Рет қаралды 3,842
Our studio is now all complete. We moved into here 5 years ago and each year, slowly invested in different parts of the unit to bring it up to the standard we wanted.
If you are new to the channel, AWC was started by Alex almost 10 years ago on his parents driveway, and each year has developed to become the business it is today.
Here is a list of what we have done with the help of the companies who installed / supplied them.
- Converted a detailing bay into the reception
- Built 3 stud walls to separate the equipment bay from the other 3 detailing bays.
- Installed an air conditioning system
- Added air compressor lines
- Added a scissor lift ramp
- Had Garage Style fit vented floor tiles to the whole floor
- Added extra LED lighting to what was already a good base.
- Signage internally and externally
- Much more!