No video

How Honeywell Achieved 7X Faster Lead Times for a Critical Component

  Рет қаралды 1,583

Fictiv

Fictiv

Күн бұрын

Read the full story here...
www.fictiv.com...
About the team
Industry: Aerospace
Product: RE100 Auxiliary Power Unit
Location: Phoenix, AZ
Why Fictiv
Customer challenges: Need to reduce lead time for product innovations in order to meet customer expectations
Capabilities Leveraged: High precision CNC machining, fast DFM feedback, and optimization
Result: Reduction in lead time from 22 to just 3 weeks and delivery of part creating significant customer benefits in record time
Accelerating Part Development and Production
Across more than a century of innovation, Honeywell has established itself as a leader in industrial technology development. From energy-efficient buildings to aircraft, to protective equipment, to high-performance materials, Honeywell sets the standard for high-quality products built for the future.
The Chinook T55 Engine, with improved fuel efficiency, reliability, and affordability, is just one recent example of Honeywell’s innovation. Source: Honeywell
To continue their legacy as a leader in industrial innovation, and deliver better products, faster, for their customers, Honeywell is investing in digital transformation across every facet of its global organization- both internally and through strategic partnerships.
Jon Hobgood, Vice President, Advanced Manufacturing and Automation, leads this transformation effort for Honeywell Aerospace to increase the organization’s performance and customer satisfaction through new technologies.
“Automation and digitization are the keys for competitiveness in the future,” said Hobgood. “There’s no doubt that our customers have this mindset of expecting our products much more rapidly, and as a business, we want to meet those needs in the market.”
“Our customers have this mindset of expecting our products much more rapidly, and as a business, we want to meet those needs in the market.”
- Jon Hobgood, Vice President, Advanced Manufacturing and Automation at Honeywell
The Challenge: Navigating a Complex, Global Supply Chain
Given the scale of their product portfolio, expansive supply chain, and global customer base, manufacturing lead times can be a barrier that prevents Honeywell engineers from delivering new innovations at the pace customers demand.
“Some of the challenges we face are around the length of our supply chain,” said Hobgood. “In some cases, it could take six months to two years to source parts. Moving faster, to get our customers parts faster is a big deal for our business today.”
Partnering with Fictiv to Help Accelerate Development
The partnership between Honeywell and Fictiv helps solve this very challenge. The manufacturing engineering team at Honeywell Aerospace taps into Fictiv’s Digital Manufacturing Ecosystem for quotes in minutes instead of days and parts in weeks instead of months, with the goal of reducing cycle times by 50%.
“It’s very exciting when we can find a partner like Fictiv,” said Hobgood. “They do an incredible job connecting my needs as a customer to those suppliers that have the capability, the right competitive cost, and the capacity to build my product and get it to me in a very rapid cycle time.”
“They do an incredible job connecting my needs as a customer to those suppliers that have the capability, the right competitive cost, and the capacity to build my product and get it to me in a very rapid cycle time.”
- Jon Hobgood, Vice President, Advanced Manufacturing and Automation at Honeywell
Achieving 7x Faster Lead Times for the RE100 APU
In a recent program, the manufacturing engineering team at Honeywell Aerospace was able to achieve 7x faster lead times for a critical component in the RE100 Auxiliary Power Unit (APU) with Fictiv.
Honeywell’s RE100 Auxiliary Power Unit delivers world-class flexibility and reliability for small to mid-size aircraft. Credit: Honeywell
Traditionally, a revision to this component in the APU would require a complete re-cast of the part with a 22-week production lead time.
Instead, Honeywell used Fictiv Enterprise to rapidly CNC machine the component in just 3 weeks, following 3 steps:
Optimize for Manufacturability - Honeywell worked with Fictiv’s design for manufacturability (DfM) team to optimize the model for CNC machining-a much faster process than the traditional casting method.
Quote-to-Order in Minutes - Honeywell’s engineers used the Fictiv quote-to-order platform to upload and order the revised component in just minutes, instead of waiting days or weeks for a quote.
Rapid Delivery - Fictiv then securely matched the order with one of the highly vetted CNC machine shops in its global network for rapid production.
Read the full story here...
www.fictiv.com...
#cncmachining #manufacturing #aerospaceindustry

Пікірлер: 3
@paulma5057
@paulma5057 Жыл бұрын
Thanks for sharing and very impressive
@fictivmade
@fictivmade Жыл бұрын
Thank you!
@3rdaxis649
@3rdaxis649 Жыл бұрын
Yea Yea Sure;)
How an ASML Lithography Machine Moves a Wafer
16:15
Asianometry
Рет қаралды 435 М.
hyperMILL ADDITIVE Manufacturing Aerospace Nozzle
3:55
John Hart
Рет қаралды 1 М.
Throwing Swords From My Blue Cybertruck
00:32
Mini Katana
Рет қаралды 11 МЛН
The CUTEST flower girl on YouTube (2019-2024)
00:10
Hungry FAM
Рет қаралды 39 МЛН
1ОШБ Да Вінчі навчання
00:14
AIRSOFT BALAN
Рет қаралды 5 МЛН
This is The World's Most Complex Construction Project
31:45
The B1M
Рет қаралды 534 М.
Chip Manufacturing - How are Microchips made? | Infineon
13:32
Infineon Technologies
Рет қаралды 3 МЛН
Friction Stir Welding Tool Technologies
2:21
TheGrenzebachGroup
Рет қаралды 176
Honeywell Product Overview
1:24
GalcoTV
Рет қаралды 3,8 М.
The Truth About SIM Card Cloning
13:04
Janus Cycle
Рет қаралды 1,1 МЛН
How to achieve nanometer precision in space?
11:07
Breaking Taps
Рет қаралды 716 М.
The Material Science of Metal 3D Printing
15:00
Real Engineering
Рет қаралды 2,6 МЛН
What is a Machine Operator and What Do They Do
1:05
Aerotek
Рет қаралды 38 М.