Engineering Marvel of this bridge is having Lift portion. The life is also fitted with another Diamond jewel i.e. Overhead wire for E supply by touching Pantograph and Overhead wire also will move up alongwith lift . Superb mechanism and very worthy investment by IR. thanks
@omkarpatil39432 ай бұрын
Congratulations bro 🎉❤
@ganeshmgl79422 ай бұрын
Thanks Arun. No your comments in this video.
@aruncrackz2 ай бұрын
@@ganeshmgl7942 🤗🥰🥰🥰
@ravichandran012 ай бұрын
அருமை
@aruncrackz2 ай бұрын
@@ravichandran01 Nandri
@venkatesansrinivasan47012 ай бұрын
A video from pamban to rameswaram station please
@sridhars49392 ай бұрын
Unless ramanathapuram to mandapam and this bridge electrification completed , only diesel locos,May they do trials on bridge with e loco
@kamalesh65782 ай бұрын
Bro bridge la wire ah use panaga? Or vera ethachu ah
@aruncrackz2 ай бұрын
metal pipe bro
@kamalesh65782 ай бұрын
@@aruncrackz ok bro thank you
@sanjaybhatnagar59442 ай бұрын
Please explain how the electrical wires will work when the bridge central portion will be lifted for passage of ships.
@rajanrg2 ай бұрын
When Lift is placed at bottom, the overhead wire embedded in lift portion will touch the adjoining two poles wired end and get power supply. When Lift is up, the OH wires also will move up alongwith Lift. thanks
@rajeshbabuka12842 ай бұрын
When electrification will be completed between Pamban and Rameswaram
@aruncrackz2 ай бұрын
@@rajeshbabuka1284 noo Only Pamban Bridge Electrification Work completed