1966 Chevelle - Replacing the Dutchman Panel

  Рет қаралды 15,649

Allison Customs' - PROJECT CAR TV

Allison Customs' - PROJECT CAR TV

Күн бұрын

Пікірлер: 25
@spottedinsuffolk8306
@spottedinsuffolk8306 2 жыл бұрын
Excellent work. Doing the exact same panel on my 66 here in the UK. Very informative and helpful.
@AllisonCustoms
@AllisonCustoms 2 жыл бұрын
Thanks, good luck on your project!
@michaelkaser2219
@michaelkaser2219 6 жыл бұрын
Also what I did on the sail panel is drilled 3 holes on each and the new panel so that I was able to put a bolt through it and use a nut to pull them together to the perfect width all the way crossed on both sides... worked pretty well.
@Treetop0369
@Treetop0369 7 жыл бұрын
Keep up the good work.. been following this chevelle build for awhile.. can't wait to see it finished.
@AllisonCustoms
@AllisonCustoms 2 жыл бұрын
Thanks, it came out awesome in the end!
@danielalamo2075
@danielalamo2075 5 жыл бұрын
I just found your channel. I sure am enjoying it. I'm hoping to start on my 66 chevelle this summer.
@AllisonCustoms
@AllisonCustoms 5 жыл бұрын
Thanks for watching, good luck on your car!
@luizchevelle7218
@luizchevelle7218 6 жыл бұрын
Since I removed the trunk floor to install a new one, I found out that with the Chevelle on a car lift I can stand under it and have a nice acess to spot weld the Dutchman panel in place. If you have to lay inside the trunk, it's much harder.
@AllisonCustoms
@AllisonCustoms 6 жыл бұрын
Great Tip!!!! Thanks
@CobwebsandCandlesticks
@CobwebsandCandlesticks 6 жыл бұрын
I always put dynamat under a rear shelf when I replace it. I use epoxy sealer instead of rattlecan. That stuff will eventually fail.
@AllisonCustoms
@AllisonCustoms 2 жыл бұрын
Epoxy can be a great product. The rattle can stuff is easy and since the factory put nothing back there, still miles ahead of that.
@jm1551701
@jm1551701 5 жыл бұрын
I am having to change the same panel on my 66, I popped out the rear glass and notices the bottom channel that the rear window sits in is all rusty and I can't find the part to replace so I will just replace the whole dutchman, from there back everything is good, but I want to know if you could tell me where the spot welds are located generally so I can start to remove the panel, thank you.
@AllisonCustoms
@AllisonCustoms 5 жыл бұрын
The spot welds are located in the window channel , about every 2-3”. But it really varies on the build plant and who was working that day. The easiest way to remove that panel is to cut the top skin off about a 1/2” in from the edges and then remove all of the spot welds and perimeter metal. It’s not terribly hard, just takes a lot of time trying to get it all welded back in. You might consider just cutting out the window channel and replacing that piece only, if the rest is good. Jeff
@jm1551701
@jm1551701 5 жыл бұрын
@@AllisonCustoms Thank You Jeff, this helps me a lot, still thinking weather to just replace the panel or just the damaged part, thanks again for your help, I was doing some wire wheel work today and I found the spot welds, like you said with a little bit of elbow grease and some surgical drilling of spot welds I believe that the panel will come up with some what ease, thanks again, will let you know how it came out.
@AllisonCustoms
@AllisonCustoms 5 жыл бұрын
Please Do!
@luizchevelle7218
@luizchevelle7218 6 жыл бұрын
How do you spot welded the sail panel in the trunk? The trunk lid hinge structure gets in the way of the MIG torch. Thanks for any light on the issue. '67 Chevelle owner in Brazil!
@AllisonCustoms
@AllisonCustoms 6 жыл бұрын
I think you are talking about the sail panel to the Dutchman panel, correct? If so, It Just Sucks. I have done it with a mig, but I have a flex neck on my mig gun which lets me move the nozzle around a few obstacles. (www.usaweld.com/Flexible-Neck-MIG-Gun-s/533.htm) If you can get a spot welder, those work a little better for reaching in there, use as long of tongs as you can get. (amzn.to/2IeUhoY) Finally, since most of my builds are custom, I usually weld up that seam on the outside and smooth the whole area. Hope this helps! Jeff
@luizchevelle7218
@luizchevelle7218 6 жыл бұрын
Thanks Jeff. Very helpful advice!
@pollywogstew1792
@pollywogstew1792 6 жыл бұрын
hey Jeff, can you please tell me where you obtained that sail panel? I need two of those and can't find 'em anywhere. thanks and great vids.
@AllisonCustoms
@AllisonCustoms 6 жыл бұрын
I bought a full quarter panel for the driver’s side and it would not fit. So I cut the sail off and sectioned the qtr to make it all work. Then welded the sail back on. I wouldn’t recommend that method for most projects, but it was what this one required. The qtr came from Auto Metal Direct.
@pollywogstew1792
@pollywogstew1792 6 жыл бұрын
thank u much for your time and quick response. looks like i'll have to improvise. keep up the good work.
@Mokearoint
@Mokearoint 4 жыл бұрын
all that padding is going to do is trap moisture & cause more rust.
@AllisonCustoms
@AllisonCustoms 4 жыл бұрын
The “padding” is a closed cell foam that does not hold or trap moisture. Additionally with everything now welded up solid, and the rear window area sealed, there is no entry point for liquids. I would not suggest using any type of material that holds moisture or leaving the weep holes around the window moldings that were common in the these types of vehicles, especially when filling the trunk with carpet and modern electronics. Thanks for pointing out a potential issue - if the wrong materials are used, and Thanks for watching!
@michaelkaser2219
@michaelkaser2219 6 жыл бұрын
I did this exact thing and was able to replace my gutter edge that you're talking about using my old filler panel that I cut out. Check out my video kzbin.info/www/bejne/lWnCmGCwhMidnbM starting at about 3 min in. Bad news is is it looks like you cut yours right along the area that you needed for how I did it.
@AllisonCustoms
@AllisonCustoms 2 жыл бұрын
Thx for the link
Shaving the Drip Rails
18:13
Allison Customs' - PROJECT CAR TV
Рет қаралды 33 М.
Каха и дочка
00:28
К-Media
Рет қаралды 3,4 МЛН
coco在求救? #小丑 #天使 #shorts
00:29
好人小丑
Рет қаралды 120 МЛН
1967 Chevelle Rear Half Welded Up, Quarter and Rear Panel
30:59
RAC GARAGE
Рет қаралды 10 М.
67 Chevelle Full Floor and Toe Board Replacement!
26:54
Vintage Hot Rods
Рет қаралды 5 М.
66 Chevelle LS7 - Part 1 - New Floors, Quarters, & Trunk Pan
8:07
Classic Car Studio
Рет қаралды 52 М.
how to make a patch panel | fix rust
17:22
B.A.M.F
Рет қаралды 1,4 МЛН
1966-1967 Chevelle GM A-body Quarter Window Installation
14:36
Street Classic FabLab
Рет қаралды 3,9 М.
First Startup of the LT4 in the 1966 Chevelle - Orange Evolution
6:07
Allison Customs' - PROJECT CAR TV
Рет қаралды 12 М.
1966 Chevelle quarter glass installation By Scared Shiftless
8:29
How to Fix BAD body panel gaps FAST n EASY -  Metal finish - NO body filler ! D I Y Auto Restoration
16:10
Guzzi Fabrication - D.I.Y Auto Restoration
Рет қаралды 182 М.