RIP to the Teardrop there, hopefully it's repaired. Great video!
@redhen3349 ай бұрын
Thanks, I do wonder if the fault it has would only need some slight adjustments to get it working again. Either way the bell and the signals will only be here for a few more years as the railway line will be upgraded soon for the Inland Rail project.
@howardstrach64794 ай бұрын
Sorry to break it to everyone but the teardrop Bel has unfortunately been replaced with a safetran type 3:(
@JamesJimmaHarding4 ай бұрын
To be fair, that bell sometimes sounded like it was struggling, as it would sometimes ring quite slow and skip beats. There's a video on here that was taken back in 2004 which shows the crossing in action, and the teardrop sounded *very* weak in thst video and couldn't be heard above the hybrid bell.......and that was 20 years ago!!
@jacktherailwayenthusiast33439 ай бұрын
Great video, fingers crossed they can get the teardrop bell operating again.
@redhen3349 ай бұрын
Thanks, if the fault is not too major then I hope they will make the adjustments needed to get it working again
@HybridBell9 ай бұрын
Nice video. Shame the bell no longer works, but it's impressive that it managed to last that long. Testimony to how well they are built.
@redhen3349 ай бұрын
Thanks. These bells are indeed built well so I think it’s possible that this bell would work again if serviced.
@GstarEdmsTrainProductions7 ай бұрын
great video
@therailrangervmtg86589 ай бұрын
Good catch. At least it had a good run. Nice video as well
@redhen3349 ай бұрын
Thanks, I wouldn’t be surprised if the bell dates back to when they put the SG through in the early 1960s so in that case it has done very well to last so long.
@therailrangervmtg86589 ай бұрын
@@redhen334 Sad thing is, it can probably even be fixed easily with some slight adjustments. But it'll most likely end up on the ground
@redhen3349 ай бұрын
@therailrangervmtg8658 yeah, I would be surprised if ARTC actually takes the time to try see what is wrong with the bell instead of just replacing it which would be way easier anyway.
@BryantsRailfanProductions9 ай бұрын
Great video! Rip Teardrop bell
@STYtrainspotter20074 ай бұрын
It does work you just need to shake the pole and it'll fire up
@redhen3344 ай бұрын
I saw christopher2000’s vid of that, tho I was sent some pics not long ago showing a new siemens bell in its place :(
@ThebusofdoomFSX9 ай бұрын
RIP teardrop bell 😢
@redhen3349 ай бұрын
Yep, served well at this crossing.
@howardstrach64799 ай бұрын
Actually the teardrop Bell worked when I caught the XPT running behind an hour on the 20th of January 2024
@howardstrach64799 ай бұрын
I hope ARTC gives the teardrop Bell TLC so it does not get replaced by crappy safetran type 3!>:(
@redhen3349 ай бұрын
Thanks for the update, it was mentioned to me that the gongs can become loose on the teardrops and so the hammer won't hit it sometimes. Either it fixed itself or ARTC caught onto it before I uploaded this video. Hopefully whatever happened it will keep working until inland rail works eventually take it out.
@adambahouche3669 ай бұрын
Don’t replace it :( just chuck a wch e bell or hybrids
@redhen3349 ай бұрын
Will be interesting to see what they do with the bell as it is quite heavy, and the signals are probably going to be replaced in a few years anyway because of inland rail. The other side still has a working hybrid so audible warning at this crossing isn’t totally lost.
@aydoyt9 ай бұрын
Siemens time 😢
@redhen3349 ай бұрын
Yep, this bell was bound to get replaced anyway as this crossing will probably get new signals during inland rail works.
@tomhenry64409 ай бұрын
Reuse one from Puffing Billy
@redhen3349 ай бұрын
I do not think new m bells are allowed on mainline crossings in Victoria apart from puffing billy crossings so that may not be possible.