East Link Light Rail I-90 Track Bridge System Animation

  Рет қаралды 37,151

WSP in the U.S.

WSP in the U.S.

10 жыл бұрын

As part of the East Link project to extend light rail from Seattle to Redmond, Washington, Sound Transit, the public transportation agency for the Puget Sound region, selected the team of Parsons Brinckerhoff and Balfour Beatty to design, develop, fabricate, and test a track system capable of taking light rail over Lake Washington via the Homer M. Hadley Memorial Bridge -- the fifth-largest floating bridge in the world.
Operating light rail on a floating bridge is no mean feat -- there is currently no precedent. The floating span of the Hadley bridge is in constant motion due to changes in water level, wind speed, and temperature, and the degree of these changes varies with the season and with the vehicle load.
To accommodate the wide range and magnitude of movements to which the Hadley is subjected, the Parsons Brinckerhoff/Balfour Beatty team has conceived, developed, analyzed, evaluated, and tested the Curved Element Supported Rail (CESuRa) track bridge system. This 3D animation, prepared by Parsons Brinckerhoff's visualization team, presents the CESuRa concept, demonstrates its performance in simulated conditions, and illustrates how the track bridge system is incorporated into the larger East Link project.
To learn more about this project and the CESuRa track bridge system, read the feature story here: bit.ly/2q6Oho4

Пікірлер: 7
@hobog
@hobog 7 жыл бұрын
This is simply amazing, repurposing existing infrastructure, and advancing rail tech by laying track along a floating bridge! :D
@007Environment
@007Environment 10 жыл бұрын
The railway is going to be built in the center?
@angelinavielle2935
@angelinavielle2935 4 жыл бұрын
I am too
@deanseawa
@deanseawa 7 жыл бұрын
Is there any sound?
@missamo80
@missamo80 7 жыл бұрын
Heads up that none of the links to the technical article work. They all just go to WSP main page.
@WSPUSA
@WSPUSA 7 жыл бұрын
Thank you, Neil. We have updated the description to include the April 2014 Insights article (which replaced PB Bulletin). We appreciate your interest.
@missamo80
@missamo80 7 жыл бұрын
Thanks. The link to the "greater detail" in the tech talk column mentioned in that story is also broken (insights.wsp-pb.com/articles/transportation-infrastructure/sound-design-track-bridge-system-enables-light-rail-on-floating-bridge).
How to: Running trains across a floating bridge
4:29
Sound Transit
Рет қаралды 40 М.
Seattle is Building a $54BN New Railway
8:47
The B1M
Рет қаралды 1,1 МЛН
孩子多的烦恼?#火影忍者 #家庭 #佐助
00:31
火影忍者一家
Рет қаралды 48 МЛН
Looks realistic #tiktok
00:22
Анастасия Тарасова
Рет қаралды 81 МЛН
DO YOU HAVE FRIENDS LIKE THIS?
00:17
dednahype
Рет қаралды 85 МЛН
Sound Transit - East Link Extension alignment animation
12:32
Sound Transit
Рет қаралды 70 М.
Federal Way Link light rail route flyover
6:26
Sound Transit
Рет қаралды 42 М.
Sound Transit - Lynnwood Link Extension final alignment animation
6:19
Overview of future East Link light rail route and stations
5:17
Sound Transit
Рет қаралды 26 М.
Why Are Rails Shaped Like That?
14:53
Practical Engineering
Рет қаралды 2,5 МЛН
How the Titanic Was Found
22:19
neo
Рет қаралды 975 М.
The Future of Rapid Transit in Seattle
15:37
RMTransit
Рет қаралды 46 М.
Riding the Japan's Underwater Bullet Train from Hokkaido to Morioka
10:42
孩子多的烦恼?#火影忍者 #家庭 #佐助
00:31
火影忍者一家
Рет қаралды 48 МЛН