Рет қаралды 3,834
This was the first time this machine moved under its own power following a full engine strip and rebuild for tuning work. The crank was lightened and rebalanced, a steel conrod and roller big end were fitted, new main bearings, new alloy barrel, shortened and bored out a little to accept a 9:1 piston, the head was ported, the inlet cam timing was retarded and every other component checked and then it was all reassembled.