Very happy to find an engineer upgrading the air Senecas
@jbhk7977 Жыл бұрын
You should take the gauge out to make sure no filings ar caught in the tube. I hope to see a kit like this for the wing shot II
@AfricanAirOrdnance Жыл бұрын
You can dry fire the gun untill it's empty then push the cocking handle forward this will push the valve stem in making sure it was empty
@nmcnms3 жыл бұрын
what are the bit sizes? 12mm for the transfer port but that would take out the threading on that front hole
@romomaxedbmep80914 жыл бұрын
Whats the operating pressure or bell curve. Would i have to shoot it at 250bar? Would it perform at 180-225b? From the factory my sweet spot is 190b-140b. Actually makes less power at 210b which is what it says in he owners manual. Keeping my 74 cu ft tank at 250b would be tiresome. My local gun smith and i have watched all these vids. He is confident of installing it. He shot it once (his 1st PCP) now hooked. Thanks for a great video.
@glasserallen3 жыл бұрын
Great video very helpful.
@kevinalt17074 жыл бұрын
To anyone thinking of doing this dont be intimated by it ,,it's very easy I did mine on my little drill press
@AfricanAirOrdnance4 жыл бұрын
Yip thought it better to put out videos to help more to come