Рет қаралды 1,347
There is a lot going on in today's video. I don't have the time or energy to make videos on each individual part so I just lump everything together in one video so you can get a glimpse of what my days are like and the variety of things I do.
I have Scott's cylinder head finally finished and the valve job came out great. Each valve was lapped into the seat for a perfect fit and liquid tight seal. This AMC Jeep 258 cylinder head is ready for cleaning and assembly.
Next I have a Jeep T18 transmission on the bench and a 208 transfer case sitting next to it. I am trying my best to get back on the Jeep J20 pickup truck project and this will help me get one step closer. I am going to adapt the Jeep T18 to the NP 208 with a new mainshaft and adapter kit. The transmission is in remarkable shape and I am happy to have such a good unit to start with.
A quick look at a Willys L6-226 engine that I have to get out of the shop. It is for sale and it came out of a running truck that had this engine replaced with a Chevy 350 engine. The mice did get into the bellhousing so that will need attention.
On to the U bolt bending dies that I made for the Dana 70 and custom Dana 44 axles. I like to make my own U bolts so I can control the material used and the quality of the bending. I did make a few test bends and checked the fit and I am now ready to begin bending the actual U bolts that I will use on these axles.
At this point in the day the weather is good enough to begin painting the Willys CJ2A body tub and all other body parts. I am laying down some OD green on this CJ2A and trying to keep a wet edge because it is so warm out. I am using an Iwata spray gun and have the slowest reducer mixed to keep this paint from drying too fasts. Lots of work to keep everything looking good and you can see the results.
A few minutes left in the day so I am getting serious about finally cutting the axle shafts for the custom, shortened Dana 44 that I am building. The 4340 material is ready to go and the dividing head is set up. The cutters that I had made are finally on some arbors and I should be ready to cut the splines very soon if I can get a free moment with no distractions.
Shop is busy and chicken processing has started so free time is in short supply. More videos coming on a variety of Willys, Jeep, Farming and hopefully soon new building construction.