Рет қаралды 34,169
The entire steering system is finished and fitted. The fuel system is fitted. The rear tub gets some serious attention, primed, undercoated, topcoated and then that's fitted as well!
Chapters:
0:00 The Steering System
14:52 Prepping for paint
17:38 More Steering System
21:55 Primer (etch)
24:51 Steering Alignment
30:55 Primer (high build)
32:51 Fuel System
39:51 Undercoat (black)
40:18 Gearstick & Handbrake
42:42 Undercoat and Topcoat (sandglow)
48:31 Fuel Lines
51:51 Topcoat (black)
52:46 Tub fitting
Project Kermit is a 1978 Land Rover Series 3 109 (long wheel base) which is being stripped right down and rebuilt with a 200tdi engine and a few other improvements. The other videos in the series can be found in this playlist: • Project Kermit: A Seri...
If you want to join those supporting my channel (starting at £1!) you can check out my Patreon page here:
www.patreon.com/user?u=37285132
Patrons get lots of exclusive videos and updates on myself and my projects. Thanks to the support of Patrons I am able to make videos almost full-time, but without needing any corporate sponsors.
My website: maximusironthumper.co.uk/