Nursing Home Demolition (Part 4), Bethesda

  Рет қаралды 8,396

John Z Wetmore

John Z Wetmore

Күн бұрын

Пікірлер: 13
@dirtguy6537
@dirtguy6537 2 жыл бұрын
I'm gonna be in a nursing home before he's ever done.
@Tbpker22
@Tbpker22 2 жыл бұрын
Interesting to learn how building was constructed years ago - thanks for the video!
@REWYRED
@REWYRED 2 жыл бұрын
That has to be the weirdest chimney I have seen yet...
@constructionwatcher5381
@constructionwatcher5381 2 жыл бұрын
It certainly was. The architect sure wanted that chimney to come through the roof at the ridge. They had to build a brick pier across the hall to hold up the offset chimney.
@constructionwatcher5381
@constructionwatcher5381 2 жыл бұрын
Thanks for the update, John. If one watches closely, it's clear that the priorities are: 1. Keep all the mixed debris out of the masonry. 2. Separate all the masonry possible without getting other debris mixed in - this is clearly important since he spends some time pulling out chunks of concrete floor slabs. 3. Separate the substantial chunks of metal, especially the copper, and as much of the lighter stuff as can be easily separated. This is no doubt driven by disposal costs and regulations. It would seem, since he's still employed there, that his employers think he's doing a good job of it, and the economics of disposal make care in separation more important than speed.
@PreservationEnthusiast
@PreservationEnthusiast 2 жыл бұрын
He should be using a selector grab if material separation is a priority. A bucket with a thumb is very much 2nd choice.
@jonnyteeee
@jonnyteeee 2 жыл бұрын
Got to get the title as the worlds slowest operator 🤦🏻‍♂️🤦🏻‍♂️🤷🏽‍♂️
@heathsmith3734
@heathsmith3734 2 жыл бұрын
I agree 💯
@gammock4026
@gammock4026 2 жыл бұрын
I agree with the other viewers' comments. Operator rakes through the rubble dragging the bucket back and then promptly pushes it all forwards again. Sometimes a small piece of iron piping is removed. Surely another workman could pick out those bits and chuck them on a heap - it doesn't need a huge excavator. Glad to see stuff is being salvaged though.
@michaelstadtler6122
@michaelstadtler6122 2 жыл бұрын
The operator would seem fairly new thru more then just because he's trying to keep materials separate. When in the kill zone he hesitates and is weary of his actions. Thru this bucket is not the best for this kind of destruction as well. Half way thru and ready to nap. But thanks for the video.!
@Doc0652
@Doc0652 2 жыл бұрын
What a waste of Diesel
@_nelson
@_nelson 2 жыл бұрын
Excavator operator Slow as a snail Really I would be claw the hell out of that wall
Nursing Home Demolition (Part 5), Bethesda
1:25:37
John Z Wetmore
Рет қаралды 7 М.
Jefferson Street Demolition (Part 4)
52:53
John Z Wetmore
Рет қаралды 682
This dad wins Halloween! 🎃💀
01:00
Justin Flom
Рет қаралды 29 МЛН
А что бы ты сделал? @LimbLossBoss
00:17
История одного вокалиста
Рет қаралды 11 МЛН
Миллионер | 2 - серия
16:04
Million Show
Рет қаралды 1,8 МЛН
Busting The Dam On A 60 Year Old Irrigation Pond
24:28
letsdig18
Рет қаралды 1,3 МЛН
PLOWING SNOW IN A BLIZZARD! Lake Tahoe, California - CAT 938G
25:45
Griff Granger
Рет қаралды 1 МЛН
October 4, 2024 - Century III Mall Demolition
9:08
Tim
Рет қаралды 2 М.
John  Deere Excavator and Ford 6.0 demolishing a Burnt out House
29:14
Detour Ahead!! Water main break!!!
25:38
Detour Ahead
Рет қаралды 7 М.
Richlieu Ave House Demolition
45:07
John Wesner
Рет қаралды 115 М.
Building Demolition in Farmington, MO
28:03
BHinsPOL
Рет қаралды 70 М.
Jefferson Street Demolition (Part 3)
1:10:10
John Z Wetmore
Рет қаралды 2 М.
This dad wins Halloween! 🎃💀
01:00
Justin Flom
Рет қаралды 29 МЛН