How to take level for grade beam high concrete level or low concrete level
@RJ-jl4fb2 жыл бұрын
Super
@blankspace_arch_construction2 жыл бұрын
Thank you
@arunkumars62882 жыл бұрын
Why cant us stop the pile concrete below 1m from ground level for pile cap instead of breaking?
@blankspace_arch_construction2 жыл бұрын
Because the slurry is mixed with the concrete we should not stop the pile concrete before 1m from ground level.we should completely let the slurry to flow out.
@smileyisi38219 ай бұрын
How much pile cap for 3 bedrooms?
@Onlinebliss Жыл бұрын
What is the recommended Iron rod spacing for 2 in 1 and 3 in 1 pile cap formation?