This was the record of the renovation progress. The whole project was completed within 2 months. My Interior designer tried to fulfil my requested requirements and scheduled. There was one day he put up 4 workers to do work together.
My renovation work :
1) Living room and bedroom
flooring
2) bedroom built-in wardrobe
3) Built-in display cabinet and TV console at living room
4) living room and bedroom cornice
5) wiring and reposition sockets points
6) remove the existing bedroom sliding door and partial partition
7) installation of new bedroom doors
8) Toilet: overlay ceramic board on existing wall tiles
9) remove existing toilet bowl and basin
10) installation of new toilet bowl, basin with cabinet, mirror cabinet, water heater.
11) installation of ceiling lights for hallway, living room, bomb shelter, toilet and kitchen.
12) installation of 2 ceiling fans
13) installation of led strip lights for display cabinet, below TV console, toilet and kitchen.
14) installation of Upper and lower cabinets for kitchen
15) installation of kitchen glass by folding doors
16) remove existing toilet door and installed new by fold glass doors.
17) painting works.
**The above works were done by the interior design company. **
*Below works were from other contractors*
18) installation of window netting
19) remove existing manual hanger rack and installed new electric hanger rack.
20) toilet ~ remove the mesh and replace acrylic pieces at the pipes boxes.
21) bomb Shelter storage rack.
22) installation of air-conditioning at living room and bedroom.