The hose lay doesn't look like a minute man hose lay. I like the hose lay in this video. Is there a name for it? Thanks.
@FirefighterAmbitions3 жыл бұрын
We’ve called it a 2/4 or 3/5 double loop for so long, I don’t remember the technical term for it. It is easy to load and easier to deploy for sure. When loaded correctly, the line comes off the truck perfectly 💪🏼
@mrjohnson85674 жыл бұрын
First rule never run on a fire ground train as if your life depends on it
@shauncaul56863 жыл бұрын
Just proves even further that every Dept is different, my Dept would never jump off rig without SCBA ON at a structure response. What's with the clamp on supply line if I'm first in on a forward lay?. But I did like the crosslay deployment, not beating up this video because every department is different just giving my point of view and also agree no running on the fireground 😁