Shunting Authorities D/L - Lesson 7

  Рет қаралды 7,459

saras ojha

saras ojha

Күн бұрын

Пікірлер: 74
@rahulshukla1748
@rahulshukla1748 Жыл бұрын
प्रणाम सर, यदि डबल लाइन में ब्लॉक फॉरवर्ड करके शंटिंग कराना है किसी गुड्स ट्रेन का एवं ब्लॉक सेक्शन छोटा होने के कारण गाड़ी को अगले स्टेशन के होम सिग्नल को पार करना पड़े तथा गाड़ी को पीछे किसी दूसरी लाइन में बैक करना है तब कैसे shunting कराएंगे
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Normally ऐसा नहीं होता है दो स्टेशन के बीच इतनी कम दूरी नहीं रहती.
@mdalauddinansari4334
@mdalauddinansari4334 3 ай бұрын
Sir single line me v block back le sakte hai, jab block section ko shunting purpose se ocupy karna hai.
@nirajgupta6725
@nirajgupta6725 Жыл бұрын
WhatsApp number बताए सर
@AbhishekSharma-vv8rw
@AbhishekSharma-vv8rw 3 ай бұрын
Sir freely and kis kis condition me line clear dene k baad or pehle dono condition me shunting kaise karni h ya nahi karni h iski video laha milegi
@omgsolutons1
@omgsolutons1 Жыл бұрын
Sir aap bhut inteligent hai jo bilkul exactly sabi topic ko yad bi rkhte ho or smja bi dete ho
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Thank you 😊
@AnuragSingh-jj5so
@AnuragSingh-jj5so 4 ай бұрын
Sir, automatic signalled section D/L mein shunting rules btayiye na please. Also, can shunting on main running lines can be done in automatic signalling section or not. Rules kya hain Sir. Please explain. I really want to know.🙏
@mangalaprasadojha5328
@mangalaprasadojha5328 3 ай бұрын
Ok 👍
@srkdilipkumar151
@srkdilipkumar151 Жыл бұрын
In 4th case sm will do block back and ask rear sm for block section obstruction. After acknowledge from rear sm , shunting sm only give private number by putting block instruments in TOL. He will issue private number to loco pilot.. is this right sir?
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Yes, Correct 👍
@Umabhadanigupta
@Umabhadanigupta 5 ай бұрын
LSS off Kiya jayega sir And BSLB Tak Jana hai or BSLB ke par Tak Jana hai
@mangalaprasadojha5328
@mangalaprasadojha5328 5 ай бұрын
D/L mein shunting ke liye LSS off nahi kiya jata hai
@mdalauddinansari4334
@mdalauddinansari4334 3 ай бұрын
Agar kisi stoo signal ke niche shunt signal laga hai aur shunting ke dauran kharab ho jaye to us shunt signal ko par karne ke ley keya authority melega?
@mangalaprasadojha5328
@mangalaprasadojha5328 3 ай бұрын
T/369(3b)+PHS after correct setting, clamping & padlocking the points
@atultiwari8228
@atultiwari8228 Жыл бұрын
सर यदि एक स्टेशन में एडवांस स्टार्टर लास्ट स्टॉप सिग्नल है और उसके आगे ब्लॉक सेक्शन में IBS सिग्नल लगा है तो यदि आगे शंटिंग के लिए गाड़ी जाति है LSS के तो ब्लॉक फारवर्ड लिया जायेगा या नही और pvt no. T806 मे दिया जाएगा या नही
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Block Forward karke PN दिया जायेगा, Authority- T/806+PN
@AjayPaswan-g7x
@AjayPaswan-g7x Жыл бұрын
Very nice
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Thank you 😊
@poojajoshi-h4e
@poojajoshi-h4e Жыл бұрын
I am waching your lectures from some days, very knowledgeable.. I am preparing for ASM LDCE thank you for such a good material.. Can you plz Explain about Panel working or suggest some study material.Thank you
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
PANEL INTERLOCKING(APPENDIX XI) 1. It is modern signalling system provided at station where points and signals are operated from centrally located panels by mean of push buttons or knobs 2. Provides for relay/solid state interlocking and safety features are augmented for consolidation of interlocking 3. It eases the operation and eliminates time loss and confusion 4. Status of points, signals and reception lines are readily available on hand to SM which makes for smoother operation 5. Principal/ZRTI is responsible for Initial/Refresher training of staff in rules connected with panels 6. There are two types of panels, they are a) Siemens panel (German system) b) Podanur workshop panel (British system) SIEMENS PANEL:- 1. Stations diagrams depicted on panel board 2. Push buttons of different colors codes are provided near the points , signal etc for their operations 3. Buttons for other purposes such as cancellation etc are also provided 4. Normal set up is as follows 5. Buttons used are self restoring type return to normal on release 6. Buttons are required to be pressed for not more than 3 seconds 7. Nofunctioncanbeperformedbypressingsinglebutton 8. Two related buttons pressed and released simultaneously for operating given function 9. Normal and reverse indications are displayed by strip indications at concerned points 10.The indications flash when operated and become steady when correctly set and locked 11.Points locked indication appears as white dot near point 12.Points cannot be operated when white dot near points available 13.When points are occupied by train, the strip indications assume red 122 STATION MASTER AS 02 (NOV 2021) 14.Only two signal indications available ―red‖ and ̳green‘ for ̳on‘ and ̳off‘ 15.SM ensure route correctly set 16.All points indications are steady 17.Track circuit over route is clear 18.Press signal button ̳GN‘ and corresponding route button ̳UN‘ simultaneously 19.When signal cleared all track including overlap appear on panel 20.Point lock dot indication appear near concerned point 21.As train passes the aspect goes to ̳ON‘ 22.Route is released automatically 23.As train occupies each section of route the track indication changes from white to red 24.As train clears each section the indication disappears signifying route release 25.In case the route is not released automatically the route will be cancelled by route cancellation method POINT POSITION INDICATION SHOWING RED: (a) Ensure Station Master‘s key is IN and turned to unlock the panel, (b) Verify the point track indication for occupation, (c) If it is clear, call for ESM to attend the track failure, and (d) If the particular point is required to be operated under conditions on track circuit failure, operate the point button 'WN‘ with 'EWN‘ button.
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Podanur workshop panel:- 1.Station diagram depicted on panel with relevant point/signals/track indication 2.Knobsofdifferentcolorcodesareprovidedonpanelbelowthediagram.The number of points signals are painted on corresponding knobs for easy, identification. 3.Buttons for other purpose such as cancellation etc are also provided 4.Normal set up is Signal knobs- red , Point knob-black Shunt signal- yellow Siding signal- white emergency route cancellation-grey, Power failure-grey 5.The points and signals are operated by turning the knob switches to required position 6.Three indications are provided on top of each point button viz green-normal yellow-reverse, white-free. Green yellow flash during operation Signal indications repeated on panel are as per the signal on field 7.When signal taken off white strip lights up for entire route indication the setting and locking of route 8.Free indication above each point knob disappear when route is locked As train passes the aspect goes to ̳on‘ Route is released automatically As train occupies each section of route the track indication changes from white to red STATION MASTER AS 02 (NOV 2021) 9. After the completely train passes the route of the signal the route releases automatically 10. In case the route is not released automatically the route will be cancelled by route cancellation method
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
a. Panel become blank:- 1. Check the power supply, whether it failed, 2.On electrified sections change the switches to other AT or State Electricity supply. 3. On non-electrified section start generator. Generator shall not be used by more than four hours continuously, If required use the other generator, 4. If power is available and the fault continues, inform ESM/SI 5. Check the position of points and signals 6.Use crank handle to set the points and trains shall be dealt on an authority T.369(3b) duly clamping and pad locking the points. 7. If power is failed and alternative supply is not possible, take action as mentioned above. 8. In non-electrified section DC calling on signal has been provided, this signal can be taken off in case of power failure without starting generator, but it should be done after ensuring the correct position of the points. b. Point indication flashing when point is operated :- 1. If the flashing continues for 10 seconds, restore the points to its original position. Operate the points 4 to 5 times from N to R and R to N. 2. If flashing still continues, physically verify the points at site and remove any obstruction in the points between the switch and stock rails. 3. Again operate the points. 4. If the flashing still continues, treat the point as defective and inform ESM/SI. 5. Before extracting crank handle, keep the concerned point knob in required position.
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Instructions to release crank handle:- a) At central panel station, where the route is free or locked -- i. Ensure all signal knobs are normal, ii. Press the crank handle release button ̳YK‘. Crank handle free indication will appear. Continuously press the button and turn the HKT/EKT to the left to extract the key with crank handle. b) At end panel stations -- I. When the route is not locked, adopt the procedure as in (a) (i) and (ii). II. When the route is locked, press the crank handle release button after ensuring that signal knobs are normal. Then cancel indication will appear on the panel. After a lapse of 120 seconds, free indication will appear near the HKT/ EKT in the box. Now turn the key to left duly pressing the button and release it. 1. Use crank handle to set the point to the required position. Observe the position of each end to which side they are set,(wherever two ends are available) and decide whether both ends or only one end is to be cranked. 124 STATION MASTER AS 02 (NOV 2021) 2. After setting they shall be clamped and padlocked. 3. After setting the points, crack handle should be restored to HKT. 4. After setting the points if ̳N‘ or ̳R‘ indication available signals can be taken off after clamping and padlocking.. 5. Other wise receive the train on authority T.369 (3b) after clamping and padlocking the points.
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
c) Route cancellation Cancellation of route on Siemens panel :-- 1. Route cancellation procedure will be adopted to cancel the signalled movement or to change the route already set. 2. Before applying route cancellation ensure that the train has not passed the signal. 3. Press the concerned signal button {GN} and Emergency signal button {EGGN} to bring the signal back to „ON‟ position. 4. Keep pressing „GN‟ and „EUUYN‟ buttons simultaneously till such time cancellation indication white dot appears by the side of the concerned signal. 5. After white dot appears, release ̳GN‘ and „EUUYN‟ buttons and the flashing cancellation will become steady after an in travel of approximately 2 minutes. 6. Now press „GN‟ and „EUUYN‟ buttons. Keep „GN‟ pressed and release “EUUYN” and press concerned route button. 7. All track indications and white dot cancellation will disappear and the “EUUYN”counter will record next higher number and the SM shall enter the counter number in the special register with reasons.
@rammohanraomekala55
@rammohanraomekala55 4 ай бұрын
Good information sir
@mangalaprasadojha5328
@mangalaprasadojha5328 4 ай бұрын
Thank you ☺️
@kpsinghkamasti7911
@kpsinghkamasti7911 2 жыл бұрын
Miss you sir
@mangalaprasadojha5328
@mangalaprasadojha5328 2 жыл бұрын
We are now able to interact online through KZbin, Facebook or WhatsApp.
@naveensingh4512
@naveensingh4512 Жыл бұрын
Sir hand signal k vedio lyie please 💕💕💕
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Ok 👍
@MUKESHKUMAR-xf3xq
@MUKESHKUMAR-xf3xq 2 жыл бұрын
आपके पढ़ाने के बाद डाउट का चांस नहीं के बराबर रहता है सर जी
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Thank you for your encouragement 😊
@ImranKhan-bd7sg
@ImranKhan-bd7sg Жыл бұрын
Advance startor ko on me paar karne ke liye T806 par hi likha jainga kiya
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Yes 👍
@gummadikumar7014
@gummadikumar7014 8 ай бұрын
Sir some places inbetween GUNTUR TO GUNTAKAL NEW LINES that is Doubbling work station masters are rejecting to give T/806 is there any specific instructions to perform shunting, please for LOCO PILOT point of view
@mangalaprasadojha5328
@mangalaprasadojha5328 8 ай бұрын
Station where separate Shunting staff are posted, T/806 is exempted. Some stations where workload is more, are getting exemption from Sr DOM. Sr DOM got power to give such exemption. We have to find out the information from LI or TI Thank you for your query 😊
@itsmehari1591
@itsmehari1591 6 ай бұрын
Why block forward not applicable to single line?
@mangalaprasadojha5328
@mangalaprasadojha5328 6 ай бұрын
Because Up & Down trains run on the same line
@savankumar1941
@savankumar1941 Жыл бұрын
Sir isi trh g and sr ka topic laya kariye sir thank you sir
@sarasojha1835
@sarasojha1835 Жыл бұрын
kzbin.info/aero/PLZC4LXNezuQzmueMRYj6zwm6m1fAguomO watch complete playlist here.
@sarasojha1835
@sarasojha1835 Жыл бұрын
kzbin.info/aero/PLZC4LXNezuQzmueMRYj6zwm6m1fAguomO watch complete playlist here. It has all the topics of G and SR.
@AjayPaswan-g7x
@AjayPaswan-g7x Жыл бұрын
Causway picture ke saath
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Ok 👍
@RakeshSingh-qg4zo
@RakeshSingh-qg4zo Жыл бұрын
sir singal line block back hoga ya block forwarded ya dono
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
kzbin.info/www/bejne/oKXclJh8abyUna8 S/L ke liye uper vala link click kerke dekho
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Dono nahi hoga Ye dono D/L mein hota hai
@PARMESHWARLALLAL
@PARMESHWARLALLAL 2 жыл бұрын
Very very nice 🙏🙏
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Thank you 😊
@RakeshSingh-qg4zo
@RakeshSingh-qg4zo Жыл бұрын
single line me next staton ke side me Train ko send karke ke yard me send karna hai to Esko block back hoga ya block forwarded hoga sir.
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Block back/Forward only D/L mein hota hai
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Nothing
@RakeshSingh-qg4zo
@RakeshSingh-qg4zo Жыл бұрын
Thanks sir ge
@omgsolutons1
@omgsolutons1 Жыл бұрын
Aager rear block section se gadi aa rhi hai toh kya rear block section Mai shunting kr saktye hai ya nhi
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Nahi ker sakte
@rajneeshsingh8042
@rajneeshsingh8042 8 ай бұрын
Advance station means up direction ka station & rear station means down direction ka station,,,????
@mangalaprasadojha5328
@mangalaprasadojha5328 8 ай бұрын
Yes 👍
@rajneeshsingh8042
@rajneeshsingh8042 8 ай бұрын
@@mangalaprasadojha5328 thank u sir🙏
@santoshverma4738
@santoshverma4738 Жыл бұрын
Very nice sir ji
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
Thank you 😊
@pushpaojha2049
@pushpaojha2049 2 жыл бұрын
Good information
@VikashKumar-ln7ky
@VikashKumar-ln7ky 2 жыл бұрын
thanku sir 🙏
@mangalaprasadojha5328
@mangalaprasadojha5328 Жыл бұрын
You are Welcome 🙏
@mangalaprasadojha5328
@mangalaprasadojha5328 2 жыл бұрын
After going to the KZbin channel (Saras Ojha)please go to the Play List and select Railway, In this Railway list you will find all Our Rly videos. Thank you 😊
@srinivasulus9884
@srinivasulus9884 2 жыл бұрын
How trains are received again into station after shunt movement into forward section and rear section.
@mangalaprasadojha5328
@mangalaprasadojha5328 2 жыл бұрын
Train will be received after correct setting of points, clamping and padlocking. PHS will be shown at the points.
@mangalaprasadojha5328
@mangalaprasadojha5328 2 жыл бұрын
Because LSS and Home sig is not to be used for shunting movement.
Lurch - Lesson 8
16:11
saras ojha
Рет қаралды 6 М.
What is Shunting In Indian Railways and General Rules (In Hindi)
8:28
哈哈大家为了进去也是想尽办法!#火影忍者 #佐助 #家庭
00:33
How To Get Married:   #short
00:22
Jin and Hattie
Рет қаралды 24 МЛН
Ozoda - Lada ( Official Music Video 2024 )
06:07
Ozoda
Рет қаралды 17 МЛН
Exchange of All Right Signal - Lesson 10
15:33
saras ojha
Рет қаралды 9 М.
Departure Signal Defective - Lesson 81
11:49
saras ojha
Рет қаралды 6 М.
Flat Tyre (JPO) - Lesson 26
25:57
saras ojha
Рет қаралды 7 М.
Shunting precautions and authorities-railways
12:43
Raghuram Bhat - Railways
Рет қаралды 17 М.
IB Signal/IB Signal at On - Lesson 21
31:21
saras ojha
Рет қаралды 9 М.
Shunting Precautions - Lesson 5
16:13
saras ojha
Рет қаралды 11 М.
Mr. M.P Ojha, Sr. Instructor ZRTI, Hyderabad M.A, M.P.M
1:17:55
saras ojha
Рет қаралды 14 М.
#Sumo Rake JPO - Lesson 92
14:51
saras ojha
Рет қаралды 8 М.
哈哈大家为了进去也是想尽办法!#火影忍者 #佐助 #家庭
00:33