FCT Not Determined Error II ETAP Arc Flash Analysis

  Рет қаралды 1,806

Smart Educare

Smart Educare

Күн бұрын

FCT Not Determined Error may arise while performing Arc Flash Analysis.
ETAP Arc Flash Analysis is performed using ETAP to check for the safe working distance from electrical live parts.
Join this channel to get access to perks:
/ @smarteducare
Arc flash studies using ETAP
Understanding Arc-Flash Calculations
Arc Flash Analysis Using ETAP
IEEE 1584-2018 Arc Flash Incident Energy Calculation Method using ETAP
Arc Flash Studies Simplified
arc flash analysis
etap arc flash analysis
arc flash analysis software
arc flash analysis calculations
arc flash analysis training
nfpa 70e arc flash analysis requirements
arc flash hazard analysis and mitigation
what is an arc flash hazard analysis
arc flash and short circuit analysis
what is arc flash analysis

Пікірлер: 10
@user-cb3oq2cy5s
@user-cb3oq2cy5s 10 ай бұрын
Error is resolved now...thanks a lot for your support
@SmartEducare
@SmartEducare 10 ай бұрын
Thanks 👍 Stay tuned
@electriko
@electriko 7 ай бұрын
Excelent video, could you share the model with us? Iby OneDrive for example. Thanks in advance.
@SmartEducare
@SmartEducare 6 ай бұрын
Can share the PDF file
@jobsebastian94
@jobsebastian94 Ай бұрын
Hi Sir, what could be the reason if the "FCT not determined" error still showing against ACB even when the trip device is selected? Please support, Thanks.
@hanial-shadadi9122
@hanial-shadadi9122 10 ай бұрын
thank u very much
@SmartEducare
@SmartEducare 10 ай бұрын
You are most welcome
@ledepart.design
@ledepart.design 7 ай бұрын
Hi, We need Etap AF study. Can you support?
@Ashrafelsharpiny
@Ashrafelsharpiny 6 ай бұрын
How to change AFB from ft to m
@englandrasmussen3111
@englandrasmussen3111 2 ай бұрын
This is likely a setting that is adjusted based on your system frequency. There is possibly another setting to adjust this specifically but I know a lot of the units are changed when modelling within the 50hz systems compared to the 60hz.
How to restore Default Data of Components in ETAP Model
4:55
Smart Educare
Рет қаралды 440
Help Me Celebrate! 😍🙏
00:35
Alan Chikin Chow
Рет қаралды 75 МЛН
Кәсіпқой бокс | Жәнібек Әлімханұлы - Андрей Михайлович
48:57
Harmonic Analysis using ETAP - IEEE519 (Part-1)
26:15
Smart Educare
Рет қаралды 747
Capacitor Bank Sizing Calculation for Power Factor Improvement
13:37
ETAP Short Circuit Study II Device Duty & 3 Phase Fault Analysis
12:15
Cable Tray Routing Layout II Explained with Practical Example
9:08
Smart Educare
Рет қаралды 1,3 М.
Capitalization Cost Calculation of Transformer Losses
12:51
Smart Educare
Рет қаралды 366