Putzmeister: Multi Z Boom

  Рет қаралды 34,678

Putzmeister

Putzmeister

Күн бұрын

Пікірлер: 10
@achieve-inno
@achieve-inno 2 жыл бұрын
Great video
@victorjayloyola249
@victorjayloyola249 4 жыл бұрын
i love your video , very helpful for beginners !
@erick9eable
@erick9eable 5 жыл бұрын
What sections do you move to open and close the z boom formation?
@PutzmeisterGlobal
@PutzmeisterGlobal 5 жыл бұрын
Mosheh Baruch You asked, "What sections do you move to open and close the z boom formation?" The operator has the option to run single or Multiple functions. In the video I was moving A, B, C, D all at the same time. Most will use C, D, together then A, B as needed it is completely up to the operator to use any combination that suits the job site.
@PutzmeisterGlobal
@PutzmeisterGlobal 5 жыл бұрын
First you Need to uplift the A arm vertically. Then fold out B, C, D.
@jasondriskell2923
@jasondriskell2923 5 жыл бұрын
What is the best position for the boom to be in when priming out?
@PutzmeisterGlobal
@PutzmeisterGlobal 5 жыл бұрын
Your boom can be placed in any position but make sure that the hinge of the last arm has the highest position. This ensures that all the primer moistens the whole delivery line.
@johnnytyrrell7060
@johnnytyrrell7060 5 жыл бұрын
I'm from Dublin Ireland and we have it in an A frame 2 up 2 down
@thebeerhive5041
@thebeerhive5041 5 жыл бұрын
Johnny TYRRELL agreed! Priming out in z frame can cause you to plug. The water will separate in between the second and third.
@pablocobb5343
@pablocobb5343 4 жыл бұрын
Putzmeister is like a copied version of schwing. To me schwing is the best in concrete pumps
PUTZMEISTER ERGONIC 3 operating system: it’s a WINNER!!!
22:24
Canadian Concrete Pumper
Рет қаралды 2,8 М.
Putzmeister: Boom Pipe Inspection
6:50
Putzmeister
Рет қаралды 14 М.
요즘유행 찍는법
0:34
오마이비키 OMV
Рет қаралды 12 МЛН
Какой я клей? | CLEX #shorts
0:59
CLEX
Рет қаралды 1,9 МЛН
Dialling in your Putzmeister/HBC boom functions:
16:07
Canadian Concrete Pumper
Рет қаралды 5 М.
Putzmeister: M42-5 Setup with ESC position R1s
6:22
Putzmeister
Рет қаралды 175 М.
Putzmeister: 36Z Meter Outrigger Deployment
5:56
Putzmeister
Рет қаралды 15 М.
Mr. John Tutorial : Operations of a Concrete Mix Truck
7:56
Mr. John Tutorials
Рет қаралды 216 М.
Putzmeister: Presenting the new 20m class Concrete Pumps
3:24
Putzmeister
Рет қаралды 17 М.
Putzmeister: Filter Change Concrete Pump
11:19
Putzmeister
Рет қаралды 45 М.
Concrete boom pump operation. Remote functions with Muddyfeet
22:52
Muddyfeet Concrete Pumping
Рет қаралды 61 М.