The 4 "P" Know-What for a Quantity Surveyor | Preliminaries, Provisional Sum, Prime Cost, Preamble

  Рет қаралды 14,007

Quantity Surveying Studio

Quantity Surveying Studio

Күн бұрын

Пікірлер: 41
@bondfazil007
@bondfazil007 3 жыл бұрын
Very useful video, highly recommended.
@real_shine
@real_shine 2 жыл бұрын
Wonderful explain and easy to catch..keep rock...all the best
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
Thanks a lot
@manhaseema9590
@manhaseema9590 2 жыл бұрын
Very use full thank a lot
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
You are welcome !!
@kevinasega282
@kevinasega282 2 жыл бұрын
Very informative. Great presentation.
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
Thanks a lot !!!
@vepakrishna7513
@vepakrishna7513 2 жыл бұрын
Very informative, thanks a lot. Below are some of my doubts, I will be thankful, if you can reply. 1) what about the cost of builders work / civil work / indirect work for executing the works listed under PC & PS items? 2) Is Project duration depends on PC & PS Items? 3) If there is a change in the amount or list of items of PC & PS Amount, how it will be treated? 4) What assistance is to be allowed by the Contractor for PS & PS amount items subcontractors Thanks
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
1. It should be included while pricing it 2. It should also be considered. 3. Depending on actual usage, the final amount can reduce or increase. 4. Attendance and coordination percentage can be claimed by main contractor.
@vijaynmr
@vijaynmr 3 жыл бұрын
Very useful and informative video.....
@QuantitySurveyingStudio
@QuantitySurveyingStudio 3 жыл бұрын
Thanks a lot for the positive feedback!!
@Adnan.4474
@Adnan.4474 2 жыл бұрын
Very informative, Good job bro 👍👍
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
Thanks a lot.
@amosarockiasamy
@amosarockiasamy 3 жыл бұрын
Very Helpful..
@QuantitySurveyingStudio
@QuantitySurveyingStudio 3 жыл бұрын
Glad to hear that
@salmanameen5959
@salmanameen5959 Жыл бұрын
Super informative
@QuantitySurveyingStudio
@QuantitySurveyingStudio Жыл бұрын
Thanks a lot !!!
@chilufyachristopher9804
@chilufyachristopher9804 2 жыл бұрын
Thank you.
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
You are welcome
@PradeepKumar-sw8hl
@PradeepKumar-sw8hl Жыл бұрын
very useful. pls upload related to cesmm explanation videos is possible.
@QuantitySurveyingStudio
@QuantitySurveyingStudio Жыл бұрын
Have already uploaded
@vishwazoysa9100
@vishwazoysa9100 3 жыл бұрын
Good work , keep it up !
@QuantitySurveyingStudio
@QuantitySurveyingStudio 3 жыл бұрын
Thanks a lot !!!
@priyajain2013
@priyajain2013 2 жыл бұрын
Superb
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
Thanks a lot !!
@qsbestimate3472
@qsbestimate3472 3 жыл бұрын
Quality video
@QuantitySurveyingStudio
@QuantitySurveyingStudio 3 жыл бұрын
Thanks a lot for the positive feedback!!
@aravindnmdc117
@aravindnmdc117 2 жыл бұрын
Great
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
Thanks a lot !!
@john21219811
@john21219811 3 жыл бұрын
Your videos are very useful and fully appreciated. i have a small clarification regarding the PC rate and provisional sum items, from my expereince not all PC rate and PS items need to be nominated unless the contract specifically states so, correct me if i am wrong
@QuantitySurveyingStudio
@QuantitySurveyingStudio 3 жыл бұрын
Usually these will be done by Nominated sub contractor. Hence the provision for same. If contract specifies the contractor itself to carry out the work, then it will be their responsibility. But ultimately these are priced at later stages.
@mdtouseef6940
@mdtouseef6940 2 жыл бұрын
Does the PC rate remains fixed? Why the contractor will require invoice from supplier to determine the price when it's already mentioned in BOQ? And does it always means that PC rate is the price of only supply of material..and thus it by default means that main contractor scope will be excluding supply of that material?
@sabhisaini4518
@sabhisaini4518 2 жыл бұрын
Hello sir how can we calculate preliminaries breakdown sheet rates
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
That depends on the quotations and bills of different utilities.
@sabhisaini4518
@sabhisaini4518 2 жыл бұрын
@@QuantitySurveyingStudio sir please make a video on preliminary breakdown sheet 🙏🙏🙏🙏
@mdtouseef6940
@mdtouseef6940 2 жыл бұрын
The nominated sub contractor will be contractually dealing directly with the client or their contract will be with main contractor?
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
Contract will be between main contractor and NSC but the NSC will be decided by client.
@jumeenmohamed6589
@jumeenmohamed6589 2 жыл бұрын
Is the preamble is made by QS?
@QuantitySurveyingStudio
@QuantitySurveyingStudio 2 жыл бұрын
Yes.
Violet Beauregarde Doll🫐
00:58
PIRANKA
Рет қаралды 50 МЛН
The CUTEST flower girl on YouTube (2019-2024)
00:10
Hungry FAM
Рет қаралды 41 МЛН
女孩妒忌小丑女? #小丑#shorts
00:34
好人小丑
Рет қаралды 100 МЛН
Underwater Challenge 😱
00:37
Topper Guild
Рет қаралды 47 МЛН
Rate Analysis of a Construction Project | Basic Elements | Direct & Indirect Cost
13:31
24 Quantity Surveying Terms You Need To Know
5:12
Metroun Quantity Surveying
Рет қаралды 26 М.
Cost Plan & Bill of Quantity | The difference | Interview Question
7:46
Quantity Surveying Studio
Рет қаралды 4,4 М.
Quantity Surveying | Pre Contract vs Post Contract | Consultant vs Contractor
20:48
Quantity Surveying Studio
Рет қаралды 18 М.
What Is Construction Planning?
11:26
Jason Schroeder
Рет қаралды 1,5 М.
Watch this if you are a Quantity Surveyor | Never do this
8:17
Quantity Surveying Studio
Рет қаралды 2,8 М.
What's the difference between prime costs & provisional sums?
1:14
Begbie Bentham Design & Construct
Рет қаралды 3,1 М.
AUTOCAD Tip | Don't forget this before your Quantity Take offs
6:50
Quantity Surveying Studio
Рет қаралды 13 М.
Skills of a good QS | 9 secrets to become an unmatchable Quantity Surveyor
29:36
Cost Engineering Professional
Рет қаралды 107 М.
Violet Beauregarde Doll🫐
00:58
PIRANKA
Рет қаралды 50 МЛН