Project to select to import back into after manipulating my Expenses Excel? Mind you I do not have Admin rights to a shared system and I'm trying to incorporate Expenses rather than Resources to a cost loaded schedule. I also can't search for the project or add it. Am I just locked out, curtesy of my IT department?
@PJMScheduling
@PJMScheduling Жыл бұрын
Correct, unfortunately. I've run into that myself in the past and it's because you don't have admin privileges or you at least restricted in some capacity where you can't do imports.
@ColbeyStrange
@ColbeyStrange Жыл бұрын
@@PJMScheduling Awesome. Love having my hands tied and doing more with less.😠 Thanks for the quick reply
Importing Actual Expenses from Excel to P6
9:36
PJM Scheduling Services
Рет қаралды 1,4 М.
Creating an S-Curve from Primavera P6
14:37
PJM Scheduling Services
Рет қаралды 12 М.
I tricked MrBeast into giving me his channel
00:58
Jesser
Рет қаралды 21 МЛН
How to whistle ?? 😱😱
00:31
Tibo InShape
Рет қаралды 20 МЛН
Manpower Resource Loading including S-curve in Primavera P6
13:30
How to Cost Load a Schedule in Primavera P6
9:57
PJM Scheduling Services
Рет қаралды 21 М.
How to Update a Cost Loaded Schedule in Primavera P6 - The Right Way
10:03
PJM Scheduling Services
Рет қаралды 5 М.
Method to Eliminate Out of Sequence Activities
17:04
Project Management & Control - by ASIF (Asif)
Рет қаралды 3,6 М.
Resource Loading in Primavera P6 - 5 Tips to make it EASIER
8:11
Plan Academy Inc.
Рет қаралды 31 М.
import progress updates with actual dates to primavera p6
10:32
Planning Engineer FZE.
Рет қаралды 26 М.
How to Update Shop Drawings and Materials in your schedule
9:40
Planning Engineer FZE.
Рет қаралды 3,9 М.
Import Costs from Excel to Primavera P6
11:26
PJM Scheduling Services
Рет қаралды 2,6 М.
Are YOU Using this Primavera P6 Float Paths Feature?
10:06
Plan Academy Inc.
Рет қаралды 17 М.
I tricked MrBeast into giving me his channel
00:58
Jesser
Рет қаралды 21 МЛН