Рет қаралды 1,268
We are revisiting the staging deck to add some potentially critical turnouts, before it's all covered with another deck above it, and made inaccessible for modification.
This modification paves the path towards potentially adding a shelf on the long wall, and doubling our staging capacity. Future proofing...eh, eh?
As always, thanks for watching!