SETTING OUT - How to set up a Total Station. Step by step guide to set up your EDM and level it.

  Рет қаралды 9,500

SITENG

SITENG

Күн бұрын

SITENG-Setting Out #4 "EDM setup" In today's video I am showing how to set up your total station. It's a step by step guide on how to accurately level and set up the instrument.
JOIN the best engineering community 👍👍👍 SUBSCRIBE NOW!!! 👍👍👍
leave the THUMBS UP!!! Follow the LinkedIn page 😁
LinkedIn: / siteng
/ greg-stepien-7346ab183
Subscribe: www.youtube.co...
👷‍♀️👷‍♂️ EVERY GOOD CIVIL SITE ENGINEER MUST HAVE - watch the VID
👉 • 10 MUST haves for CIVI... - items I use and recommend 😁
SAFETY BOOTS-choose your size ⬇️⬇️
👉 amzn.to/3NfjUCJ
👉 www.screwfix.c...
TAPE MEASURE ⬇️⬇️
👉 amzn.to/3xQ3cEf
👉 amzn.to/3xZ9ykM
TAPE HOLDER ⬇️⬇️
👉 amzn.to/3NzLDOV
👉 ffx.co.uk/prod...
CALCULATOR - sometimes you can find them half price in Supermarkets 😁⬇️⬇️
👉 amzn.to/3u2hHE6
DRAWING FOLDER ⬇️⬇️
👉 amzn.to/3NqYoeA
👉 amzn.to/39OUNZP
NOTEBOOK - get whatever really to take some notes 😁⬇️⬇️
👉 amzn.to/3HQkbLx
PENCIL - 0.7mm - good price, but for this colour 😁⬇️⬇️
👉 amzn.to/3OlvwW3
PENCIL - 2mm ⬇️⬇️
👉 amzn.to/3QHVIff
JOINER'S PENCIL ⬇️⬇️
👉 amzn.to/3xRIaFl
TIPP-EX - these are the best I used ⬇️⬇️
👉 amzn.to/3QNrKGH
PERMANENT MARKERS ⬇️⬇️
👉 amzn.to/3ykpcZv
CHALK LINE ⬇️⬇️
👉 amzn.to/3A0aUOY
👷‍♀️👷‍♂️FEW EXTRAS I USE TOO 👇
SMALL SPIRIT LEVEL - you can always borrow from a Chippie if needed 😁 ⬇️⬇️
👉 amzn.to/3OEXs79
KNIFE ⬇️⬇️
👉 amzn.to/3HQKUrl
GLASSES - Despite you will get safety glasses, on some sites they’re really low quality and I don’t want to get my sight worse using them. Fortunately it’s a rare situation :)
👉 amzn.to/3nawPeN
👉 amzn.to/3yhMMWM
GLOVES - I got them first on one of the jobs and I use only these from then 😁⬇️⬇️
👉 amzn.to/3bvldjC
-IMPORTANT-
Some links in the description may contain one or more affiliate links for items mentioned in my videos - the items I personally use and recommend. You will support my channel if you use these links, as I will get a small commission of the sale. The price is exactly the same without the link, but this way you will help the continuous growth of the channel. Affiliate links are primarily Amazon.
#civilengineering #siteengineer #constructionuk

Пікірлер: 56
@justicejulio5725
@justicejulio5725 3 жыл бұрын
this is the perfect channel i have been looking for i hope and see more potentials in your videos as surveys is concern more grace sir
@SITENG
@SITENG 3 жыл бұрын
Thanks Julius! Will be more and more coming so I hope you'll enjoy them too :)
@justicejulio5725
@justicejulio5725 3 жыл бұрын
@@SITENG definitely sir
@justicejulio5725
@justicejulio5725 3 жыл бұрын
@@SITENG sir o wish to find if u have a training program for those instruments
@justicejulio5725
@justicejulio5725 3 жыл бұрын
if there is any sir can we discuss in detail about that sir you can reach me though this email sir ngalajitijulius@gmail. com or of there is any that i can reach you i will be grateful
@SITENG
@SITENG 3 жыл бұрын
@@justicejulio5725 I meant to do a course, but have no time at all now, if this changes I'll let you know.
@user-lx7it7zo7w
@user-lx7it7zo7w 9 ай бұрын
I enjoy the video, but do show me how to put my station point manually and orientation and stakeout manually. Thanks
@SITENG
@SITENG 9 ай бұрын
just type it in using the Leica keyboard
@osmosisconstruction2825
@osmosisconstruction2825 2 жыл бұрын
thanks for the productive videos
@SITENG
@SITENG 2 жыл бұрын
Glad to hear that! Thank you for the comment 👍👍
@rasalih9200
@rasalih9200 2 жыл бұрын
Thank you so much engineer !!
@SITENG
@SITENG 2 жыл бұрын
You are welcome! Thank you 🙏
@ifeanyiokpala623
@ifeanyiokpala623 2 жыл бұрын
I must say your videos are very informative, what is the difference between using prism and EDM? I noticed when you are setting up with the EDM you didn't bother using the red light under the instrument to set it up.
@SITENG
@SITENG 2 жыл бұрын
Hi! Mostly on sites you will be using retro targets so there should be reflective tape target set on your EDM. In this type of resection you don't need a point - station to set the instrument
@wasimmohammed7709
@wasimmohammed7709 2 жыл бұрын
Nice video, great Informative!!
@SITENG
@SITENG 2 жыл бұрын
Thank you! Glad you like it 😁
@wasimmohammed7709
@wasimmohammed7709 2 жыл бұрын
@@SITENG keep moving more sir, We will support to watch out it..
@tonymaguire9498
@tonymaguire9498 3 жыл бұрын
Love your videos boss keep up the good work
@SITENG
@SITENG 3 жыл бұрын
Thanks Tony!!! I will do :)
@krukarlukasz3834
@krukarlukasz3834 Жыл бұрын
You fortgot to mention to stamp the legs before putting instrument on the tripod, in loose ground pushing it down might be not good enough.
@SITENG
@SITENG Жыл бұрын
On the concrete I just set the legs and push them making sure they won't slide not stamping on the legs at this might only break them in this case. You are right on the loose ground we need more and I am always driving the legs fully in with the tripod wide open, stamping on the legs.(parallel to the leg unlike some ppl do - breaking the legs)
@constructionmypassion4699
@constructionmypassion4699 Жыл бұрын
♥️♥️♥️
@javidhasilov1004
@javidhasilov1004 4 жыл бұрын
good work, bro
@SITENG
@SITENG 4 жыл бұрын
Thank you Cavid :)
@ediseu6440
@ediseu6440 3 жыл бұрын
Thanks
@SITENG
@SITENG 3 жыл бұрын
Thanks Ediseu!
@edwincaneda4030
@edwincaneda4030 2 жыл бұрын
Hi Sir, I noticed you did not enter the instrument height. Thanks for your response.
@SITENG
@SITENG 2 жыл бұрын
Hi Edwin! In this case height is taken and calculated from targets I use for resection. If I would set up over a point with known height then I would have to add the instrument height to get correct set up level (right instrument level)
@edwincaneda4030
@edwincaneda4030 2 жыл бұрын
@@SITENG Thanks Sir, now I understand that instrument height must be entered when setting up over a point with known height. I am a survey assistant only, we perform dimensional control survey of the structure we fabricate. Our surveyor always set the instrument height at 0.000, what is the impact on the survey result? Shooting point after another point, when he sees that the digital value of the level is around 0.0005 and above, he adjusts it so that it is near to 0.0000. Someone said it is a big mistake.
@SITENG
@SITENG 2 жыл бұрын
Hi! I don't really understand adjusting the height? 0.0005 is nothing. You have to speak with him, as I don't know exactly what are you doing guys there. Once your resection is done you shouldn't change anything, maybe he is intentionally cheating a bit on the surveys - which is possible.
@krukarlukasz3834
@krukarlukasz3834 Жыл бұрын
@@edwincaneda4030 you cannot re-level your EDM during survey. If the EDM is out of level, you must do another set up, and then continue the survey. How do I know? - I did the same when I was a beginner ;) PS I agree with SITENG - out of level of 0.0005 in nothing to worry about - you would have to ask in your company what is ok and what is not)
@edwincaneda4030
@edwincaneda4030 Жыл бұрын
@@krukarlukasz3834 Thank you so much for the enlightenment. It has definitely increased my knowledge in the use of EDM and understanding of surveying.
@danielboakyeyiadom1634
@danielboakyeyiadom1634 3 жыл бұрын
I want to do a course on setting out engineer but don't have any knowledge in civil engineering. Is it possible for me to do it. Thanks
@SITENG
@SITENG 3 жыл бұрын
Hi Daniel! Yes it's possible, you have to look for a setting out course somewhere near you. It might be some college as well providing courses. There will be more and more about civil engineering here on siteng channel so you will learn a lot :)
@ediseu6440
@ediseu6440 3 жыл бұрын
Hi, I have a new job, to mark the grid lines on each flor on the tower. How can I transfer the stations from down level to up level 54 levels building? Please I need this info!! I can’t do any resection !!
@SITENG
@SITENG 3 жыл бұрын
Hi Ediseu! Is there any chance to use/set some stations on the buildings around? Can you use stations contractor used before? Are there openings in the slab (plummet points) you can use to set your EDM through?
@ediseu6440
@ediseu6440 3 жыл бұрын
@@SITENG Hi, yes, it’s a opening holes in the slab , how can I do it please? No stickers around...🤔🤔
@ediseu6440
@ediseu6440 3 жыл бұрын
@@SITENG I can’t set up any stations around of the building, nothing around 😩thanks for yours responding 🤝🤝
@negotiummeum9643
@negotiummeum9643 2 жыл бұрын
@@SITENG oh yeah, that would be interesting (and apparently very useful) topic if you cover it (maybe you did it later - I don't know yet, I'm watching your videos from beginning). I just know one of the ways engineers are using - poly/plexiglass/acrylic glass with cross target over those openings in the slab ... but definitely would like to see it done and explained in details
@jaykaytravels1052
@jaykaytravels1052 3 жыл бұрын
Hello can you explain how to put down primary control points on a site?
@SITENG
@SITENG 3 жыл бұрын
Hi Jay Kay! You have to install your own targets (retros) and co-ordinate them (using survey program). You will need base information anyways, these might be UKPN nails around the site, or other points based on which you can do a resection.
@tonymaguire9498
@tonymaguire9498 3 жыл бұрын
What does ukpn stand for
@JoshGillespie1
@JoshGillespie1 3 жыл бұрын
I am looking at doing a setting out course I’m a formwork joiner by trade how far can you go with just doing the setting out course ?
@SITENG
@SITENG 3 жыл бұрын
As far as you want really :) Once you start doing setting out the doors are open for everything. You will get experience and knowledge and step up. Engineer I worked with lastly was a damper driver who did a course and he's now engineer and he's really good, so everything up to you! I will be organizing some course soon as available courses not really teach you the site reality, but I want to make sure that after my course one can take an exam which gives them 'the paper'
@JoshGillespie1
@JoshGillespie1 3 жыл бұрын
Where would your course be located and will you be doing it via citb
@SITENG
@SITENG 3 жыл бұрын
Not via citb yet, just want interested people to actually work with EDM in field. But there is a college where you can do exam only once you can use edm to get your surveying ticket and their course not getting you really ready to site while it's quite expensive.
@negotiummeum9643
@negotiummeum9643 2 жыл бұрын
@@SITENG Hi Greg, any updates on the course? I know with those crazy pandemic times you can't plan anything really :) Just wondering if this is still on your agenda. Thanks
@actionframe
@actionframe 2 жыл бұрын
Whwe is this site...the country
@SITENG
@SITENG 2 жыл бұрын
Hi! It's in UK, I was working in London Wembley then 😁
@skan1410
@skan1410 2 жыл бұрын
Hi Greg, Can you teach me TS15? I am based in London/Surrey.
@SITENG
@SITENG 2 жыл бұрын
Hi Sachi! I am not in UK currently, probably will be back around April😁 Working on a course so will let you know when ready 👍👍👍
@skan1410
@skan1410 2 жыл бұрын
All your videos are very useful and help full to me. Thank you and keep it up..
@SITENG
@SITENG 2 жыл бұрын
Thank you 👍👍👍
@pranavkrajagiri6198
@pranavkrajagiri6198 2 жыл бұрын
can you explain in malaylam
@SITENG
@SITENG 2 жыл бұрын
No, sorry I can't. I hope you can still find the videos useful though 😁
ДОКАЗАЛ ЧТО НЕ КАБЛУК #shorts
00:30
Паша Осадчий
Рет қаралды 1,2 МЛН
王子原来是假正经#艾莎
00:39
在逃的公主
Рет қаралды 26 МЛН
АЗАРТНИК 4 |СЕЗОН 2 Серия
31:45
Inter Production
Рет қаралды 896 М.
WILL IT BURST?
00:31
Natan por Aí
Рет қаралды 44 МЛН
HOW TO SET UP A LASER LEVEL. CONSTRUCTION SITE LEVELLING.
11:59
Levelling setting up a quick set level
9:16
Mikebaldwin007
Рет қаралды 37 М.
How To Set out BOLT SETS Like a BOSS!
7:09
PQS Videos
Рет қаралды 878
Site Set Out - Understanding Profiles
4:45
Alan Warburton
Рет қаралды 106 М.
Tutorial Staking Out dg Alat TS Topcon ES-65
9:36
Ahmad Robial
Рет қаралды 8 М.
Surveying: Turning The Perfect Right Angle
4:53
LeanSurvey
Рет қаралды 175 М.
ДОКАЗАЛ ЧТО НЕ КАБЛУК #shorts
00:30
Паша Осадчий
Рет қаралды 1,2 МЛН