How to Make a Gantt Chart in Excel - Step by Step Tutorial - Gantt Chart Excel

  Рет қаралды 234,000

Gantt Excel

Gantt Excel

Күн бұрын

Пікірлер: 118
@Preethrdr
@Preethrdr 3 жыл бұрын
"Thank you for this brilliant tutorial. I created a Gantt chart in ten minutes and my boss was impressed. The other videos on this subject want you to add formulas and conditional formatting, the whole process takes a day and you end up with a broken Gantt chart. I love this automated template. Gonna ask my team to get the Pro version for our PM needs."
@GanttExcel
@GanttExcel 3 жыл бұрын
Glad it helped! Thank you for your kind words.
@RahadiyanDimyaman
@RahadiyanDimyaman 2 жыл бұрын
finally find the best one excel ganttchart... thanks a lot
@GanttExcel
@GanttExcel 2 жыл бұрын
Your are most welcome. Glad you love it!
@nickychan2516
@nickychan2516 3 жыл бұрын
Thank-you so much, this is gonna be really really helpful
@ruffbally6299
@ruffbally6299 2 жыл бұрын
It's just wondrefull, Thank you for this video!
@GanttExcel
@GanttExcel 2 жыл бұрын
Glad you enjoyed it!
@BambangWidjajanto71
@BambangWidjajanto71 2 жыл бұрын
Terima kasih atas tutorialnya, salam dari Indonesia
@GanttExcel
@GanttExcel 2 жыл бұрын
You are most welcome. We are glad you found it helpful.
@TheJamesclementcook
@TheJamesclementcook Жыл бұрын
This is excellent, thank you very much!
@GanttExcel
@GanttExcel Жыл бұрын
You are most welcome :)
@CRITTERSZONE6654
@CRITTERSZONE6654 Жыл бұрын
Thank you so much ,this was very helpful
@GanttExcel
@GanttExcel Жыл бұрын
You are most welcome!
@NathanielAddy
@NathanielAddy 7 ай бұрын
Great tutorial. Thank you
@GanttExcel
@GanttExcel 6 ай бұрын
You are welcome!
@valentinvicente1760
@valentinvicente1760 8 ай бұрын
Wonderfull!. Thanks!
@Friend-z-Mania
@Friend-z-Mania 2 жыл бұрын
Great Video !!
@GanttExcel
@GanttExcel 2 жыл бұрын
Thank you. We are glad you found it helpful.
@jasminegonzalez2007
@jasminegonzalez2007 3 жыл бұрын
Thank you!!
@MuhammadAli-ox6tj
@MuhammadAli-ox6tj 4 жыл бұрын
very practical tool and easy to use
@GanttExcel
@GanttExcel 4 жыл бұрын
@Muhammad Ali - Thank you for your kind feedback
@neskiraudales3438
@neskiraudales3438 2 жыл бұрын
Amazing video
@GanttExcel
@GanttExcel 2 жыл бұрын
Thanks!
@shahramtaleghani2034
@shahramtaleghani2034 Жыл бұрын
So Nice.
@GanttExcel
@GanttExcel Жыл бұрын
Thank you! Cheers!
@terrymgl2485
@terrymgl2485 2 жыл бұрын
Amazing!
@GanttExcel
@GanttExcel 2 жыл бұрын
Thank you! Cheers!
@pusaris
@pusaris Жыл бұрын
Hi John, Thank you very much for your video. I tried this template and I am deciding to upgrade to PRO version but I have a quesion how many users can use this Excel file. Do I have to buy the license per user?
@GanttExcel
@GanttExcel Жыл бұрын
Please reach out to our support team on our website for Pro licensing.
@MUSONIJado
@MUSONIJado 3 ай бұрын
Very interesting. I bought the pro version 4 and started using this Gantt chart Excel. I'm asking if I can upload it to my Microsoft drive or google sheet to update the progress with my supervisior
@GanttExcel
@GanttExcel 2 ай бұрын
You can share your file to your supervisor on Microsoft drive/ shared networks but your supervisor will need to download the file to access the automation.
@sharmacreatives255
@sharmacreatives255 3 жыл бұрын
Dear sir. This interface is really awesome....im planning to buy this pro..... could we have additional tracking information for the delays....im facing delays from planning team....by not getting material delivery sometime....by this where our targets get's buffered...
@GanttExcel
@GanttExcel 3 жыл бұрын
Thanks you. Yes, you can track delays by turning on the 'Show overdue tasks' in the Settings form.
@mastermanju9691
@mastermanju9691 Жыл бұрын
can we purchase this software in india
@bedruhassencustomclearinga3469
@bedruhassencustomclearinga3469 2 жыл бұрын
wonderfull
@GanttExcel
@GanttExcel 2 жыл бұрын
Thank you! Cheers!
@carmelashobbies
@carmelashobbies 3 жыл бұрын
I bought the ExcelPro, and very useful for me. i'm a production engineer and reviewing this, and planning to recommend to my Manager. I have some request: 1. (I bought the "Day" version), but how can I edit the to have this increment of half day (.50), quarter (.25) . 2. There is an option of adding "column", how can I move the column in the worksheet, e.g. - adding description column to a task.
@GanttExcel
@GanttExcel 3 жыл бұрын
Thank you buying the Pro version. We currently can set the duration as a whole number. The developers are working on a version that will allow fraction of days/ hours. You can unhide the notes column in the Settings window under the columns tab. You can also move columns around as well or insert new custom columns.
@carmelashobbies
@carmelashobbies 3 жыл бұрын
@@GanttExcel , thanks for updates. to the uprev version, how can we uprev our current version? Are we getting patches or a notification to updates to new version?
@GanttExcel
@GanttExcel 2 жыл бұрын
Please raise a ticket at ganttexcel.com and we will help you out.
@shibaza13tigabelas75
@shibaza13tigabelas75 3 жыл бұрын
i've been looking for this for a long time. thank you so much for this efforts. may I know what are differences between between free and registered version?
@GanttExcel
@GanttExcel 3 жыл бұрын
Hello, You are most welcome. The differences between the free and Pro version are listed at the link below. www.ganttexcel.com/gantt-chart-template-download/
@yousefbakor6072
@yousefbakor6072 2 жыл бұрын
Hi John, Thanks for your informative video. I have the pro license and I've been trying to remove some tasks by removing the raws, but it keeps showing the below message: "Please do not insert/delete cells, rows and columns. You can insert tasks by clicking.. etc." please let me know how i can remove some or the whole tasks on one time. Thanks
@GanttExcel
@GanttExcel 2 жыл бұрын
Dear Yousef, You can select the task and then click the 'Delete task' button in the Gantt menu.
@DDX01
@DDX01 2 ай бұрын
Dear sir You have done an awesome work. sir can I put my own video about your this gantt chart on my channel. I will also show your name an website for purchasing the pro version from you.
@fritserasmus1402
@fritserasmus1402 3 жыл бұрын
Hi John, Thanks for your informative video. I have been trying out the hourly view template and it works very well. I realize I'll need to invest in the Pro version BUT I noticed that the GANTT chart get really very long if all 24 hours are in the chart. Is it possible to NOT display NON WORKING hours so the GANTT chart will be more than 75% shorter. If there is anyone else out there that can assist, please do not hesitate to provide some pointers. Thank you
@GanttExcel
@GanttExcel 3 жыл бұрын
Frits, You are most welcome. You can click on the daily view if you have the project running over several days. We have a new feature to hide weekend and holiday columns as well in Hourly and Daily view. We will also work on hiding Non Working hours as well.
@GanttExcel
@GanttExcel 2 жыл бұрын
Frits, thank you for your feedback. Happy to inform you that we have added a new feature to hide non-working hours in the Hourly view.
@alauralopez
@alauralopez 2 жыл бұрын
Thanks for the tutorial, it is super helpful! :). How can I get the pro version?
@GanttExcel
@GanttExcel 2 жыл бұрын
You are most welcome. We are glad you found it helpful. You can download the pro version at the link below. www.ganttexcel.com/gantt-excel-pro/
@sultanallauddin
@sultanallauddin 3 жыл бұрын
Hi, your tool is really awsome. I'll ask my boss to allow me for the Pro version soon. I have 2 questions: 1) In the free version, if I make a mistake and want to Undo it, the Undo option is not active in the template. It also does not work with CNTRL + Z. What can I do? 2) Some of my task names are too long and are hidden by the next cell (indicating the Priority). It does not work if I simply try to make the make the cell bigger by pulling it on the right side. How can I view the full task name?
@GanttExcel
@GanttExcel 3 жыл бұрын
Thank you Junaid. You can try increasing the task column width and then try wrapping the text. The excel Undo button unfortunately go one step back at a time whereas the automation would have done a thousand changes in a few milliseconds and hence can't be used.
@Heart4KidsNonProfit
@Heart4KidsNonProfit 3 жыл бұрын
Thank you for such a concise tutorial. Is there a way to import tasks or copy and paste several tasks?
@bryanmartinez291
@bryanmartinez291 2 ай бұрын
Can you create critical path items?
@GanttExcel
@GanttExcel 2 ай бұрын
We are working on critical path but a version is far off as critical path rendering is very complex.
@jamsrocks2
@jamsrocks2 9 ай бұрын
is there a possibility to add the S-curve for this?
@GanttExcel
@GanttExcel 8 ай бұрын
Thank you for your feedback, we will try to add this to our next major release.
@SamiTarakji
@SamiTarakji 3 жыл бұрын
Thanks for your tutorial, and I would like to clarify if there is any possibility to change the weekend days or to adjust ot to a single off day only. ?
@GanttExcel
@GanttExcel 3 жыл бұрын
Yes you can change the work days for the Organization or for a single resource. Please click on the Resource button in the Gantt menu to set workdays and holidays. kzbin.info/www/bejne/opfGqoaGjtSKna8&t
@dennisatakent
@dennisatakent 2 жыл бұрын
In order to show dependencies of task do you always have to create a child- parent task?
@GanttExcel
@GanttExcel 2 жыл бұрын
Not really, you can setup task dependencies between normal tasks as well. www.ganttexcel.com/gantt-chart-template-task-dependencies/
@davidheggestad2424
@davidheggestad2424 2 жыл бұрын
Okay, I have purchased Pro. If I want to set tasks, like framing, to a standard "task" with it's own color say brown, then another standard task, like electrical, to yellow...etc. etc., how do I do that so I use the same common tasks against multiple projects? Then how can I sort all of the tasks from all projects in a single Gantt? In other words, I want to see the framing needs from 10 different projects so I can see where, given current staffing, there is a conflict of resource. That would mean I would have to change timelines or add staff to keep all projects framing needs as is....
@GanttExcel
@GanttExcel 2 жыл бұрын
David, you can double click a task to set the task color for that particular task. We are planning to integrate resource capacity planner into Gantt Excel later this year.
@kikiu696
@kikiu696 4 жыл бұрын
Hello, The tool is very good and helpful. I would like to ask you to make actual start date and actual finish. When you put times in actual start date and actual finish date to visualize how long in really taks. A lot of time it happens that when you start some task actual time to finish is longer that what you plan.
@GanttExcel
@GanttExcel 4 жыл бұрын
@Kiril - You can unhide the actual date columns in the Settings window> Columns. You can also turn on "Show Actuals bar" in the Settings window.
@sharmacreatives255
@sharmacreatives255 3 жыл бұрын
Dear sir....in this gantt... could we have additional information...planned start, end and Actual start, end... Where the Gant bar to be formated to show the task like...completed, pending, ongoing,delayed, extended, early completion..... Pls check these features can we able to incorporate into this Gantt excell....
@GanttExcel
@GanttExcel 2 жыл бұрын
We have this feature where you can track baseline and actual dates. We also have a status field to track completed, in-progress, planned etc. And the next version will allow you to add custom status using your own formulas.
@ammarnoraldeen2677
@ammarnoraldeen2677 3 жыл бұрын
Thank you so much dear just one question how can I add Gantt Menu in Menus bar?
@GanttExcel
@GanttExcel 3 жыл бұрын
The Gantt Menu will automatically show up in all Gantt Excel files when you open the file and enable macros.
@preciouschuks3501
@preciouschuks3501 3 жыл бұрын
Hello can I download a Gantt excel file separately
@GanttExcel
@GanttExcel 3 жыл бұрын
Sure Precious, You can download it at this link - www.ganttexcel.com/
@dariushmoradinezhad878
@dariushmoradinezhad878 2 жыл бұрын
Hello. If my project runs non stop 24 hours 365 days a year, how can I apply that into my calendar?
@GanttExcel
@GanttExcel 2 жыл бұрын
You can extend the timeline by clicking the Setup Gantt Timeline button in the Gantt menu
@mlugin8050
@mlugin8050 2 жыл бұрын
Is it posdible to change the date formats to german?
@GanttExcel
@GanttExcel 2 жыл бұрын
Sure, The dates automatically should show up in German if you have set the language in regional settings to German. You can also reach out to our support team on our website for additional help.
@mlugin8050
@mlugin8050 2 жыл бұрын
@@GanttExcel thanks! I just shiwed this to my biss and he was interested. I might buy a copy to test it for our mid sized construction company
@rachitdolia7183
@rachitdolia7183 3 жыл бұрын
In the free version the timeline does not adjust automatically, I can only see till Aug month...pls let me know how to do that. as I want to plan project till end of the year..
@GanttExcel
@GanttExcel 3 жыл бұрын
Rachit, please click on 'Setup Timeline' button to select the start date and end date of the timeline and the timeline will automatically update. You can view this video to setup the timeline - kzbin.info/www/bejne/naOuoIOpgciJZ7s
@carmelashobbies
@carmelashobbies 3 жыл бұрын
How to have this Gantt Excel Template
@GanttExcel
@GanttExcel 3 жыл бұрын
Here is the download link - www.ganttexcel.com/gantt-chart-template-download/
@mykavkaz
@mykavkaz 3 жыл бұрын
I don't have gantt chart button... is this kind of extra future?
@GanttExcel
@GanttExcel 3 жыл бұрын
Mago Faes, enable content (macros) when you open the file. The Gantt Chart Excel Menu will load and you should be good to go.
@mykavkaz
@mykavkaz 3 жыл бұрын
@@GanttExcel Thank you!
@ShreeRam-qp9gv
@ShreeRam-qp9gv 2 жыл бұрын
How to get report in parent task complete percentage in report sheets
@GanttExcel
@GanttExcel 2 жыл бұрын
You can click the Export to XLSX button and filter by parent tasks or modify the project dashboard with new charts.
@gultiazkhan5344
@gultiazkhan5344 3 жыл бұрын
Jhon i can't find Gant chart menu in Excel (2007) how can i find it?
@GanttExcel
@GanttExcel 3 жыл бұрын
Gultiaz please reach out to our support team at support.ganttexcel.com/
@tonyfilipe3162
@tonyfilipe3162 3 жыл бұрын
Hi I have used a paid version of the product for sometime now version 2.49.8, Wondering if it's worth updating to Pro2021 version??? are there significant changes in the new version?
@GanttExcel
@GanttExcel 3 жыл бұрын
Dear Tony - Our support team will get in touch with you at the email address used while purchasing the Pro version.
@gopinath5694
@gopinath5694 4 ай бұрын
how to download this sheet
@GanttExcel
@GanttExcel 2 ай бұрын
Please download from ganttexcel.com
@andthetruthshallsetyoufree3618
@andthetruthshallsetyoufree3618 4 жыл бұрын
Hi I downloaded the free version.And I could not enter the Project Sheet name and the duration in the project details.Please advice.
@GanttExcel
@GanttExcel 3 жыл бұрын
Please check out our Quick start guide at the link below and if you face any issues please visit our website to raise a support ticket. www.ganttexcel.com/how-to-create-a-gantt-chart-in-excel/
@gingchenhuang1650
@gingchenhuang1650 Жыл бұрын
How to report problem at Gantt Excel
@GanttExcel
@GanttExcel Жыл бұрын
Please raise a ticket at GanttExcel.com
@fioremarra3388
@fioremarra3388 4 жыл бұрын
Nice product! Do you have any plans to show the critical path in future releases?
@GanttExcel
@GanttExcel 4 жыл бұрын
Thank you. We will be adding Critical Path in 2021
@justmonique82
@justmonique82 3 жыл бұрын
@@GanttExcel Hello, has this been updated/added?
@eng.hafizhabibhabib1268
@eng.hafizhabibhabib1268 3 жыл бұрын
How can I change the currency from the dollar to the Saudi riyal?
@GanttExcel
@GanttExcel 3 жыл бұрын
Please click on the Settings button in the Gantt Menu and change the currency under the 'General' tab.
@samtrishberg2682
@samtrishberg2682 3 жыл бұрын
Is there a way to hide non work days such as Saturdays and/or Sundays?
@GanttExcel
@GanttExcel 3 жыл бұрын
We will be adding this feature in a few months.
@martaorozcomossi
@martaorozcomossi 3 жыл бұрын
Hi! I am trying to add a long sentence in the "Task name" section but it doesn't show. Does anyone knows how to make the task name bar longer? How to expand it? I want the whole sentence to show
@GanttExcel
@GanttExcel 3 жыл бұрын
Marta you can increase the task column width and click on Wrap text or turn it off based on your preferences.
@mahaejaz4189
@mahaejaz4189 3 жыл бұрын
How to get this GANTT button?
@GanttExcel
@GanttExcel 3 жыл бұрын
You can watch this tutorial - kzbin.info/www/bejne/b2isnqyZop2EsLc
@muqadastanveer4749
@muqadastanveer4749 3 жыл бұрын
how to add gantt menu i have no gantt menu in my excel sheet
@GanttExcel
@GanttExcel 3 жыл бұрын
Muqadas, The Gantt Menu will automatically show up in all Gantt Excel files when you open the file and enable macros.
@namiknam
@namiknam 4 жыл бұрын
Hello, I tried to ask you a question through your website but there is no reach point before being a customer. I hope I can get to someone. I would like to use your product as a production schedule tool. If I can manage to set dependencies automatically I believe it will work without any modification. Is there a way that I can set the dependency of a task to the task one row above it. So every new task (Product that needs to be produce) will be dependent finish to start the one above. But if I move the task one row below dependency should be changed automatically. Is there a way to do that?
@GanttExcel
@GanttExcel 4 жыл бұрын
@Namik Nam - All our versions support task dependencies. You can watch this video for task dependencies in Gantt Excel kzbin.info/www/bejne/oonMhWagm9iJl8k | You can also reach out to our support team @ www.ganttexcel.com/
@TheKaysteve
@TheKaysteve 3 жыл бұрын
what is the process to purchase the pro version. How does new features affect the old one purchased.
@GanttExcel
@GanttExcel 3 жыл бұрын
Hi, You can purchase the Pro version at www.ganttexcel.com/gantt-excel-pro/ . Also please contact us at support @ ganttexcel dot com for further assistance.
@arwaaaa4709
@arwaaaa4709 2 жыл бұрын
i don’t have a gantr chart tap in my excel
@GanttExcel
@GanttExcel 2 жыл бұрын
Please click on the Enable Macros button when you open the file - kzbin.info/www/bejne/l6G0mHWJnMqEbMU
@donaldkatrin5598
@donaldkatrin5598 3 жыл бұрын
Do you have tutorials in French?
@GanttExcel
@GanttExcel 3 жыл бұрын
Dear Donald, we will be creating video tutorials in French and Spanish later this year.
How to Enable Macros - Gantt Excel
1:19
Gantt Excel
Рет қаралды 29 М.
Make This Awesome Gantt Chart in Excel (for Project Management)
17:13
Kenji Explains
Рет қаралды 540 М.
Tuna 🍣 ​⁠@patrickzeinali ​⁠@ChefRush
00:48
albert_cancook
Рет қаралды 148 МЛН
How to Make the BEST Gantt Chart in Excel (looks like Microsoft Project!)
15:59
How to Make a Gantt Chart in Excel
12:54
Vertex42
Рет қаралды 3,8 МЛН
How to Make a Simple Gantt Chart in Excel
17:09
Lineth Dela Cruz
Рет қаралды 46 М.
TECH-005 - Create a quick and simple Time Line (Gantt Chart) in Excel
9:36
The Excel Challenge
Рет қаралды 3,3 МЛН
How to create a Gantt Chart in Excel
6:37
Ajay Anand
Рет қаралды 92 М.