@MohammedAhmed-io4zy 4 жыл бұрын
The final important step is to demagnetizing a transformer to remove the residual magnetic flux. otherwise they they will be a large inrush currents on the primary side, that could trip the protective relays.
@electronicatutorial
@electronicatutorial 4 жыл бұрын
Hipot is a different test than Megger. Hipot measures leakage current and Megger measures insulation resistance.
@shahulexplore
@shahulexplore 3 жыл бұрын
But he did insulation test ; it means device he used is meggar ; I too little confuse ....
@electronicatutorial
@electronicatutorial 3 жыл бұрын
@@shahulexplore There are many insulation tests like tan delta, hipot, resitance of insulation, partial discharge etc. Hipot measures current leakage and Megger or insulation resistance measures de resistance of the insulation which is very high os supposed to be very hihg in hte Gigahoms and current leakage in in the mA.
@Tonhu2002
@Tonhu2002 3 жыл бұрын
Do I need to short circuit the busing terminals of each side together
@ssennonojohnmary4406
@ssennonojohnmary4406 Жыл бұрын
Excellent demonstration.
@maazahmad1631
@maazahmad1631 4 жыл бұрын
Pls can you make this test on digital megger, so we will understand the exact value
@Greystonewet
@Greystonewet 2 жыл бұрын
All right, but what about safety? As it’s a high voltage test you should prepare proper PPE like certified rubber gloves and safety-hook, and buddy system.
@mdanwaralam2653
@mdanwaralam2653 4 жыл бұрын
What should be Megger voltage for 11000/415 volt distribution transformer
@sujitkumardash5650
@sujitkumardash5650 Жыл бұрын
2500 V for HT-E & HT-LT 500 V for LT-E
@goldfish5606
@goldfish5606 3 жыл бұрын
Should you not have disconnected all the line and neutral terminals of the transformer?
@drichidominic4645
@drichidominic4645 3 ай бұрын
Good work
@meksen2000
@meksen2000 4 жыл бұрын
Why is the guard tip of the meter empty?
@Rahul-bp9vl
@Rahul-bp9vl 4 жыл бұрын
Please provide link of magger 🙏to purchase
@runbou3485
@runbou3485 2 жыл бұрын
Thanks ticher 👏អគុណ
@nasiruddinhimu5075
@nasiruddinhimu5075 4 жыл бұрын
How many time measure HV-GND , LV-GND , HV-LV....1 minute or 5min....plz details explain
@pancakeface777
@pancakeface777 3 жыл бұрын
what device did you use to shoot the video with?
@veeruppcltarget5642
@veeruppcltarget5642 9 ай бұрын
very nise I am from India 👌👌
@visakhpradeepedathil2177
@visakhpradeepedathil2177 4 жыл бұрын
Why only one phase is checking in primary and secondary. Usually we need yo check between each phase and earth.
@imadewn
@imadewn 4 жыл бұрын
Visakh pradeep edathil Look at the winding...if one of the bushing's insulation failed, the transformer is failed. for both primary and secondary.
@visakhpradeepedathil2177
@visakhpradeepedathil2177 4 жыл бұрын
@@imadewn thanks bro. @ site i saw people testing between all pahses and earth. Is that ok.
@imadewn
@imadewn 4 жыл бұрын
Visakh pradeep edathil no problem, but it waste of time i think haha
@toqeerahmad7378
@toqeerahmad7378 3 жыл бұрын
Great Demonstration...
@ridhoalpha
@ridhoalpha 4 жыл бұрын
is this in central java? the MV is 3-phase 4-wire?
@imadewn
@imadewn 4 жыл бұрын
Ridho yes it is
@razaulkarim6796
@razaulkarim6796 4 жыл бұрын
can u give pdf link of accptable value of resistance
@ardy680
@ardy680 4 жыл бұрын
1000 x volt
@electricaltech4u45
@electricaltech4u45 4 жыл бұрын
Nice bro
@mintipatel2183
@mintipatel2183 3 жыл бұрын
Right but short dtr possigen
@surendrakverma555
@surendrakverma555 4 жыл бұрын
Very good
@mirtunjaykumar9349
@mirtunjaykumar9349 3 жыл бұрын
Nice
@salmansheikh838
@salmansheikh838 4 жыл бұрын
nice video
@mikeadler434
@mikeadler434 9 ай бұрын
👍👍
@dharampalsingh326
@dharampalsingh326 2 жыл бұрын
👍👌🙏🙏🙏
@zavidsayed340
@zavidsayed340 2 ай бұрын
Aap acchi tarah se video nahin banaya clarity nahin hai aapka video sahi nahin hai
@adarshmb5
@adarshmb5 4 жыл бұрын
good video
Insulation Resistance Test of Transformer
7:21
The Engineering Power
Рет қаралды 106 М.
Transformer Turns Ratio Test - Protec Equipment Resources
29:47
Protec Equipment Resources
Рет қаралды 32 М.
Каха и дочка
00:28
К-Media
Рет қаралды 3,1 МЛН
One day.. 🙌
00:33
Celine Dept
Рет қаралды 80 МЛН
Transformer Insulation test اختبار عزل المحول
5:50
Electrical Site Engineer
Рет қаралды 37 М.
How 3 Phase Power works: why 3 phases?
14:41
The Engineering Mindset
Рет қаралды 1,8 МЛН
Transformer IR Test
7:22
Butch Chxa
Рет қаралды 26 М.
How to test transformers
16:22
Serge Levesque
Рет қаралды 32 М.
Transformer Inspection Walkthrough
17:17
Southwest Electric Co.
Рет қаралды 39 М.
Turns Ratio Test (TTR ) of Transformer
6:31
The Engineering Power
Рет қаралды 59 М.
Winding Resistance Test of Transformer
4:09
The Engineering Power
Рет қаралды 37 М.
Mit1025 Insulation Resistance Tester - Getting Started
2:39