Im ancient enough to remember it getting built . Full of delays due to construction issues.5 years late opening fully (sound familiar ?) Maybe not as strong as they thought it was. State of the art at the time . Dental hospital too . Pure brutalist concrete . The royal infirmary which it replaced stayed for nearly a century , this monolith lasted for only 53 years .. boiler house was fascinating though 😉
@Papario11139 ай бұрын
Brilliant. Thanks for sharing. At 3.01 into the video am I going crazy or does a long arm appear to reach across ?
@steveb60279 ай бұрын
that was someone closing the window it was being recorded through
@veryhighguy9 ай бұрын
yes it was a reflection
@Papario11139 ай бұрын
I thought I was going mad and a huge arm came down haha. Need to stay off the meds lol. Thanks!
@keithdouglas71549 ай бұрын
Another great video. Does anyone know what will happen with the site.
@veryhighguy9 ай бұрын
it will become a training and teaching complex for future doctors
@keithdouglas71549 ай бұрын
@@veryhighguy thank-you
@christopherpitchford88599 ай бұрын
What comes shooting out at the three minute mark?
@veryhighguy9 ай бұрын
it was a reflection from the window.
@kenbuckley22119 ай бұрын
The NHS Trust said it was a controlled demolition, tell that to any people walking by with all that dust
@caithnessrailrambler26989 ай бұрын
I don't think the big machine would had been close if it was a controlled demolition at the time. Definitely something went wrong.
@veryhighguy9 ай бұрын
it seemed well under control today when i had a look but i do think something went wrong. I am no expert but if you look on the video the wall gave way two floors down where it was windows (1:36). i personally thing they gave way.
@stephensmith44809 ай бұрын
Something definitely went wrong there, maybe stress cracks that just gave way to the downward force of all that weight above. Nobody hurt, that's the main thing.
@caithnessrailrambler26989 ай бұрын
Yeah i watched it very closely it looked like wall closed in and the whole lot went with it.@veryhighguy
@caithnessrailrambler26989 ай бұрын
@@stephensmith4480I think so too be lots of stress and weight on it and just gave way.
@dominicboyle34859 ай бұрын
Been watching this for the last 5 weeks, some dodgy pushing of concrete pillars over during that time, surely better doing top to bottom, one floor at a time. Dont fancy their chances when working right behind Clatterbridge etc
@caithnessrailrambler26989 ай бұрын
A scary monent there hope the operator is ok. Might had gived him a fright
@veryhighguy9 ай бұрын
iv heard no reports of anyone hurt
@caithnessrailrambler26989 ай бұрын
@@veryhighguy That's good then!
@Bassisace19 ай бұрын
Let’s hope that no individuals were hurt. I would think that site safety will be really tightened up after this. Hopefully, the works will progress smoothly, from here on in.
@robfalcon34049 ай бұрын
That dust ell be bad wow
@veryhighguy9 ай бұрын
Full of asbestos
@johntyrrell65919 ай бұрын
There will be some Health & Safety Investigation there. Lucky there weren't any demolition guys around when that fell
@heavyhaulage19 ай бұрын
@@veryhighguy all asbestos would have been removed
@veryhighguy9 ай бұрын
@@heavyhaulage1 it was all in the concrete
@JamesAnt-tp8mp9 ай бұрын
Just one of them things dsm are leading demo company old building can’t control every thjnk.
@GarryMcHugh-w8b9 ай бұрын
I im a high reach operator that was reckless, leaving the gabble 4 story's high not tied in and cutting a column bellow, I seen it before it happened