Sir, can you please share me the excel sheet of ESP calculation
@passionateengineer044 күн бұрын
Please find it in video description
@vtv514311 күн бұрын
Can we consider 0 deg for the butterfly damper
@passionateengineer0410 күн бұрын
@@vtv5143 for what purpose?
@passionateengineer0410 күн бұрын
@vtv5143 zero degree means fully open, but at site, it's not possible that fully opened damper can control the flow.
@ajayvasudevan574311 күн бұрын
Informative
@rahimuddinamini860514 күн бұрын
The excel can't be download
@stonkstrader650329 күн бұрын
Hello Man, Can I request a copy of your excel spreadsheet?
@passionateengineer0429 күн бұрын
You can find link in video description
@yusifmostafa461Ай бұрын
Is this Zoned HVAC design?
@passionateengineer04Ай бұрын
Yes, its individual zone temperature control system.
@abdulrahmanshah6040Ай бұрын
Can you make a video for lift well pressurization for high rise buildings as per NFPA.
@passionateengineer04Ай бұрын
Please watch staircase pressurisation calculation video, it same as lift
@passionateengineer04Ай бұрын
But don't consider open doors
@wown1326Ай бұрын
Any free 90 trial code ?
@passionateengineer04Ай бұрын
You mean for HAP 5.1?
@wown1326Ай бұрын
@passionateengineer04 any version above the 4.9 version
@passionateengineer04Ай бұрын
Crack version is available
@abdulrahmanshah6040Ай бұрын
Can you upload all videos
@passionateengineer04Ай бұрын
You mean part-2
@songanojoshua1651Ай бұрын
what do you mean by cps on number 4 equation
@passionateengineer0416 күн бұрын
Heat release.
@ahmedshafathАй бұрын
How 87.8 wet bulb is possible.
@passionateengineer04Ай бұрын
@ahmedshafath this is just for the purpose of understanding the software. There are different places where WB is above 80. During load calculation, always calculate at 2 conditions ,1- maximum dry bulb temp, 2- at dedumification conditions. The coil will selected either based on condition 1 or 2 which ever is greater.
@ahmedshafathАй бұрын
we can calculate fresh air using HAP, why psychrometric
@passionateengineer04Ай бұрын
You can with HAP, but not always. You must have knowledge of how to do that with psychometric.
@ahmedshafathАй бұрын
@@passionateengineer04 Thanks , is there any video or ASHRAE Psychrometric is enough, I read from it they are stating that " It is best practice to contact a cooling coil manufacturer (or run their cooling coil selection software)
@passionateengineer04Ай бұрын
The best way is to contact the manufacturer, but you have to provide coil ADP, which depends on the loads conditions. Psychometric is a quick way to analyse what you need and what will be provided to manufacturers
@ahmedshafathАй бұрын
Thanks a lot , what about Coil ADP provided by HAP can this be relied.
@passionateengineer04Ай бұрын
It is also good if you did the calculations in the right way because internally, you have no idea how HAP is calculating the coil ADP. HAP is based on heat balance.
@joaopedrosoares27752 ай бұрын
Could you tell me what kind of tool you used to measure? Is this a tool that measures degrees? Another question, where did you get the measurement to mark the tube for bending?
@achristan28332 ай бұрын
you divide volum flow rate ( m3/min ) with specific volume ( m3/kg ) should you get mass flow rate in kg/min instead of kg/s ? since you are using perminute so Q out is kw/min not kw/h correct ?
@passionateengineer042 ай бұрын
There is a formula in the Excel sheet, which is directly converting the value. I'm sorry to show this in the video, but you can follow your calc.
@יוניבןעטר-ט7ל2 ай бұрын
Can you share the excel document?
@passionateengineer042 ай бұрын
It's in the video description. Thank you
@leudishinojosafurones75672 ай бұрын
Does the bender have any notch or any mark for 45, 30, 10, 22.5, 60 ?
@ALLMACIBRAHEMBANTAYAN2 ай бұрын
could you procide a CAD drawing please
@mdsitarekhan5752 ай бұрын
Sir you cont number send me
@moody94143 ай бұрын
can you please share this presentation
@passionateengineer043 ай бұрын
Share your email
@joydipghosh32733 ай бұрын
Can you share this pdf file??? I am also requesting you to share sample heat load excel file or one video for sample heat load + AHU selection.
@passionateengineer043 ай бұрын
Please share your email
@iqubalmit3 ай бұрын
Can you provide me video for isolation room HAP design?
@passionateengineer043 ай бұрын
Sure
@iqubalmit3 ай бұрын
@@passionateengineer04 I'm waiting
@ShashiSanmukhiya3 ай бұрын
Dear Sir, how did you get the value of 0.2 differential pressure inch w.g. for the Q2 calculation?
@passionateengineer043 ай бұрын
Its standard depends on the door opening force. Refer NFPA and ASHRAE handbook
@ShashiSanmukhiya3 ай бұрын
@@passionateengineer04 Do you have design calculation for Fire Lift Shaft pressurisation and fire fighting lobby?
@passionateengineer043 ай бұрын
@ShashiSanmukhiya yes
@ShashiSanmukhiya3 ай бұрын
@@passionateengineer04 can you send me the link for the video on youtube if possible.
@passionateengineer043 ай бұрын
Please share you email
@ronyrufus9503 ай бұрын
Great video sir. But I have a bit of a doubt. In one of our project quote that was given to us the pressure in one of the rooms (bio safety room) is given as negative. No parameters are given in it for pressure..in this case what do I do?
@passionateengineer043 ай бұрын
If you want a detailed calculation, refer to ASHRAE, you need to calculate wall leakage, door leakage, etc. Before this, you need to calculate the required cfm based on ACH min of 20 for cleanrooms
@TheCooljim814 ай бұрын
did you include wastage when calculating the duct area?
@passionateengineer043 ай бұрын
No, it's just area calculation. Wastage will be added in weight sheet
@patriciacardenas51834 ай бұрын
Can you share the cad file? Thank you.
@johneziekelcagape56944 ай бұрын
Nice video sir. Is there an SI unit version of the excel sheet? Thank you
@johneziekelcagape56944 ай бұрын
Can I also get a copy of the drawing?
@passionateengineer044 ай бұрын
Share your email address please
@passionateengineer044 ай бұрын
Sorry, not available
@funtimemathswithar10294 ай бұрын
Can u put a video for ESP calculation for fcu unit which has 90 elbows , transition like for big duct from corner to other .Please kindly link and sheet .Thanks in advance.
@passionateengineer044 ай бұрын
Sure, and I have also selected some topics for other video, but unfortunately, we are busy withn some projects Thank you
@sunitarani36144 ай бұрын
Hiii
@passionateengineer044 ай бұрын
Hi
@Reiman-CompassionCrafter5 ай бұрын
Hi, nice and really very helpful. thank you man ...
@a.m3475 ай бұрын
I sent you email please if you reply 🙏💐
@areenalali5 ай бұрын
Hello , I don't think that using high ACH in load calculation is correct ,, ACH that must be used in HAP is the one related to fresh air requirements , however, the ACH related to cleanliness should be considered to calculate the number of fan filter units to circulate the air through HEPA filters , hope to hear back from you.
@passionateengineer045 ай бұрын
Sorry for that, but you are not right, ACH is a part of load calculation. Based on this, you will select equipment and cfm/ton. Coil load and supply air temp depends on this. Thank you
@areenalali5 ай бұрын
@@passionateengineer04 thanks for your reply ,, but I did many cleanrooms in Canada ,, ACH doesn't mean fresh air ,, these are two different things ,, I agree that fresh air is part if the load calculation and it can be part of the ACH ,, but considering that ALL the ACH is fresh air is something that we don't do .
@passionateengineer045 ай бұрын
Both ACH are part of load calculation. If you are working in Canada, then it's also the same, but the difference is the fresh air unit, like if you are using HRV, makeup air unit etc than you don't need to consider the fresh air ACH. You can do differently, calculate the load, and than put user define air flow based on ACH.
@passionateengineer045 ай бұрын
In which province of Canada are you working? Are you familiar with CSA Z317.2? ALBERTA COLLEGE OF PHARMACY?
@areenalali5 ай бұрын
@@passionateengineer04 I work in Ontario,, would be great if we can have a call to discuss.
@northlifeisgood5 ай бұрын
Hello. I successfully downloaded the trial Avenir LoopCAD "LoopCAD2024-Roth-Setup.exe" file, HOWEVER it will not load on My Apple MacBook M1 laptop running Sonoma 14.5. It wants to open with my Elmedia Flash Player. I adjusted my Flash player, per Apple instructions to open with "Rosetta" but still not opening the ".exe" file. Any idea what the issue is?
@passionateengineer045 ай бұрын
Sorry, i didn't use it on macbook yet, i am using it on Windows 11. You may check the internet for a solution.
@heikg4 ай бұрын
You can try looking up a software for emulating windows 11 on ios and run it there
@funtimemathswithar10296 ай бұрын
Very informative videos.Thanks for sharing ur knowledge. Can u kindly share Esp excel sheet .
@passionateengineer045 ай бұрын
Please check the video description
@blakdon6 ай бұрын
This was really helpful thank you. I did have a question if I have a positive pressure environment located in a lab and I have a heatload within the positive pressure environment, how do I calculate the amount of cfm I'll need to remove the heatload into the lab?
@passionateengineer045 ай бұрын
Sorry, i didn't understand your question, can you please elaborate?
@passionateengineer045 ай бұрын
if you know the load then you can use sensible heat equation that Q= 1.08xcfmxdelT
@mepDesign-q8u6 ай бұрын
You didn’t consider grille pressure drop that will come around 10-20 pa
@vishwajeetjadhav41576 ай бұрын
Sir can we get the soft copy of word file
@passionateengineer045 ай бұрын
Share your email
@yusopmanga91886 ай бұрын
Hi, thank you for your nice video sir.
@3099saaz16 ай бұрын
Why you are wasting time in converting mm to inches go to setting n units and change it ...........................
@engr.muhammadshahid6 ай бұрын
Thank you Sir. I loved your explanation. Can you please share with us the link of the excel sheet for reference. I will be grateful.
@engr.muhammadshahid6 ай бұрын
I got it from the description. You shared it already.
@GEORGEPAPATHANASIOU-b3k3 ай бұрын
Can you please help me where to find the excel file ?
@engr.muhammadshahid3 ай бұрын
@@GEORGEPAPATHANASIOU-b3k go to the video description. The is there
fire area in not as the floor area this will increase the fan m3/s
@passionateengineer046 ай бұрын
It's depends on the situation. The fire area is actually the area separated by fire rated walls if the attrium wall are fire rated and fire will not transfer from internal space like shops etc to the attrium,than only attrium area will be considered as a fire area.
@SonuChoudhary-hd9sg6 ай бұрын
I think there is some problem in this video regarding that and window exposure in its properties you expose all 4-side wall how???
@passionateengineer046 ай бұрын
It's just for calculations.all depends on the building orientation
@ManojSharma-gu8re6 ай бұрын
Sir, can we get the revit arch model of this drawing for practice? Or any other model for practice?
@er.shakeelkhan85886 ай бұрын
Area of Floor & Ceiling =L x W= 17.5 x 8.5 =148.75 sqft but in your calculation showing 297.5 sqft. can u explains how came 279.5 sqft ? Door 7x3 =21 , 20 ft will be gap length.
@passionateengineer046 ай бұрын
First of all its not 21, its 20 and its not 7x3, its (7+3)*2 (perimeter) and second is 17.5*8.5*2= 297.5, these are not like your calculations because these are not cross sectional areas.
@passionateengineer046 ай бұрын
Please first understand the concept, how to calculate the areas etc than go for the other calculations, these are not straight forward cross sectional areas, because i didn't mentioned any cross sectional area, these methods are based on NFPA and ASHRAE, all references are given in excel sheet, go through it and please don't confuse other viewers. Thank you
@NamPham-zl3lt6 ай бұрын
"HEAT RELEASE = 93 KW/M2 FOR FURNATURE 310 KW/M2 FOR CELLULOSICS (ورق كارتون للتعبئه والتغليف و منتجات قطنية) 260 KW/M2 FOR VIHICLES(car park) I can't to find in NFPA 204, NFPA 92 and BS 7436-4? You can hepl me?
@passionateengineer046 ай бұрын
Please share your email, i will send you.
@justpocong74147 ай бұрын
kindly send to me the specifications in a word file, thank you
Do you only calculate air volume, and not pressure needed for air flow to reach the bottom flor?
@passionateengineer047 ай бұрын
These air flow is based on standard pressure as per IBC and need to maintain maximum pressure of 90 pascal, so the door opening force doesn't exceed.
@punginzitaalexandre-mx9ui7 ай бұрын
nice job, send me the link
@chaimaabechkoun12907 ай бұрын
Does installing a smoke extraction system also mean I will handle the ventilation in the parking garage? I mean are they not the same ??
@passionateengineer047 ай бұрын
The fan shall be VFD drive and interlocked with smoke sensors, when the smoke is detected, the fresh air fan will stopped and exhaust fan shall run at high speed to extract the smoke. That why we design parking ventilation at 6 ach normal operation and 10 ach for fire incident.