Part 2 The terminations to power on the Voltage Optimiser

  Рет қаралды 4,220

Jointech Cabling

Jointech Cabling

Күн бұрын

Пікірлер: 22
@Murph9000
@Murph9000 7 ай бұрын
You can get a butane powered heat gun fairly cheaply. They are just dual function mini blowtorches that run off lighter gas. You install a catalyst block on the front to get them to produce heat without flame. I've got a little Dremel VersaFlame which currently costs about £40 on Amazon. It's small and low powered, but pretty much perfect for a quick bit of shrinking. It also has a soldering tip for use as a basic low power iron. There are plenty of others on there, some for as little as £20. Not sure how good the others are, but there's a Draper one for £20 which would probably not melt/explode, although I don't think it has the little curved deflector to heat both sides evenly. Not that tape is evil, or anything, just if you wanted a way to cheaply be able to shrink stuff with the power off.
@danielelise7348
@danielelise7348 7 ай бұрын
Seeing that spanner across the bars gives me the willies,even though it's off,still creeps me out.⚡⚡⚡☠️☠️☠️
@lolMyke
@lolMyke 10 ай бұрын
Been waiting for this as an electrician from Canada I find your work fascinating
@micolislongis5558
@micolislongis5558 10 ай бұрын
Nice. Back in 2010 when the government had many incentive schemes for renewable installs etc I was going around fitting single phase voltage optimisation units in homes all around the north and midlands. Eventually the company stopped offering them to clients as the constant switching on and off was driving the home owners mad. I get the theory if you're living close to a substation and your intake voltage is 250 plus, but they just seemed a bit gimmicky to me for a regular home. They seem more suited to a large commercial/industrial setup.
@raywelshman
@raywelshman 10 ай бұрын
Hi Tony, another interesting video, the optimiser is only going to save money on resistive loads i.e. electric kettles & ovens etc. it will not make any difference to devices using SM PSUs these already lower the voltage/wattage to a lower level also remember this applies all the led lights which now replace the old resistive type lamps. Obviously as it's a hotel there will be a lot of resistive load devices, I look forward to the results Tony if you are able to obtain them in the future. Regards from Ray (the old sod) from North Wales.
@chrisfox8125
@chrisfox8125 10 ай бұрын
Is there any reason why the ACB wasn’t racked out and locked, tagged off?!
@DanielCraigie
@DanielCraigie 10 ай бұрын
Thanks for posting the video. The camera occasionally caught the right hand side of the mains bus bar(s) and you could see single core cables tapping off (before the links) which seemed to follow the same direction of the bus bars down to the distribution panels. Does this mean that the optimiser is covering most but not all of the load in the Hotel? Could there be any issues with L1/L2/L3 phases running at different voltages inside the same building?
@tinasmith6260
@tinasmith6260 9 ай бұрын
Tony you seriously need a new Milwaukee M18 Cutter, M18 Stripper and M18 Crimper
@jamesmee6696
@jamesmee6696 10 ай бұрын
Hi Tony I think it might be beneficial to upgrade your Crimper tool.. as it happens I have got the Klauke EK120/42 CFB for sale complete with die set if you’re interested as I don’t tend to install the big cables anymore. Interesting video but how do you achieve volt drop on long run cables (eg) sub mains when the incoming voltage is decreased.?
@stuartolseen214
@stuartolseen214 10 ай бұрын
Hi Tony Wouldn’t it be beneficial to install a three way by-pass switch in the event of a failure to the optimiser and maintenance purposes
@stefankruger3634
@stefankruger3634 10 ай бұрын
lovely job
@sergiofernandez3725
@sergiofernandez3725 10 ай бұрын
Little thumbs up Tony
@RichardArblaster
@RichardArblaster 10 ай бұрын
Great job 😎
@Jay369
@Jay369 10 ай бұрын
Blooper reel coming soon 😂👌
@gabor.nadudvari
@gabor.nadudvari 10 ай бұрын
The principle of energy conservation states that energy cannot be created. This is the base of physics. If they need 200kWh to keep the hotel temperature at level, then it will be 200kWh (plus the loss on the "optimizer") in any shape of form. There is no free energy. If you use resistive load, like a water heater, then it will result longer heating period, but the end result (E=P*t) is the same. If you use heat pump, fridge, led lights etc, then they will not care due to the inverter. You can save with insulation, lowering comfort temperature, using more efficient or dimmable lights etc. 253V is just in the limit, but at the end of the final circuits it will be far lower. If you start at 226V, that is already below than the 230V nominal voltage. Then you can end up below the norm at the final circuits.
@meeganian
@meeganian 10 ай бұрын
Do u ever use contact connection grease?
@irechopshop
@irechopshop 10 ай бұрын
But surely less voltage = higher current and as metering is normally in KWh how can they be saving money
@timbo19
@timbo19 10 ай бұрын
P=IV but you are wrongly assuming that P stays the same. Take, for example, a simple resistive load. I=V/R so if you reduce the voltage then the current flowing through the load also reduces.
@sdgelectronics
@sdgelectronics 10 ай бұрын
Your assumption is only valid for certain loads.
@brianoceallaigh8714
@brianoceallaigh8714 10 ай бұрын
No gloves! PPE for electric shock! would not get away with not using any here in Ireland, health and safety would have you run off site 😂
@TezzaRES
@TezzaRES 10 ай бұрын
Why would he need PPE for electric shock if the systems isolated?
@obd6HsN
@obd6HsN 10 ай бұрын
Either you have safe isolation - and you don't need gloves - or you don't, and you need full arc flash gear.
I dont usually point out other tradesmens' bad work, but...
22:57
Jointech Cabling
Рет қаралды 9 М.
The Most Important Circuit for our Electrical Future?! (PFC) EB#55
11:26
So Cute 🥰 who is better?
00:15
dednahype
Рет қаралды 19 МЛН
This is how many things were wrong before id even stared!!
25:48
Jointech Cabling
Рет қаралды 6 М.
vphase voltage optimiser review are they worth it
7:37
Adam Julyan
Рет қаралды 4,4 М.
Victron DC Distribution Equipment
10:05
Kienan Maxfield
Рет қаралды 9 М.
Deutsch - my new favourite rugged connector
15:13
bigclivedotcom
Рет қаралды 245 М.
How To Check ECM Motors - HVAC Training
11:07
HVAC Pioneer Controls
Рет қаралды 25 М.
Working on a 3 Phase ‘Widow Maker’ | ØY38
17:51
Cory Mac - ØY Electrical
Рет қаралды 125 М.
4cx120 x2 With a little bit of a problem
19:10
Jointech Cabling
Рет қаралды 6 М.
Terminating a 630A 3 phase supply
27:39
Residual Electrical
Рет қаралды 51 М.
The BEST Mechanical Display You've EVER Seen!!!
13:51
Tin Foil Hat
Рет қаралды 563 М.
Use CAT6 to feed your Antenna instead of Coax
9:44
ve6wz
Рет қаралды 39 М.
So Cute 🥰 who is better?
00:15
dednahype
Рет қаралды 19 МЛН