Multi-tower Modeling and Seismic Analysis Process-ETABS | Part-1 | Sandip Deb | ilustraca

  Рет қаралды 17,029

ilustraca

ilustraca

Күн бұрын

Пікірлер: 29
@ravishankar.p5542
@ravishankar.p5542 9 ай бұрын
What an excellent teaching ...superb..sir
@vinayrb8682
@vinayrb8682 Ай бұрын
How to create basement floors in edit storeys. Now you created podium above NGL right. Constructing podium above NGL is good or below. Can you show the retaining wall modeling and design for basement . Why shellthin for slab. Why can't membrane. We need to design beam on safer side but on assigning shell, beam will get weaker and slab will not transfer full load properly to ground. Also please take up flat slab structures like banquet hall in nxt videos.
@fazalarju
@fazalarju 2 жыл бұрын
nice video also an unique. please continue the analysis and design part.
@ramzanshaikh1656
@ramzanshaikh1656 20 күн бұрын
How to design for 5 seismic zones. ??? What will be the changes ???
@vinayrb8682
@vinayrb8682 Ай бұрын
For shearwalls pier labelling need to be assigned right but here not applied. Waiting for gravity loads, lateral loads and OHT (water pressure) assignment for these towers. And diaphragm whether rigid or semirigid to be assigned for high rise towers and for whole structure or each floor we need to assign , have confusion in this could you clarify .
@ahmadaboel_soud6352
@ahmadaboel_soud6352 3 ай бұрын
If I have two towers without a combined podium, can I use this process or should I create separate models for each tower
@aldiputra9236
@aldiputra9236 9 ай бұрын
Sir.. can you explain why the beam near shear wall to big reinforcement result..can we model using “release beam” from shear wall?
@kuldeeps3830
@kuldeeps3830 2 жыл бұрын
Can you do manual analysis of all footings? It helps.
@rajkumar-bd7yj
@rajkumar-bd7yj 2 жыл бұрын
very nice, thanks for sharing....can you please suggest me the system specifications required for designing high rise in etabs, bcoz when we run 25 storey getting slow and takes around 1 hr for run analysis
@ilustraca
@ilustraca 2 жыл бұрын
It always varies..the system I'm using has 1TB SSD, 6GB RTX Graphics, 16GB RAM
@deniscalebalvarado3133
@deniscalebalvarado3133 9 ай бұрын
You can replicate Tower 1 on Tower 2 but you have to select de replicated elements and asign them as part of the tower 2 in the Asign/Asign Objects to Tower tab
@sandeepshrestha8202
@sandeepshrestha8202 2 жыл бұрын
What is the difference when we select yes/no for auto pier option while modeling wall?
@ilustraca
@ilustraca 2 жыл бұрын
If you select YES , Pier Labels will be assigned Automatically, if you select No, you need to assign Pier label manually
@canerozek6088
@canerozek6088 Жыл бұрын
May i ask how about pushover analysis for multi tower?
@mominshadabanjum2916
@mominshadabanjum2916 2 ай бұрын
Waiting for part 3
@aldiputra9236
@aldiputra9236 8 ай бұрын
How to apply seismic load if our tower rotated 45 degree from global axis sir? Because if I running with the seismic so the seismic direction load can’t change follow rotation of building..
@ce.001
@ce.001 Жыл бұрын
Please make video on Wind.
@mohitvats2211
@mohitvats2211 2 жыл бұрын
Please make video on steel structure and its connections in etabs.
@meetpatel3850
@meetpatel3850 11 ай бұрын
Which research paper are you reffer
@deoanand05
@deoanand05 2 жыл бұрын
sir, i want to design hybrid structure... same as u... in which podium is simple RCC building with normal slab ... and tower 1 & 2 will be flat slab structure... can we do this sir in etabs... ???
@xanzem
@xanzem Жыл бұрын
You can.
@mukeshmishra3696
@mukeshmishra3696 2 жыл бұрын
Bring out etabs and staad pro courses as well !!
@ilustraca
@ilustraca 2 жыл бұрын
ETABS course is on-going on my android app "ilustraca"
@ChinTanLimbani
@ChinTanLimbani 2 жыл бұрын
Waiting for Part 2
@ilustraca
@ilustraca 2 жыл бұрын
will post very soon
@mouhamedelmoustaphasow1079
@mouhamedelmoustaphasow1079 Жыл бұрын
Hello dear . We have done a tower in ETABS however we are facing a problem of the running analysis. It’s blocked at 1% for 24hours . Can you help me please
@ilustraca
@ilustraca Жыл бұрын
You have correct the modelling... First check the Model for modelling errors.
@Amin-oq1qq
@Amin-oq1qq Жыл бұрын
Where is part 3??
@hardikrangani1610
@hardikrangani1610 2 жыл бұрын
Add etabs file next videos
When u fight over the armrest
00:41
Adam W
Рет қаралды 14 МЛН
ROSÉ & Bruno Mars - APT. (Official Music Video)
02:54
ROSÉ
Рет қаралды 269 МЛН
Modeling Large Commercial Building/Tower in Etabs
20:22
DECODE BD
Рет қаралды 11 М.
Complete ETABS Structure Design in ETABS 2021
1:39:48
PTS CAD EXPERT
Рет қаралды 18 М.
MULTI EDIFICIOS EN ETABS
27:05
Diseño de Proyectos en Ingeniería y Biaxial SAC
Рет қаралды 1,5 М.
Advanced modelling in etabs tutorial Video - Complete Training
22:17
Engineering Learning Platform
Рет қаралды 31 М.
Epicons Webinar 134   Structural Design of Tall Buildings with Podium & Basement
3:15:41
Multi-storied Building Design in Etabs v18 | IS 456:2000 | Part-1
1:05:53