Thanks. What are the reasons for so wide gap between the two part of the building. So far I have watch numerous videos where the gap is usually 25 or 50. I have a project where there is a lateral G+1 extension to an existing G+1 small-scale residential building and I want to have an expansion joint all round the outer edges of the two buildings, starting from foundation to top of slab. The issue is to find a way to prevent air, water ingress and vermin from entering the building through suitable filler materials. Again thank you very much and hope the best for your youtube channel.
@kalpeshsatpute2373 Жыл бұрын
Helpful Video with all the minor details. Excellent Work.
@CivilAddaa Жыл бұрын
Thanx alot
@bithika227506 ай бұрын
Where are the aluminum section and roller bar available?
@taribilong Жыл бұрын
Very knowledgeable
@CivilAddaa Жыл бұрын
Thank you 😊
@prakyathm9981 Жыл бұрын
Excellent
@kimcarreon5905Ай бұрын
how many linear meters can be installed in an hour?
@CivilAddaaАй бұрын
This Expansion joint system can't be installed in an hour. There are 4 to 5 steps to complete the whole expansion joint system which take approx 3 days to install the complete system.
@babuasatishkushwaha4212 жыл бұрын
Good
@shivamRudram11 ай бұрын
@pprox Cost per metre ?
@CivilAddaa11 ай бұрын
Depends on the Expansion joint Gap Size...50mm/100mm/150mm/200mm....etc
@ErRahilnazir9 ай бұрын
I have urgent need of these workers or like these. Can you provide me no of these skillfull workers